Pipeline Upgrades Could Boost Trans Mountain’s Capacity by 300,000 Bpd

ByTsvetana Paraskova– Feb 07, 2025, 6:26 AM CST

Pipelineimage

Canada’s Trans Mountain pipeline could boost its capacity by up to 300,000 barrels per day (bpd) with upgrade projects, but it is not considering a third line, Trans Mountain Corporation’s Vice President Jason Balasch has said.

The Trans Mountain pipeline, which currently has a capacity to carry 890,000 bpd of crude and products from Alberta to the Pacific Coast, explores solutions to increase capacity and flows by potentially using drag-reducing agents to ease flows and add more pumps, Balasch told Reuters on the sidelines of an oil industry conference in Houston, Texas.

‘;
document.write(write_html);
}

Last year, the Trans Mountain pipeline finally completed its expansion – after years of delays – and tripled the capacity of the original pipeline to 890,000 bpd from 300,000 bpd to carry crude from Alberta’s oil sands to British Columbia.

The expanded pipeline provides increased transportation capacity for Canadian producers to get their oil out of Alberta and into the Pacific Coast and then to the U.S. West Coast or Asian markets.

Increased access for Canadian oil producers to markets other than the U.S. comes just in time as President Trump’s threat of U.S. tariffs on Canada, and a levy of 10% on its energy exports to the United States, is rattling the North American oil markets.

“I think there’s a lot of Asian markets that we could access,” Balasch, who is Vice President in charge of Business Development and Commercial Services at Trans Mountain Corporation, told Reuters.

“Our system isn’t full and we’re confident we can operate it to its maximum,” the executive added.

Since the threats of U.S. tariffs on Canada began, Trans Mountain Corporation has seen an increase in inquiries from new potential shippers, Balasch told Reuters.

Trans Mountain’s utilization rates were already rising before President Trump took office, said the executive.

Balasch also expects a further increase in pipeline utilization and more tankers to load from Canada to overseas markets when the Port of Vancouver introduces upgrades in its navigation systems to allow nighttime travel of unloaded tankers, expected in Q3.

By Tsvetana Paraskova for Oilprice.com

More Top Reads From Oilprice.com

Join the discussion | Back to homepage

 

  • Related Posts

    INEOS Opens EU’s First Full-Scale Carbon Storage Site in Denmark

    An INEOS-led carbon capture and storage project in Denmark was launched on Friday to become the first full-scale CO2 storage site in the European Union, UK-based chemicals and energy group…

    LNG Tankers Push Through Hormuz Again as Qatar, UAE Fight Supply Crunch

    At least two LNG carriers have transited the Strait of Hormuz so far this week, while two others were detected to have engaged in ship-to-ship transfers outside the Strait offshore…

    Have You Seen?

    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    • September 19, 2026
    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    Vedanta Aluminium Prepares for Rising Demand for Specialised Aluminium in India’s Power Grid Expansion

    • September 19, 2026
    Vedanta Aluminium Prepares for Rising Demand for Specialised Aluminium in India’s Power Grid Expansion

    GEON Commissions 10 MW/20 MWh BESS Project In Phalodi, Rajasthan

    • September 19, 2026
    GEON Commissions 10 MW/20 MWh BESS Project In Phalodi, Rajasthan

    Suzlon Energy Allots 6.4 Lakh Equity Shares Under ESOP 2022, Paid-Up Capital Rises to INR 2,749.26 Crore

    • September 19, 2026
    Suzlon Energy Allots 6.4 Lakh Equity Shares Under ESOP 2022, Paid-Up Capital Rises to INR 2,749.26 Crore

    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    • September 19, 2026
    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    INEOS Opens EU’s First Full-Scale Carbon Storage Site in Denmark

    • September 19, 2026
    INEOS Opens EU’s First Full-Scale Carbon Storage Site in Denmark

    LNG Tankers Push Through Hormuz Again as Qatar, UAE Fight Supply Crunch

    • September 18, 2026
    LNG Tankers Push Through Hormuz Again as Qatar, UAE Fight Supply Crunch

    Hormuz Tanker Traffic Slumps as Saudi Arabia Scrambles for New Oil Routes

    • September 18, 2026
    Hormuz Tanker Traffic Slumps as Saudi Arabia Scrambles for New Oil Routes

    India’s Clean Energy Boom Halts Coal Power Growth

    • September 18, 2026
    India’s Clean Energy Boom Halts Coal Power Growth

    Saudi Oil Exports Rebound at Hormuz While East-West Pipeline Remains Offline

    • September 18, 2026
    Saudi Oil Exports Rebound at Hormuz While East-West Pipeline Remains Offline