Airports Authority of India Invites ₹178.17 Lakh Solar Rooftop Tender For Dehradun Airport

Representational image. Credit: Canva

Airports Authority of India has invited e-tenders for the work of design, supply, installation, testing, and commissioning of an online grid-connected rooftop solar power plant at different buildings of Dehradun Airport. The notice was issued on August 19, 2025, with an estimated cost of ₹178.17 lakh, which includes ₹155.25 lakh for DSITC work and ₹22.92 lakh for 8 years of AICMC after a 2-year defect liability period. The completion period of the project is set at three months.

The tendering process is being conducted through the CPP portal, and interested bidders can download the documents online. The tender fee has been fixed at ₹1,180, including GST, which is non-refundable. The earnest money deposit (EMD) required for participation is ₹4,66,000, payable only through the online payment gateway of the CPP portal. The successful bidder will be required to furnish a performance bank guarantee or security deposit equivalent to the EMD amount before the EMD refund is processed.

As per the critical dates mentioned, the tender was published on August 19, 2025, while the sale of bid documents and the start of clarifications began on August 20, 2025. The last date for seeking clarifications is August 31, 2025, up to 6:00 PM. The submission of bids also opened on August 20, 2025, and will continue until September 11, 2025, up to 12:00 noon. The technical bids will be opened on September 12, 2025, at 1:00 PM, while the financial bids are scheduled to be opened on September 19, 2025, tentatively.

The tender follows a two-envelope system, where Envelope I will contain the technical bid and pre-qualification documents, and Envelope II will include the financial bid. Bidders are required to meet specific eligibility criteria, including having completed similar works in the past seven years of a value not less than the specified thresholds. Additionally, they must demonstrate an annualized average financial turnover of ₹54.96 lakh over the last three years and a minimum net worth of ₹23.29 lakh, certified by a Chartered Accountant with UDIN.

AAI has reserved the right to accept or reject any bid without assigning reasons, and also to call off the process at any stage. The project aims to promote renewable energy at Dehradun Airport by installing rooftop solar plants to ensure clean and sustainable energy use.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Top Stories Of The Day: Meta-Reliance 168 MW AI Data Center; NLC OFS Expanded to 4.16 Cr Shares and More…

    Meta has partnered with Reliance Industries to establish a 168 MW AI-focused data center in India, supported by nearly 1 GW of newly developed renewable energy capacity. The initiative represents…

    Explained: Inside a Perovskite-Silicon Tandem Cell—How Layered Photovoltaics Achieve 30%+ Efficiency

    Diagram explaining the structure and spectral use of a layered multi-junction solar module. As the solar industry pushes beyond the efficiency limits of conventional silicon photovoltaics, perovskite-silicon tandem cells are…

    Have You Seen?

    WinGD delivers ammonia-fuelled vessel to Exmar

    • June 10, 2026
    WinGD delivers ammonia-fuelled vessel to Exmar

    Large bank syndicate to fund Commonwealth LNG project

    • June 10, 2026
    Large bank syndicate to fund Commonwealth LNG project

    U.S. Company to Send 250,000 Barrels of Fuel to Cuba

    • June 10, 2026
    U.S. Company to Send 250,000 Barrels of Fuel to Cuba

    Alberta Eyes General Corridor for New Pacific Oil Pipeline

    • June 10, 2026
    Alberta Eyes General Corridor for New Pacific Oil Pipeline

    China Begins Tapping Oil Stockpiles as Middle East Crisis Drags On

    • June 10, 2026
    China Begins Tapping Oil Stockpiles as Middle East Crisis Drags On

    Oil Steady as Investors Weigh Renewed US-Iran Fighting

    • June 10, 2026
    Oil Steady as Investors Weigh Renewed US-Iran Fighting

    Trump Says Iran Has Taken Too Long to Negotiate, Will ‘Pay the Price’

    • June 10, 2026
    Trump Says Iran Has Taken Too Long to Negotiate, Will ‘Pay the Price’

    War Erases 1B Barrels of Cumulative Oil Supply from Market

    • June 10, 2026
    War Erases 1B Barrels of Cumulative Oil Supply from Market

    Top Stories Of The Day: Meta-Reliance 168 MW AI Data Center; NLC OFS Expanded to 4.16 Cr Shares and More…

    • June 10, 2026
    Top Stories Of The Day: Meta-Reliance 168 MW AI Data Center; NLC OFS Expanded to 4.16 Cr Shares and More…

    Explained: Inside a Perovskite-Silicon Tandem Cell—How Layered Photovoltaics Achieve 30%+ Efficiency

    • June 10, 2026
    Explained: Inside a Perovskite-Silicon Tandem Cell—How Layered Photovoltaics Achieve 30%+ Efficiency