Studsvik acquires Swedish SMR project development firm

The enterprise value of Kärnfull Next – which specialises in technology-agnostic small modular reactor (SMR) project development – in the transaction is about EUR6.5 million (USD7.5 million) on a cash-free, debt-free, basis. EUR3 million will be paid in cash and EUR3.5 million in newly issued Studsvik shares at closing. Additional consideration of up to EUR2 million in shares may be payable through staged payments to 2029, alongside performance-based earn-outs of up to EUR14 million linked to the successful development and sale of project development companies.

Subject to customary conditions and regulatory approvals, the transaction is expected to close during the second quarter of 2026.

“The move marks a strategic step as governments and industry increasingly turn to nuclear power to support energy security, electrification, and net-zero ambitions,” Studsvik said. “By adding project development capability, Studsvik will now be able to support nuclear projects from their earliest stages through to operation and decommissioning … the company is expected to announce further partnerships that demonstrate how this expanded capability will be applied in practice.”

“Together, Studsvik and Kärnfull Next will build a truly integrated nuclear services platform – and establish Studsvik as the home for entrepreneurial ambition in nuclear,” said Daniel Aegerter, founder and CEO of Armada Investment AG and the largest shareholder in Studsvik.

Studsvik AB President and CEO Karl Thedéen added: “Kärnfull Next’s project development expertise combined with Studsvik’s unrivalled technical capabilities creates a compelling platform for growth.”

Under the agreement, Kärnfull Next founders Christian Sjölander and John Ahlberg will join Studsvik’s executive team. “Together, we will accelerate Studsvik’s transformation into a truly integrated nuclear services champion,” they said.

In 2023, Studsvik signed a memorandum of understanding with Kärnfull Next to investigate the possibility of constructing and operating SMRs on the Studsvik industrial site near Nyköping on Sweden’s east coast. Studsvik said the site is in a strategic location and houses the company’s broad expertise in nuclear technology, including fuel and materials technology, reactor analysis software and fuel optimisation, decommissioning and radiation protection services as well as technical solutions for handling, conditioning and volume reduction of radioactive waste.

In March 2022, Kärnfull Next signed a memorandum of understanding with GE Hitachi Nuclear Energy on the deployment of the BWRX-300 in Sweden.

Kärnfull Next has been conducting site selection and feasibility studies in several municipalities in Sweden since 2022. By establishing multiple SMR parks as part of the same programme, the company expects to achieve economies of scale in terms of technology selection, construction partners, power purchase agreements and financing partners. In February last year, the company secured land rights for the project to build a power plant based on SMRs in the municipality of Valdemarsvik in Östergötland county in southeastern Sweden.

   

  • Related Posts

    Flushing of safety systems begins for Kudankulam unit 3

    Nuclear Power Corporation of India Limited (NPCIL) called it “a significant stride in India’s journey towards energy security and sustainability”. The flushing process, using demineralised water, is designed to check everything…

    Fuel loading begins for Bangladesh’s first nuclear power plant

    Loading of nuclear fuel in a new reactor is a key moment in the construction of any new nuclear power reactor. It is the first stage of the unit’s key…

    Have You Seen?

    Envision adopts book-and-claim system for 500MW Chinese green ammonia plant

    • April 29, 2026
    Envision adopts book-and-claim system for 500MW Chinese green ammonia plant

    TotalEnergies Q1 profit buoyed by LNG production

    • April 29, 2026
    TotalEnergies Q1 profit buoyed by LNG production

    Hyroad secures full output from Texas hydrogen station with on-site production

    • April 29, 2026
    Hyroad secures full output from Texas hydrogen station with on-site production

    US Pump Prices Near 4-Year High on Iran War Disruption, Refinery Outages

    • April 29, 2026
    US Pump Prices Near 4-Year High on Iran War Disruption, Refinery Outages

    Higher Oil Prices Lift Sinopec Profit 28% in First Quarter

    • April 29, 2026
    Higher Oil Prices Lift Sinopec Profit 28% in First Quarter

    Germany Scrambles for Polish Oil Route as Russia Halts Druzhba Flows

    • April 29, 2026
    Germany Scrambles for Polish Oil Route as Russia Halts Druzhba Flows

    Crude Inventories Continue to Decline Amid Strong Oil Product Draws

    • April 29, 2026
    Crude Inventories Continue to Decline Amid Strong Oil Product Draws

    Trump Readies for Prolonged US Blockade of Hormuz

    • April 29, 2026
    Trump Readies for Prolonged US Blockade of Hormuz

    EU Urges Southeast Asia to Diversify Oil Supply without Leaning on Russia  

    • April 28, 2026
    EU Urges Southeast Asia to Diversify Oil Supply without Leaning on Russia  

    Asia’s LNG Imports Hit 7-Year March Low as War Chokes Qatari Supply

    • April 28, 2026
    Asia’s LNG Imports Hit 7-Year March Low as War Chokes Qatari Supply