GERC Hears NTPC REL’s 60 MW Review Petition Against GUVNL PPA Approval

Representational image. Credit: Canva

The Gujarat Electricity Regulatory Commission (GERC) heard a review petition filed by NTPC Renewable Energy Ltd. (NTPC REL) regarding a previous order dated May 13, 2021. The petition sought a review of the approval granted to Gujarat Urja Vikas Nigam Ltd. (GUVNL) for its power purchase agreement (PPA) with NTPC REL. The hearing was conducted in Gandhinagar on March 24, 2025.

NTPC REL argued that certain changes in domestic duties, levies, and taxes should qualify as a “Change in Law” event under Clause 6.2(4) of the National Tariff Policy, 2016. The company also pointed out that the Competitive Bidding Guidelines issued by the Ministry of Power on August 3, 2017, required any deviations in the PPA to be pre-approved by the Commission. However, NTPC REL claimed that GUVNL did not obtain such approval before issuing the bid documents. The petitioner further stated that when GUVNL filed for PPA approval in 2021, it did not disclose any deviations from these guidelines.

NTPC REL specifically highlighted that when the Request for Selection (RfS) was issued, prior approval for deviations was not sought. The company sought to amend certain articles of the PPA to include additional costs related to taxes, duties, and surcharges on imported solar equipment. The petitioner cited the Ministry of Finance’s notification from September 30, 2021, which increased the Goods and Services Tax (GST) rate on renewable energy devices from 5% to 12%. NTPC REL argued that these policy changes significantly increased project costs and should be considered a deviation requiring approval from the Commission.

On the other hand, GUVNL contended that NTPC REL had no standing to file the review petition at this stage. The company argued that NTPC REL had willingly participated in the bidding process and had agreed to the terms outlined in the PPA. GUVNL also pointed out that NTPC REL had acknowledged and accepted the bidding terms in writing. The respondent asserted that the Change in Law clause in the PPA was consistent with the Ministry of Power’s guidelines and did not require additional approvals. GUVNL also cited a Kerala High Court judgment from February 1, 2023, which ruled that bidders cannot challenge the terms of a tender after participating in the process.

During the hearing, NTPC REL informed the Commission that 60 MW of its project had already been commissioned. After hearing arguments from both parties, the Commission allowed them to submit written arguments within two weeks and reserved its final order on the matter.

 

  • Related Posts

    India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

    NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Green Energy Limited, has secured 500 MW under SECI’s FDRE-IX tender at a discovered tariff of ₹6/kWh. The…

    Cube Green Energy Appoints Dr Felix Grolman as Executive Chair to Drive European Renewable Energy Growth

    Cube Green Energy, an integrated renewable energy and battery storage platform, has appointed Dr Felix Grolman as Executive Chair, effective August 1, 2026, as the company advances the expansion of…

    Have You Seen?

    JPMorgan and Santander Lead $15 Billion Financing Push for Argentina LNG

    • August 25, 2026
    JPMorgan and Santander Lead $15 Billion Financing Push for Argentina LNG

    Japan Holds Off on New Oil Reserve Release Despite September Import Drop

    • August 25, 2026
    Japan Holds Off on New Oil Reserve Release Despite September Import Drop

    India’s Crude Import Bill Surges as Hormuz Shipping Rates Soar

    • August 25, 2026
    India’s Crude Import Bill Surges as Hormuz Shipping Rates Soar

    Malacca States Vow to Keep Asia’s Busiest Shipping Route Open

    • August 25, 2026
    Malacca States Vow to Keep Asia’s Busiest Shipping Route Open

    Equinor Eyes Major Oil Discovery Offshore Namibia

    • August 25, 2026
    Equinor Eyes Major Oil Discovery Offshore Namibia

    Japan’s Air Water buys 35% stake in Taiwan semiconductor gas supplier

    • August 25, 2026
    Japan’s Air Water buys 35% stake in Taiwan semiconductor gas supplier

    Japan’s Air Water takes 35% stake in Taiwan semiconductor gas supplier

    • August 25, 2026
    Japan’s Air Water takes 35% stake in Taiwan semiconductor gas supplier

    India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

    • August 25, 2026
    India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

    Equinor considers putting more wind into East Africa LNG sails

    • August 25, 2026
    Equinor considers putting more wind into East Africa LNG sails

    Cube Green Energy Appoints Dr Felix Grolman as Executive Chair to Drive European Renewable Energy Growth

    • August 25, 2026
    Cube Green Energy Appoints Dr Felix Grolman as Executive Chair to Drive European Renewable Energy Growth