Final cycle of REMIX nuclear fuel trial under way

Tuesday, 3 December 2024

Final cycle of REMIX nuclear fuel trial under way
(Image: Rosatom)

Instead of standard enriched natural uranium, the REMIX fuel assemblies contain pellets of a mixture of enriched uranium with recycled uranium and plutonium obtained from used nuclear fuel at VVER reactors.

Six fuel assemblies of the TVS-2M design, equipped with the pilot fuel elements, were loaded into Balakavo 1 in 2021. They are undergoing a standard operating cycle for VVER-1000 reactor fuel, of three 18 month campaigns. Following the first two of those three operating cycles, specialists from TVEL, Rosatom’s fuel division, did video inspections of the fuel elements and structural elements of the TVS-2M with no obstacles identified to moving on to the final stage.

The third of the 18 month operating campaigns is now under way, with the REMIX (from Regenerated Mixture) fuel due to be unloaded in 2026 into the used fuel pool before being closely studied.

Alexander Ugryumov, Senior Vice President for Scientific and Technical Activities at TVEL, said: “After completing the pilot programme and post-reactor studies of REMIX fuel, Rosatom will have sufficient justification to offer the market a new product in the Balanced Fuel Cycle concept. At the next stage, we expect to move on to the phased introduction of such fuel at one of the high-capacity VVER power units.”

The REMIX fuel cycle would see used fuel assemblies reprocessed so that uranium and plutonium can be recycled as an unseparated mixture. They are topped up with some freshly enriched uranium and made into new fuel, which goes back to be used again. This cycle can be repeated as many as five times, with waste fission products removed each time and vitrified in glass ready for permanent geological disposal. In theory, with three fuel loads in circulation, a reactor could run for 60 years using the same fuel, with LEU recharge and waste removal on each cycle.

Compared with uranium-plutonium fuel for fast reactors – such as MOX fuel – REMIX has a lower plutonium content of up to 5% and the fuel performs within the same parameters as fuel made only from fresh low-enriched uranium. This means a reactor would not need any modification to start using REMIX.

Rosatom said: “In the future, the introduction of uranium-plutonium fuel will allow not only fast neutron reactors to be involved in the closed nuclear fuel cycle, but also classical light-water thermal reactors, which form the basis of modern nuclear energy. This will allow the raw material base of nuclear energy to be expanded many times over by closing the nuclear fuel cycle, as well as reusing irradiated fuel instead of storing it.”

   

  • Related Posts

    Viewpoint: Four million workers won’t be enough without the right leaders

    Somewhere in the nuclear industry today is the engineer who will bring a country’s first reactor online, the regulator who will license it, and the financier who will make it…

    FID sees Etango enter full-scale construction 

    The Etango project is in the Erongo Region of Namibia, 30 kilometres south-east of Swakopmund, with an estimated mineral resource base of 207 million pounds U3O8 (79,622 tU) at a…

    Have You Seen?

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    • October 24, 2026
    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    • October 24, 2026
    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    • October 24, 2026
    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    • October 24, 2026
    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    • October 24, 2026
    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    • October 24, 2026
    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    • October 24, 2026
    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    • October 24, 2026
    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    • October 24, 2026
    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)

    • October 24, 2026
    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)