NAC system deployed in Canadian decommissioning milestone

Canadian Nuclear Laboratories (CNL) announced in June that the transfer of used fuel from the Gentilly-1 Waste Management Facility site in Québec to the Chalk River Laboratories site in Ontario had been completed ahead of schedule.

NAC announced on 5 August that its OPTIMUS-H transportation packaging system, certified for use in Canada in 2021, had been central to the operation to securely transport more than 3,000 used fuel bundles from Gentilly-1 over 500 kilometres to Chalk River. This was a pivotal step in the decommissioning of the 250 MWe steam-generating heavy water reactor, which operated intermittently from 1972 to 1978.

NAC’s OPTIMUS – for OPTImal Modular Universal Shipping – cask technology is described by the company as an adaptable Type B packaging that can be reconfigured to accommodate a variety of waste challenges. The OPTIMUS-H product line is designed for high-activity contents such as remote-handled transuranic waste and used fuel, while the OPTIMUS-L line is designed for low-activity contents.

NAC said the OPTIMUS-H system was selected for the job because of its robust safety certifications – it is licensed by the Canadian Nuclear Safety Commission and compliant with international standards for impact, fire, and immersion resistance – as well as its suitability for the CANDU fuel baskets used to store the used fuel, and its modular, scalable road transport design which enable efficient loading and unloading and reduces operational complexity and turnaround time.

“The successful execution of this project is a testament to the strength of our technology and the dedication of our team,” said NAC International President and CEO Kent Cole. “OPTIMUS-H is a versatile solution that is adaptable for spent fuel management missions like this – where safety, reliability, and regulatory compliance are non-negotiable.”

A decommissioning programme began in 1984 to bring Gentilly-1 to a safe shutdown state, and by 1986 the fuel had been transferred to an on-site dry storage facility. The fuel is now in interim storage at Chalk River, pending the development of a deep geological repository.

   

  • Related Posts

    Containment tests completed at Lufeng unit 5

    The two-part tests, which began on 29 August, confirm that the containment vessel meets design and construction quality requirements. The first part – the structural integrity test – involved the…

    Natural draft cooling tower is preferred JEK2 option

    The results of the feasibility study were released as part of the latest reports made public before the country prepares for a planned referendum on new nuclear. Bruno Glaser, Technical…

    Have You Seen?

    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    • September 19, 2026
    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    Vedanta Aluminium Prepares for Rising Demand for Specialised Aluminium in India’s Power Grid Expansion

    • September 19, 2026
    Vedanta Aluminium Prepares for Rising Demand for Specialised Aluminium in India’s Power Grid Expansion

    GEON Commissions 10 MW/20 MWh BESS Project In Phalodi, Rajasthan

    • September 19, 2026
    GEON Commissions 10 MW/20 MWh BESS Project In Phalodi, Rajasthan

    Suzlon Energy Allots 6.4 Lakh Equity Shares Under ESOP 2022, Paid-Up Capital Rises to INR 2,749.26 Crore

    • September 19, 2026
    Suzlon Energy Allots 6.4 Lakh Equity Shares Under ESOP 2022, Paid-Up Capital Rises to INR 2,749.26 Crore

    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    • September 19, 2026
    NTPC Green Energy Commissions 68.22 MW Solar Capacity At Dahod Project In Gujarat

    INEOS Opens EU’s First Full-Scale Carbon Storage Site in Denmark

    • September 19, 2026
    INEOS Opens EU’s First Full-Scale Carbon Storage Site in Denmark

    LNG Tankers Push Through Hormuz Again as Qatar, UAE Fight Supply Crunch

    • September 18, 2026
    LNG Tankers Push Through Hormuz Again as Qatar, UAE Fight Supply Crunch

    Hormuz Tanker Traffic Slumps as Saudi Arabia Scrambles for New Oil Routes

    • September 18, 2026
    Hormuz Tanker Traffic Slumps as Saudi Arabia Scrambles for New Oil Routes

    India’s Clean Energy Boom Halts Coal Power Growth

    • September 18, 2026
    India’s Clean Energy Boom Halts Coal Power Growth

    Saudi Oil Exports Rebound at Hormuz While East-West Pipeline Remains Offline

    • September 18, 2026
    Saudi Oil Exports Rebound at Hormuz While East-West Pipeline Remains Offline