Deendayal Port Authority Floats ₹71.70 Crore Tender For Green Hydrogen Road Connectivity At Old Kandla

Representational image. Credit: Canva

The Deendayal Port Authority (DPA) has invited bids for a major infrastructure project aimed at supporting the development of green hydrogen facilities at Old Kandla under Phase I. Through Tender Notice Bid No. C-I: 05/2026, the authority plans to develop a common approach to road connectivity for the proposed green hydrogen plots, highlighting the growing focus on clean energy infrastructure in India.

According to the tender details, the project includes the construction of an approach road using quarry material to enable proper settlement of the road structure. The scope of work also involves the installation of RCC and pipe culverts to ensure the uninterrupted flow of seawater in the area. The infrastructure is expected to support future green hydrogen activities and improve accessibility to the proposed project sites at Old Kandla.

The estimated contract value of the project has been fixed at Rs. 71.70 crore, excluding GST. The selected contractor will be required to complete the work within a period of 12 months from the commencement date.

The tender documents became available for download from May 6, 2026, and interested bidders can submit their online bids until June 5, 2026, by 4:00 PM. The technical bids will be opened on the same day at 4:05 PM at the office of the Executive Engineer (C-I). In addition to online submission, bidders must also submit physical copies of important documents, including the Earnest Money Deposit (EMD), tender fee, and other mandatory papers, by June 12, 2026.

As part of the financial requirements, bidders are required to submit an EMD of Rs. 1.43 crore, which is equivalent to 2 percent of the estimated project cost. The EMD can be submitted through digital payment methods such as UPI, RTGS, and NEFT, or through an insurance surety bond or bank guarantee issued by a nationalized or scheduled bank located in Gandhidham.

The authority has also specified security deposit requirements for the selected contractor. A total security deposit of 10 percent of the contract value will be applicable. Out of this, 5 percent must be submitted as a Performance Bank Guarantee within 21 days of receiving the Letter of Acceptance. This can be provided in the form of an FDR, Insurance Surety Bond, or Bank Guarantee. The remaining 5 percent will be deducted from the monthly running bills as retention money.

To qualify for the project, bidders must meet defined technical and financial eligibility criteria. Companies are required to have an average annual turnover of at least Rs. 21.51 crore during the last three financial years ending March 31, 2025. They must also possess prior experience in similar infrastructure works, such as embankment, road, or runway construction completed within the past seven years. Micro and Small Enterprises may receive exemptions from tender fees and EMD submissions if they provide valid certificates for relevant activities.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    India Daily: Andaman & Nicobar Tenders 20 MWh BESS, NLC–OREDA Form Green JV, UPCL Tenders BESS, BERC Reviews 70 MW LTA, REC Transfers Luhri SPV, BERC Reviews OA Charges

    The Andaman and Nicobar administration has invited bids for a 20 MWh grid-connected Battery Energy Storage System (BESS) at Dollygunj, Port Blair. The project is aimed at strengthening grid stability…

    Yellow Door Energy, Nedbank CIB Reach Financial Close on 49 MWp Lion Thorn Solar Park in South Africa

    Yellow Door Energy and Nedbank Corporate and Investment Banking (Nedbank CIB) have achieved financial close for the 49 MWp Lion Thorn Solar Park in Leeudoringstad, North West, South Africa, paving…

    Have You Seen?

    AI Could Unlock $230B for Oil, Gas, OFSE Cos, McKinsey Says

    • September 2, 2026
    AI Could Unlock $230B for Oil, Gas, OFSE Cos, McKinsey Says

    Galactic Energy joins reusable rocket race

    • September 2, 2026
    Galactic Energy joins reusable rocket race

    Galactic Energy joins reusable rocket race

    • September 2, 2026
    Galactic Energy joins reusable rocket race

    Meritus enters Arizona market with Allied Gases and Welding Supplies acquisition

    • September 2, 2026
    Meritus enters Arizona market with Allied Gases and Welding Supplies acquisition

    US LNG exports up 23% in first half of 2026, reports EIA

    • September 2, 2026
    US LNG exports up 23% in first half of 2026, reports EIA

    Switzerland launches cross-border BECCS CO2 supply chain

    • September 2, 2026
    Switzerland launches cross-border BECCS CO2 supply chain

    Column: How energy-efficient motors can cut biogas plant costs

    • September 2, 2026
    Column: How energy-efficient motors can cut biogas plant costs

    Qatar and UAE LNG cargoes transferred ship-to-ship outside Hormuz

    • September 2, 2026
    Qatar and UAE LNG cargoes transferred ship-to-ship outside Hormuz

    India Daily: Andaman & Nicobar Tenders 20 MWh BESS, NLC–OREDA Form Green JV, UPCL Tenders BESS, BERC Reviews 70 MW LTA, REC Transfers Luhri SPV, BERC Reviews OA Charges

    • September 2, 2026
    India Daily: Andaman & Nicobar Tenders 20 MWh BESS, NLC–OREDA Form Green JV, UPCL Tenders BESS, BERC Reviews 70 MW LTA, REC Transfers Luhri SPV, BERC Reviews OA Charges

    Yellow Door Energy, Nedbank CIB Reach Financial Close on 49 MWp Lion Thorn Solar Park in South Africa

    • September 2, 2026
    Yellow Door Energy, Nedbank CIB Reach Financial Close on 49 MWp Lion Thorn Solar Park in South Africa