LCOE analysis of Tiger Neo 3.0 and BC – Jinko Solar

The PV industry has never stopped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.

The PV industry has never stoped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.  Its latest Tiger Neo 3.0 claimed of 650-670Wp power output, 85+/- 5% Bifacility, -0.26% temp coefficient, -0.35% linear degradation, 96.77% low irradiance performance (200W/m²), etc., provides chance of lowering the levelised cost of energy (LCOE)than traditional TOPCon and N-type BC. 

This paper is purposed to compare the LCOE of Tiger Neo 3.0 and its N-type BC in different scenarios as follows, based in the supposition that the price of Tiger Neo 3.0 is same with N-BC module,module information is listed in table 1. We chose four project scenarios (two rooftop, two utility scale) and four locations with typical climate features, irradiance levels and balance of system (BOS) cost levels.  

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

Energy generation is simulated with the PVsyst software. The Tiger Neo 3.0 and N-type BC module PAN file is based on the actual performance provided by Jinkosolar while the PAN files of N-type BC are based on a general industry-wide performance level. 

We chose four typical locations, including Kagoshima (Japan), Berlin (Germany), Dubai (UAE), Qinghai (China). Their annual average irradiance and annual average temperature are listed in table 2.  

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

The calculation for LCOE is the net present value of total life cycle costs of the project, divided by the net present value of energy produced over the system’s lifetime. The total life cycle costs can be disaggregated as initial investment, annual cost, depreciation tax benefit and system residual value. The initial investment (US$/Wdc) is the sum of the BOS cost and the module price. Module prices and BOS cost of Tiger Neo 3.0 and N-type BC are assumed to be the same at each location. 

The AC capacity of the utility-scale plant is designed to be 100MW, 1500V system voltage, single axis tracker, albedo 30% in Dubai and 120MW, 1500V system voltage, fixed mounted, 20% albedo in Qinghai . The system lifetime is 30 years. 

Results 

The energy yield gain of Tiger Neo 3.0 over N-type BC at modeled Dubai and Qinghai utility project is 3.52% and 3.28% respectively, primarily attributed to Tiger Neo 3.0’s  higher bifacility and outstanding performance at high temperature. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 3.45% and 3.60% lower in Dubai and Qinghai. 

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

In contrast, the two rooftop projects of 500kW in Kagoshima,Japan and 1MW Berlin German features of low contribution of bifacility result in the less energy yield gain over BC of 0.54% and 0.77% respectively mainly due to better low light performance of Tiger Neo 3.0 as shown in table 3. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 1% and 1.11% lower in Kagoshima and Berlin. 

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

The two products of same power exhibit different performance in energy generation due to their differences in bifacial factors, performance in low irradiance, first-year degradation values which can be primarily attributed to light-induced degradation (LID).  

Conclusion  

It should be pointed out that the module prices of Tiger Neo 3.0 and N-type BC and BOS cost are assumed to be the same in LCOE analysis. In most cases, the LCOE of Tiger Neo 3.0 is lower  than N-type BC, and more competitive with fixed mounted or tracker system, high ground albedo, high temperature. In rooftop systems where bifacility advantage can not play to full, the better low irradiance performance of Tiger Neo 3.0 translates into longer working hour, which allows it to perform well throughout the year.  

Regarding energy generation, Tiger Neo 3.0 is higher than N-type BC, especially in hot and sunny regions with high albedo. This is due to their advantage of high bifaciality and low temperature coefficient. On the other hand, in rooftop installations, particularly in high latitude with low  irradiance or humid regions with more rainy and cloudy weather, the advantage of low light performance of Tiger Neo 3.0 prolongs the generation hour per day and per year. In LCOE analysis, Tiger Neo 3.0 has the high priorities in most scenarios and all climate and environment. 


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Top Stories Of The Day: Brookfield Launches Lumara; MNRE Revises ALMM Order; POWERGRID Floats BESS Tender; NLC Wins 900 MW Solar; PSPCL Plans Digital Net Metering and More…

    Brookfield has launched Lumara, a new renewable energy platform backed by a US$600 million investment, reinforcing its long-term commitment to India’s clean energy sector. The platform will focus on accelerating…

    Explained: Energy Management Systems (EMS)—The Brain Behind Utility-Scale Solar and Storage

    As renewable energy projects become larger and more complex, simply generating electricity is no longer enough. Modern solar plants and Battery Energy Storage Systems (BESS) must continuously respond to changing…

    Have You Seen?

    Agricultural company launches CCS operations at Kansas ethanol plant

    • July 31, 2026
    Agricultural company launches CCS operations at Kansas ethanol plant

    Top Stories Of The Day: Brookfield Launches Lumara; MNRE Revises ALMM Order; POWERGRID Floats BESS Tender; NLC Wins 900 MW Solar; PSPCL Plans Digital Net Metering and More…

    • July 31, 2026
    Top Stories Of The Day: Brookfield Launches Lumara; MNRE Revises ALMM Order; POWERGRID Floats BESS Tender; NLC Wins 900 MW Solar; PSPCL Plans Digital Net Metering and More…

    Video | Linde Q2 results at-a-glance

    • July 31, 2026
    Video | Linde Q2 results at-a-glance

    Explained: Energy Management Systems (EMS)—The Brain Behind Utility-Scale Solar and Storage

    • July 31, 2026
    Explained: Energy Management Systems (EMS)—The Brain Behind Utility-Scale Solar and Storage

    Vikran Engineering Secures INR 120.69 Crore POWERGRID Contract for 400 kV GIS Substation Package SS-147

    • July 31, 2026
    Vikran Engineering Secures INR 120.69 Crore POWERGRID Contract for 400 kV GIS Substation Package SS-147

    Week in Middle East: Oman Floats 3 GW Tender; BP Plans Lightsource Sale; Shanxi Wins Oman EPC; DEWA Expands Globally; Oman Revises RE Rules and More…

    • July 31, 2026
    Week in Middle East: Oman Floats 3 GW Tender; BP Plans Lightsource Sale; Shanxi Wins Oman EPC; DEWA Expands Globally; Oman Revises RE Rules and More…

    Oil Companies Signing Agreements in Venezuela, But Delays Persist

    • July 31, 2026
    Oil Companies Signing Agreements in Venezuela, But Delays Persist

    New Bill introduced to increase CDR technologies

    • July 31, 2026
    New Bill introduced to increase CDR technologies

    Jakson Green’s Odisha Renewable Hydrogen and Green Ammonia Project Achieves CertifHy EU Precertification

    • July 31, 2026
    Jakson Green’s Odisha Renewable Hydrogen and Green Ammonia Project Achieves CertifHy EU Precertification

    Linde posts record Q2 sales as electronics demand drives growth

    • July 31, 2026
    Linde posts record Q2 sales as electronics demand drives growth