Data4 and Westinghouse to evaluate AP300 for data centre deployment

Wednesday, 12 March 2025

Data4 and Westinghouse to evaluate AP300 for data centre deployment
The memorandum of understanding was signed in Paris by Fragman (on the left) and Micheli (Image: Businesswire)

The AP300 – which is based on the Westinghouse AP1000 pressurised water reactor – has been selected by Data4 as its technology of choice in a memorandum of understanding signed by the two companies on 11 March.

Data centre operators need abundant, highly reliable and clean power to operate 24/7, mission-critical digital services. Westinghouse says its AP300  technology meets this critical need by providing cost-effective, carbon-free baseload nuclear power in a safe, compact and flexible design based on the proven Westinghouse AP1000 pressurised water reactor.

The data centre industry is undergoing a profound transformation with the rise of artificial intelligence, Data4 CEO Olivier Micheli said. “In the past, data centres relied solely on traditional power utilities. Today, we are entering an era where the campuses of the future will be powered by multiple intelligent sources, seamlessly integrating on-site generation, traditional grid supply and energy storage,” he said.

“By integrating a solution such as the Westinghouse AP300 SMR, these campuses will gain greater energy autonomy, reducing their reliance on traditional grids and helping to alleviate pressure on public power networks. This marks a major step toward a more resilient, sustainable and self-sufficient data centre infrastructure.”

Westinghouse President and CEO Patrick Fragman said small modular reactors offer a promising solution for powering the next generation of energy-intensive computing. “Our AP300 modular reactor can provide data centres with a dedicated, on-site power source for reliable and carbon-free energy,” he added.

Westinghouse claims its 300 MWe reactor design is the most proven and readily deployable small modular reactor solution, without the first-of-a-kind risks associated with other designs that are under development, because it uses AP1000 engineering, licensing, components and supply chain. The company says it expects the AP300 to be in operation by the early 2030s.

Data4 finances, designs, builds and operates its own data centres. Its 35 European data centres in France, Italy, Spain, Poland, Germany and Greece are grouped together on campuses, a model the company says offers an efficient and scalable solution for its customers.

   

  • Related Posts

    First San’ao unit connected to the grid

    “At 17:28 on 12 March, the first Hualong One nuclear power unit in the Yangtze River Delta region – unit 1 of the CGN Zhejiang San’ao Nuclear Power Project –…

    Infrastructure work under way for Namaru uranium deposit

    JSC Khiagda, part of Rosatom’s mining division, is Russia’s leading uranium producer with operations at five deposits “in the challenging permafrost conditions of the Bauntovsky Evenki District”, in a region which…

    Have You Seen?

    IRAN’S “CROWN JEWEL” – US Attacks Iran’s Key Export Hub, Kharg Island, Trump Says

    • March 14, 2026
    IRAN’S “CROWN JEWEL” – US Attacks Iran’s Key Export Hub, Kharg Island, Trump Says

    Sabah Unveils New Renewable Energy Framework To Boost Clean Power Investment In Malaysia

    • March 14, 2026
    Sabah Unveils New Renewable Energy Framework To Boost Clean Power Investment In Malaysia

    Actis Sells Peru Power Generation Platform Orygen to Grupo Romero

    • March 14, 2026
    Actis Sells Peru Power Generation Platform Orygen to Grupo Romero

    GE Vernova And Hitachi Explore Small Modular Reactor Deployment Across Southeast Asia

    • March 14, 2026
    GE Vernova And Hitachi Explore Small Modular Reactor Deployment Across Southeast Asia

    South Africa Marks 300 Days Without Loadshedding As Eskom Stabilizes Power Supply

    • March 14, 2026
    South Africa Marks 300 Days Without Loadshedding As Eskom Stabilizes Power Supply

    Eskom And City Of Ekurhuleni Reach R3.4 Billion Debt Settlement To Secure Power Supply

    • March 14, 2026
    Eskom And City Of Ekurhuleni Reach R3.4 Billion Debt Settlement To Secure Power Supply

    Crude Futures Turn Positive on Continued Hormuz Closure

    • March 14, 2026
    Crude Futures Turn Positive on Continued Hormuz Closure

    Hormuz Crisis Forces Massive Saudi Oil Shut-In

    • March 14, 2026
    Hormuz Crisis Forces Massive Saudi Oil Shut-In

    California Hit By Much Higher Oil Prices as Iran War Stresses Refiners

    • March 13, 2026
    California Hit By Much Higher Oil Prices as Iran War Stresses Refiners

    CHARTED: The Energy Mix of the World’s 10 Largest Economies – Visual Capitalist

    • March 13, 2026
    CHARTED: The Energy Mix of the World’s 10 Largest Economies – Visual Capitalist