Chemi Tech Launches One of India’s Largest MMS Manufacturing Units

Chemi Tech Group, continuing its expansion into solar manufacturing, has commenced operations at its new Solar Module Mounting Structure (MMS) production facility near Jaipur.

Strategically located on the Delhi-Mumbai Expressway, the unit enjoys excellent connectivity—just 2 hours from Delhi, 1 hour from Jaipur, and capable of serving all major locations in Uttar Pradesh within 4–8 hours. Key destinations across Maharashtra, Gujarat, and South India can be reached within 24–48 hours, enabling Chemi Tech to ensure swift and reliable deliveries across India.

The plant will manufacture Hat Purlins, C-sections, U-sections, and Strut Channels in thicknesses ranging from 0.8 mm to 3 mm. Customers can choose from a variety of material options including Hot Dip Galvanized, Galvalume, Pre-GI, and Magnelis. With an initial production capacity of 50,000 tonnes per annum—equivalent to supporting over 2,000 MW of solar projects—the company aims to scale up to 75,000 tonnes by the end of 2025, and 150,000 tonnes per annum by 2027.

This is Chemi Tech’s second manufacturing facility. Its first unit, located in Hyderabad, produces FRP Walkways, Cable Trays, and Handrails. The Hyderabad unit is also expected to begin production of FRP-based Solar MMS by the end of this year, further expanding the company’s product offerings.

Equipped with high-precision roll-forming lines and robust in-house engineering capabilities, the Jaipur facility offers structural design services using STAAD and FEA—provided to customers at no additional cost. These services help ensure that each mounting structure is optimized for strength, durability, and site-specific conditions and wind loads.

Aided by ERP-enabled tracking systems and a strong logistics network, Chemi Tech is committed to fast, dependable delivery and project support throughout the country. The facility also adopts a sustainability-first approach, incorporating solar power generation, rainwater harvesting, and waste recycling—underscoring Chemi Tech’s commitment to responsible manufacturing.

Speaking on the occasion, Divyam Gupta of Chemi Tech Group said, “We noticed a significant gap in the rooftop solar market particularly the lack of awareness and focus on MMS quality. Many installers still rely on outdated or substandard materials.

Through this new facility, we aim to introduce advanced materials like Galvalume and Magnelis to the mainstream and raise the overall quality benchmark for MMS in the rooftop sector. Naturally, we will cater to Ground-Based projects as well, but this unit will be a turning point in Rooftop MMS, especially Pradhan Mantri Suryaghar Scheme” Chemi Tech plans to stock the material at all the 12 warehouses across the country. With this facility, Chemi Tech Group takes a decisive step toward building a more reliable, scalable, and future-ready backbone for India’s solar infrastructure.

 

  • Related Posts

    GAIL Invites Bids For 600 MW Solar PV Project With 275 MW/550 MWh BESS At Jhansi Solar Park In Uttar Pradesh

    GAIL (India) Limited has issued a tender for bids to develop a 600 MW solar PV power plant and a 275 MW/550 MWh battery energy storage system in Uttar Pradesh,…

    Indian Green Energy And Power Stocks End Mixed As Select Battery And Renewable Shares Gain (21 July 2026)

    Indian green energy and power sector stocks ended the trading session on a mixed note, reflecting the cautious mood seen across the broader Indian equity markets. Benchmark indices closed lower,…

    Have You Seen?

    M&A: Magnolia Oil & Gas to Buy WildFire Energy in $4.06 Billion Deal

    • July 21, 2026
    M&A: Magnolia Oil & Gas to Buy WildFire Energy in $4.06 Billion Deal

    Oil Prices Ease as Mediators Propose US-Iran Ceasefire

    • July 21, 2026
    Oil Prices Ease as Mediators Propose US-Iran Ceasefire

    Oil-Service Companies Set to Reveal War’s Impact on Earnings

    • July 21, 2026
    Oil-Service Companies Set to Reveal War’s Impact on Earnings

    Oregon consortium wins up to $160m for regional semiconductor development

    • July 21, 2026
    Oregon consortium wins up to $160m for regional semiconductor development

    Align carbon capture chemistry with industrial reality from outset

    • July 21, 2026
    Align carbon capture chemistry with industrial reality from outset

    GAIL Invites Bids For 600 MW Solar PV Project With 275 MW/550 MWh BESS At Jhansi Solar Park In Uttar Pradesh

    • July 21, 2026
    GAIL Invites Bids For 600 MW Solar PV Project With 275 MW/550 MWh BESS At Jhansi Solar Park In Uttar Pradesh

    New UK Energy Secretary ‘understands renewable gas’

    • July 21, 2026
    New UK Energy Secretary ‘understands renewable gas’

    Indian Green Energy And Power Stocks End Mixed As Select Battery And Renewable Shares Gain (21 July 2026)

    • July 21, 2026
    Indian Green Energy And Power Stocks End Mixed As Select Battery And Renewable Shares Gain (21 July 2026)

    Just 8 Days Left Until Chhattisgarh’s Largest Solar & Storage Expo 2026  

    • July 21, 2026
    Just 8 Days Left Until Chhattisgarh’s Largest Solar & Storage Expo 2026  

    Egypt-Emirati Consortium To Invest EGP 20 Billion In 500 kV Renewable Power Transmission Line

    • July 21, 2026
    Egypt-Emirati Consortium To Invest EGP 20 Billion In 500 kV Renewable Power Transmission Line