Trinidad and Tobago Seeks Extension for Venezuela Gas Project

Trinidad and Tobago Seeks Extension for Venezuela Gas Project | OilPrice.com

`;
document.write(write_html);
}

Breaking News:

ByTsvetana Paraskova– Feb 25, 2025, 8:30 AM CST
offshore

image

Trinidad and Tobago will request an extension to a U.S. license to continue developing a natural gas field offshore Venezuela in partnership with Shell, sources familiar with the plans have told Reuters.

The U.S. Treasury in early 2023 granted a license to Trinidad and Tobago, allowing the Caribbean nation to develop the Dragon gas field offshore Venezuela and do business related to the gas field with Venezuela’s state oil firm PDVSA.

‘;
document.write(write_html);
}

Even with U.S. sanctions on Venezuela and its state oil firm and central bank, the U.S. Administration has regularly granted licenses to foreign operators in Venezuela, including to Chevron.

Now Trinidad and Tobago, which develops the project via its National Gas Company (NGC), is seeking an extension to the 2023 license from the Trump Administration. The current license expires in October 2025, but the partners, Trinidad’s NGC and Shell, will need it extended before starting production from the Dragon project offshore Venezuela.

The final investment decision for the project is expected later this year, with first gas set for about 2027.

The Dragon project is planned to supply Trinidad and Tobago with natural gas.

The importance of energy security for Trinidad and Tobago was one of the reasons why the U.S. granted the initial license—to boost the energy security in the Caribbean basin.

At the end of last year, Trinidad and Tobago said that preliminary work for the first phase of the project got under way with a geophysical and geotechnical survey.

The subsea surveys will allow Shell to collect technical data to assess the status of existing infrastructure and technical data to support the design of new facilities to be installed, as well as the design and routing for the installation of a 22-km (14 miles) pipeline from the Dragon field to the Shell-operated Hibiscus platform, pending the final investment decision.

By Tsvetana Paraskova for Oilprice.com

More Top Reads From Oilprice.com

Join the discussion | Back to homepage

`;
document.write(write_html);
}



GOOGLE+
LINKEDIN
REDDIT
PRINT

`;
document.write(write_html);
}

EXXON Mobil
-0.35

Open57.81
Trading Vol.6.96M
Previous Vol.241.7B

BUY 57.15

Sell 57.00

 

  • Related Posts

    Europe Wary Of Too Much Dependence on U.S. LNG

    European buyers aren’t committing to long-term LNG supply agreements with U.S. exporters despite the ongoing EU phase-out of Russian gas imports and the supply crisis in the Middle East. U.S.…

    U.S., Iran strike deal to reopen Strait of Hormuz, sending oil lower

    (Bloomberg) – The U.S. and Iran say they have reached a deal to reopen the Strait of Hormuz, setting the stage for talks on Tehran’s nuclear program and potentially ending…

    Have You Seen?

    Europe Wary Of Too Much Dependence on U.S. LNG

    • June 15, 2026
    Europe Wary Of Too Much Dependence on U.S. LNG

    US and Iran Agree to Deal Halting War That Shook Middle East

    • June 15, 2026
    US and Iran Agree to Deal Halting War That Shook Middle East

    Oil Slips Over 4% After US, Iran Reach Peace Deal to Reopen Strait of Hormuz – Deal to be Signed Next Friday

    • June 15, 2026
    Oil Slips Over 4% After US, Iran Reach Peace Deal to Reopen Strait of Hormuz – Deal to be Signed Next Friday

    Iran Says Draft US Deal Includes Oil Sanctions Waiver, Nuclear Limits and Asset Release

    • June 14, 2026
    Iran Says Draft US Deal Includes Oil Sanctions Waiver, Nuclear Limits and Asset Release

    U.S., Iran strike deal to reopen Strait of Hormuz, sending oil lower

    • June 14, 2026
    U.S., Iran strike deal to reopen Strait of Hormuz, sending oil lower

    Nigeria’s Crude Oil Production Hits 15-Month High

    • June 13, 2026
    Nigeria’s Crude Oil Production Hits 15-Month High

    Oil Falls to Lowest Since March on Expected Peace Deal

    • June 13, 2026
    Oil Falls to Lowest Since March on Expected Peace Deal

    Just 6 Days to Go: Solar & Storage Expo Odisha 2026 Set to Accelerate the State’s Clean Energy Journey  

    • June 13, 2026
    Just 6 Days to Go: Solar & Storage Expo Odisha 2026 Set to Accelerate the State’s Clean Energy Journey  

    Ormat Technologies Launches Ormega100, A 100MW Surface Power Unit Designed For Enhanced Geothermal Systems

    • June 13, 2026
    Ormat Technologies Launches Ormega100, A 100MW Surface Power Unit Designed For Enhanced Geothermal Systems

    ACCIONA Energía Announces New 980MWh Battery Storage Project At El Romero Solar Plant In Chile

    • June 13, 2026
    ACCIONA Energía Announces New 980MWh Battery Storage Project At El Romero Solar Plant In Chile