Vikram Solar Commissions 5 GW Vallam Manufacturing Facility in Tamil Nadu, Expands Total Capacity to 9.5 GW

Representational image. Credit: Canva

Vikram Solar, a leading player in India’s solar PV sector, today announced the commissioning of its state-of-the-art Vallam manufacturing facility in Tamil Nadu, adding 5 GW of advanced module production capacity. With this expansion, the company’s total manufacturing capacity rises to 9.5 GW, reinforcing its position as a scale-driven leader in solar technology and strengthening its influence in India’s clean energy transition.

The Vallam facility, spanning 27,000 sq. m, is designed as a future-ready, large-scale manufacturing hub, incorporating advanced TOPCon technology and engineered for seamless upgrades to HJT modules. The plant supports multiple module formats, including M10, G12, and G12R, highlighting Vikram Solar’s commitment to technology leadership and adaptability.

The facility integrates intelligent robotics, advanced material-handling systems, built-in quality checks, and fully automated packaging, many of which are being deployed in India for the first time. This automation enhances manufacturing precision, accelerates throughput, strengthens process reliability, and sets new benchmarks for operational excellence.

For customers, Vallam translates into higher-quality modules with lower failure rates, improved performance, and reduced degradation, resulting in better long-term energy yields. Automated production ensures predictable deliveries, shorter lead times, and compliance with Tier-1 and international quality standards, providing confidence to utility-scale developers, C&I customers, and distributed generation projects.

The Vallam plant complements Vikram Solar’s existing Oragadam facility and follows the recent foundation ceremony for the upcoming Gangaikondan site, marking a strategic expansion of the company’s manufacturing footprint in Tamil Nadu. Together, these facilities reinforce the state’s position as a major hub for advanced solar manufacturing and green technology innovation.

Mr. Gyanesh Chaudhary, Chairman & Managing Director of Vikram Solar, said:
“Vallam is a defining milestone for Vikram Solar and for India’s solar manufacturing story. Commissioning this 5 GW facility within a year demonstrates our readiness for the scale, speed, and innovation the next decade demands. This facility strengthens India’s value chain and reinforces our confidence that Indian clean tech can lead globally.”

Vikram Solar also emphasized its commitment to inclusive growth, targeting 40–50% gender diversity in the Vallam workforce, reflecting its vision for a modern and equitable manufacturing environment.

The modules produced at Vallam will support utility-scale, commercial & industrial, and distributed generation projects across India, aiding the country in its ambitious renewable energy targets.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Weekly Tech Update: EMS Explained; Hoymiles 5000W; LONGi Solar+Storage; FOX ESS P100E; TSUNESS Microinverters; Sineng 510 kW; Growatt Rooftops; Battery RTE

    As utility-scale renewable projects become increasingly complex, Energy Management Systems (EMS) are emerging as the digital brain that coordinates solar generation, battery storage and grid interaction. Modern EMS platforms optimise…

    Cochin Shipyard Invites Bids For 1 MWp Rooftop Solar Power Project In Cochin

    Cochin Shipyard Limited (CSL), a Government of India public sector enterprise, has invited sealed two-bid tenders for the design, supply, installation, testing, and commissioning of a 1 MWp grid-connected rooftop…

    Have You Seen?

    ExxonMobil Says LNG Projects Diversify Portfolio, Won’t ‘Shy Away’ From Middle East

    • August 2, 2026
    ExxonMobil Says LNG Projects Diversify Portfolio, Won’t ‘Shy Away’ From Middle East

    Oil Prices Settle More Than 1% Higher, Log Strongest Month Since March

    • August 2, 2026
    Oil Prices Settle More Than 1% Higher, Log Strongest Month Since March

    US Energy Firms Add Rigs for Sixth Time in Seven Weeks, Says Baker Hughes

    • August 2, 2026
    US Energy Firms Add Rigs for Sixth Time in Seven Weeks, Says Baker Hughes

    Exxon, Chevron Warn of Continued High Fuel Prices From Iran War

    • August 2, 2026
    Exxon, Chevron Warn of Continued High Fuel Prices From Iran War

    H2 View – August 2026: Off-road transport

    • August 1, 2026
    H2 View – August 2026: Off-road transport

    Weekly Tech Update: EMS Explained; Hoymiles 5000W; LONGi Solar+Storage; FOX ESS P100E; TSUNESS Microinverters; Sineng 510 kW; Growatt Rooftops; Battery RTE

    • August 1, 2026
    Weekly Tech Update: EMS Explained; Hoymiles 5000W; LONGi Solar+Storage; FOX ESS P100E; TSUNESS Microinverters; Sineng 510 kW; Growatt Rooftops; Battery RTE

    ADNOC Unveils New Crude Pricing Mechanism

    • August 1, 2026
    ADNOC Unveils New Crude Pricing Mechanism

    Cochin Shipyard Invites Bids For 1 MWp Rooftop Solar Power Project In Cochin

    • August 1, 2026
    Cochin Shipyard Invites Bids For 1 MWp Rooftop Solar Power Project In Cochin

    CleanMax Reports Strong Q1 FY27 Results With Revenue Doubling And Renewable Energy Capacity Growth

    • August 1, 2026
    CleanMax Reports Strong Q1 FY27 Results With Revenue Doubling And Renewable Energy Capacity Growth

    Cabinet Approves INR 5,070 Crore PM Surya Sarovar Yojana For 5 GW Floating Solar With Energy Storage

    • August 1, 2026
    Cabinet Approves INR 5,070 Crore PM Surya Sarovar Yojana For 5 GW Floating Solar With Energy Storage