Rosatom ‘ready to answer all Paks II questions’

His comments, reported by Russia’s official Tass news agency, follows the victory in the Hungarian elections of Péter Magyar’s Tisza Party. Magyar, who is set to assume the role of prime minister next month, has said he plans to review the Paks II project, including its cost.

Speaking to reporters during a visit to Cairo, Tass reported that Likhachev said: “We will answer all questions, about the price too. All the decisions were made absolutely publicly, in cooperation with the IAEA, in cooperation with international experts. And for us this is not a problem, it’s part of our job.”

He said they were ready for “an examination of the effectiveness of the project, the validity of its price and other parameters. We have nothing to hide and expect similar trust in the implementation of this project. This is not a Russian or Rosatom project. This project is purely in the interests of the Hungarian people.

“What it will do cannot be overstated: more than 70% of Hungary’s energy mix will be stable nuclear electricity. This will cover not only Hungary’s own energy supply, but also give it the opportunity to export the most valuable thing in Europe today – energy in general and electric power in the first place. This will make the Hungarian state and the Hungarian people self-sufficient and independent, and also make it extremely competitive as an economic operator.”

Background

The Paks plant, 100 kilometres south of Budapest, currently comprises four Russian-supplied VVER-440 pressurised water reactors, which started up between 1982 and 1987. An inter-governmental agreement was signed in early 2014 for Russian enterprises and their international subcontractors to supply two VVER-1200 reactors at Paks as well as a Russian state loan of up to EUR10.0 billion (USD10.5 billion) to finance 80% of the project.

The construction licence application was submitted in July 2020, the licence was issued in August 2022, and a construction timetable was agreed in 2023, with a target to connect the new units to the grid at the beginning of the 2030s. The Hungarian Atomic Energy Authority issued permits in November for first concrete pouring for the foundation of what will be Paks unit 5.

The project is the first Russian nuclear energy construction project started in a country while it is a member of the European Union, and is taking place despite sanctions targeting Russia. It is the first pouring of first concrete for any nuclear energy unit in the European Union since first concrete was poured in the then EU member country, the UK, for Hinkley Point C unit 2 in December 2019.

   

  • Related Posts

    Podcast: World Nuclear Symposium 2026

    People featured, in order of appearance: Sama Bilbao y León, Director General, World Nuclear Association Mark Muldowney, MD, Energy, Resources and Infrastructure, BNP Paribas Alejandro López Delgado, Managing Director, Infrastructure,…

    Hydraulic tests completed at Turkey’s Akkuyu 1

    During the tests, the pressure in the primary circuit (the reactor, main circulation pumps, steam generators, the pressuriser, and the main circulation pipeline connecting them) was increased to 24.5 MPa…

    Have You Seen?

    Australia Close to Finalizing Gas Reservation Plan for LNG Exporters

    • October 9, 2026
    Australia Close to Finalizing Gas Reservation Plan for LNG Exporters

    Hormuz Crisis Leaves EU Gas Storage Short Heading Into Winter

    • October 9, 2026
    Hormuz Crisis Leaves EU Gas Storage Short Heading Into Winter

    Asian Refiners Ditch U.S. Oil as Supertanker Rates Hit $82 Million

    • October 9, 2026
    Asian Refiners Ditch U.S. Oil as Supertanker Rates Hit $82 Million

    Samruk-Energy And O-GREEN Partner To Develop 2 GW Solar And Wind Projects Across Kazakhstan And Global Markets

    • October 9, 2026
    Samruk-Energy And O-GREEN Partner To Develop 2 GW Solar And Wind Projects Across Kazakhstan And Global Markets

    Africa GreenCo And AXIAN Group Sign PPA For 200 MW Kudu Solar Project In Zambia

    • October 9, 2026
    Africa GreenCo And AXIAN Group Sign PPA For 200 MW Kudu Solar Project In Zambia

    US DOW awards conditional $1.5bn loan to bandgap semiconductor firm

    • October 9, 2026
    US DOW awards conditional $1.5bn loan to bandgap semiconductor firm

    121 Gulf Platforms Evacuated as Isaias Gets Stronger

    • October 9, 2026
    121 Gulf Platforms Evacuated as Isaias Gets Stronger

    RECPDCL Floats INR 49.09 Crore Tender For ICAR Rooftop Solar Projects Across Multiple States

    • October 9, 2026
    RECPDCL Floats INR 49.09 Crore Tender For ICAR Rooftop Solar Projects Across Multiple States

    Brent Holds Above $100 as Hormuz Tanker Traffic Hits Two-Month Low

    • October 9, 2026
    Brent Holds Above $100 as Hormuz Tanker Traffic Hits Two-Month Low

    China Restarts Fuel Exports

    • October 9, 2026
    China Restarts Fuel Exports