ACME Solar Commissions 51.87 MW BESS Capacity In Rajasthan

ACME Solar Holdings Limited has announced the commissioning of additional battery energy storage system (BESS) capacity in Rajasthan through its wholly owned subsidiary, ACME Sigma Urja Private Limited. The company disclosed two commissioning milestones on November 20, 2026, covering projects located at Neemri village in Rawatbhata tehsil of Chittorgarh district, Rajasthan. Following these developments, the subsidiary has achieved a cumulative commissioned BESS discharge capacity of 175.72 MW / 733.939 MWh, with an installed capacity of 175.72 MW / 792.418 MWh.

In its first regulatory filing submitted to BSE Limited and the National Stock Exchange of India, ACME Solar reported that ACME Sigma Urja commissioned a discharge capacity of 35.81 MW / 148.645 MWh. The installed capacity of this commissioned portion stands at 35.81 MW / 160.48 MWh.

This capacity forms part of a larger 50 MW / 209 MWh discharge capacity battery energy storage system, with an overall installed capacity of 50 MW / 220 MWh. The storage component is associated with the company’s TATA FDRE Power Project. ACME Solar clarified that only the battery energy storage system portion has been commissioned so far, while the commercial operation date (COD) is scheduled for November 22, 2026. The project is supported by a power purchase agreement (PPA) signed with The Tata Power Company Limited.

In a separate regulatory disclosure, the company announced the commissioning of an additional 16.06 MW / 69.678 MWh of BESS discharge capacity at the same project location. The installed capacity of this additional portion stands at 16.06 MW / 75.225 MWh.

This commissioning forms part of a larger 250 MW / 1,069 MWh discharge capacity firm and dispatchable renewable energy (FDRE) project, which has an overall installed capacity of 250 MW / 1,150 MWh. The company stated that this development follows an earlier intimation dated October 31, 2026. The commercial operation date for the newly commissioned capacity is also scheduled for November 22, 2026.

With the latest additions, ACME Sigma Urja has strengthened its operational energy storage portfolio, taking its cumulative commissioned BESS discharge capacity to 175.72 MW / 733.939 MWh. The corresponding installed capacity has reached 175.72 MW / 792.418 MWh.

Both disclosures were made under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The regulatory filings were signed by Rajesh Sodhi, Company Secretary and Compliance Officer of ACME Solar Holdings Limited.

The latest commissioning milestones reflect the company’s continued progress in developing grid-scale battery storage infrastructure alongside renewable energy projects in India. Battery energy storage systems are expected to play an important role in supporting renewable energy integration, improving power supply flexibility and enabling reliable electricity delivery during periods of changing generation and demand.


Discover more from SolarQuarter

Subscribe to get the latest posts sent to your email.

RELATED ARTICLES

Subscribe Today

GET EXCLUSIVE FULL ACCESS TO PREMIUM CONTENT

SUPPORT CLEANTECH JOURNALISM

EXPERT ANALYSIS OF AND EMERGING TRENDS

TOPICAL VIDEO WEBINARS

Get unlimited access to our EXCLUSIVE Content and our archive of subscriber stories.

Exclusive content this week

Latest article

 

  • Related Posts

    Waaree Energies Signs PPA With SECI For 700 MW Solar And 2,800 MWh Storage Project In Maharashtra

    Waaree Forever Energies, a wholly owned subsidiary of Waaree Energies, signed a PPA with SECI on November 20, 2026, to develop a 700 MW solar project with a 700 MW/2,800…

    Hoymiles India Ties Festive Visit to Setu Foundation to Its ‘Open Energy for All’ Message  

    The Hoymiles India team marked the festive season by visiting Setu Foundation, where team members shared sweets and spent time with children supported by the organisation. Hoymiles described the children’s…

    Have You Seen?

    Waaree Energies Signs PPA With SECI For 700 MW Solar And 2,800 MWh Storage Project In Maharashtra

    • November 21, 2026
    Waaree Energies Signs PPA With SECI For 700 MW Solar And 2,800 MWh Storage Project In Maharashtra

    Hoymiles India Ties Festive Visit to Setu Foundation to Its ‘Open Energy for All’ Message  

    • November 21, 2026
    Hoymiles India Ties Festive Visit to Setu Foundation to Its ‘Open Energy for All’ Message  

    SECI Cancels Tender for Two Agri-PV Projects on Agricultural Land in Delhi

    • November 21, 2026
    SECI Cancels Tender for Two Agri-PV Projects on Agricultural Land in Delhi

    National Wealth Fund And Matrix Renewables Partner On 1 GW Battery Storage Projects In Scotland

    • November 21, 2026
    National Wealth Fund And Matrix Renewables Partner On 1 GW Battery Storage Projects In Scotland

    SECI Invites Bids From Power Traders To Manage Renewable Energy Trading Across Its 65.8 GW Portfolio

    • November 21, 2026
    SECI Invites Bids From Power Traders To Manage Renewable Energy Trading Across Its 65.8 GW Portfolio

    Zambia Awards First Two Contracts for US$292 Million Tanzania Power Interconnector Project

    • November 21, 2026
    Zambia Awards First Two Contracts for US$292 Million Tanzania Power Interconnector Project

    Grid Stability: Enabling a Stronger and More Reliable Renewable Energy Future

    • November 21, 2026
    Grid Stability: Enabling a Stronger and More Reliable Renewable Energy Future

    BluPine Energy Signs 50 MWp Renewable Energy PPA With Godawari Power And Ispat In Chhattisgarh

    • November 21, 2026
    BluPine Energy Signs 50 MWp Renewable Energy PPA With Godawari Power And Ispat In Chhattisgarh

    NTPC-SAIL Power Company Invites Bids For 25 MW Solar Project In Bhilai, Chhattisgarh

    • November 21, 2026
    NTPC-SAIL Power Company Invites Bids For 25 MW Solar Project In Bhilai, Chhattisgarh

    B.Grimm Power Starts 364.8 MW Offshore Wind Operations In South Korea, Advances 340 MW Project

    • November 21, 2026
    B.Grimm Power Starts 364.8 MW Offshore Wind Operations In South Korea, Advances 340 MW Project