Iraqi Kurds Sign Billions in Energy Deals With U.S. Despite Baghdad Oil Dispute

The Kurdistan Regional Government (KRG) in northern Iraq has formalized two major energy agreements with U.S. firms HKN Energy and WesternZagros in Washington, D.C., Kurdish media reported on Monday, in deals valued at a combined $110 billion, despite a legal showdown with the federal government of Iraq over control of the country’s oil exports.  

The recent signing of these substantial energy agreements between the KRG and American companies raises questions about the legal and political implications, given the ongoing disputes between Baghdad and Erbil over oil control.

The deals were formalized during KRG Prime Minister Masrour Barzani’s official visit to the United States this week. While specific figures and timelines were not disclosed, both companies are expected to deepen their involvement in Kurdistan’s upstream oil sector.

The central government in Baghdad has previously deemed contracts signed by the KRG without federal approval as illegal. In 2022, Iraq’s Supreme Court ruled the Kurdish oil and gas law unconstitutional, asserting federal authority over oil exports.

Despite these tensions, Washington has been advocating for the resumption of Kurdish oil exports, which have been stalled since March 2023 due to legal disputes and pipeline shutdowns. Washington’s push aims to stabilize global oil markets and reduce Iran’s influence in the region.

The KRG’s move to sign new energy deals without Baghdad’s consent could further complicate negotiations, prompting analysts to speculate as to what the quid pro quo for Baghdad is going to be. 

Last week, the Association of the Petroleum Industry of Kurdistan (APIKUR) called for the urgent reopening of the Iraq-Turkey pipeline, which, prior to the dispute, pumped KRG oil to the Turkish port of Ceyhan, bypassing Baghdad and federal regulators. APIKUR spokesman Myles Caggins told Kurdistan24 late last week, “We are urging the Iraqi Minister of Oil to convene all parties immediately after the Arab Summit”. 

Three of APIKUR’s eight member companies are U.S.-based and actively engaging both sides in this dispute, attempting to get exports restarted and to address the estimated $1 billion in debt owed to the group’s members.

By Charles Kennedy for Oilprice.com

More Top Reads From Oilprice.com

 

  • Related Posts

    Japan Power Prices Surge to Highest Since 2023

    Japan’s nationwide day-ahead electricity price soared by 20% in one week to settle on Monday at the highest level since January 2023, as gas supply disruptions from the Middle East…

    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    Norway plans to continue exploring for oil and gas in its Arctic waters in the Barents Sea regardless of whether the European Union supports or lifts a moratorium on Arctic…

    Have You Seen?

    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    • August 24, 2026
    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    • August 24, 2026
    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    • August 24, 2026
    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    Japan Power Prices Surge to Highest Since 2023

    • August 24, 2026
    Japan Power Prices Surge to Highest Since 2023

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    • August 24, 2026
    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    • August 24, 2026
    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    • August 24, 2026
    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    • August 24, 2026
    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    • August 24, 2026
    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    Lithuania approves EIA programme for Klaipėda CO2 terminal

    • August 24, 2026
    Lithuania approves EIA programme for Klaipėda CO2 terminal