Norway demo explores carbon capture in aluminium production

  • Gas
  • September 4, 2025

Norway’s GreenCap Solutions has launched a demonstration project to test its carbon capture technology in aluminium production, a sector that accounted for around 1.1bn tonnes of carbon dioxide equivalent in 2023.

The direct emissions of CO2 from the electrolysis process used to make primary aluminium – which is produced by extracting new aluminum from alumina, or refined bauxite ore – is significant at around 1.5kg of CO2 per kilo of liquid aluminium.

However, the project will particularly target the capture of CO2 from low-concentration point sources, such as flue gases, which only contain around 1% of CO2.

GreenCap aims to achieve this through a technology based on physical adsorption using a solid sorbent, without the use of chemicals. The project will run at an aluminium production plant owned and operated by Norwegian aluminium and renewable energy firm Hydro.

… to continue reading this article and more, please login, register for free, or consider subscribing to gasworld

You’ve reached your weekly limit to access free articles!

Want to keep reading?

Please register for free and create a profile to gain access to this full article and gasworld’s daily news.

For access to more content including our monthly digital magazines, subscriber-only features or columns and all our other gasworld archives, please consider subscribing.

Alternatively, you can continue reading more articles as a guest on Thursday, 11th September at 2:28PM

   

  • Related Posts

    • Gas
    • August 5, 2026
    Renergen targets September helium production in South Africa

    © Shutterstock You’ve read 1 of 1 of your free articles this month. By 59 min ago 2 min read South African helium producer Renergen, a subsidiary of Texas-based advanced…

    • Gas
    • August 5, 2026
    Convertus secures $135m for biomethane and food-grade CO2 facility in Canada

    By 40 min ago 3 min read Canada-based Convertus Group has secured CA$135m ($96.2m) in project financing for its flagship biofuel facility in York Region, Ontario, advancing a project that…

    Have You Seen?

    Renergen targets September helium production in South Africa

    • August 5, 2026
    Renergen targets September helium production in South Africa

    Convertus secures $135m for biomethane and food-grade CO2 facility in Canada

    • August 5, 2026
    Convertus secures $135m for biomethane and food-grade CO2 facility in Canada

    REALITY: Trump Says America Does Not Need Canadian Energy. The Facts, and His Own Policies, Say Otherwise

    • August 5, 2026
    REALITY: Trump Says America Does Not Need Canadian Energy. The Facts, and His Own Policies, Say Otherwise

    Oil Prices Rebound After Houthis Say They Attacked Saudi Tanker

    • August 5, 2026
    Oil Prices Rebound After Houthis Say They Attacked Saudi Tanker

    Trump Says US Held ‘All-Day Negotiation’ With Iran on Tuesday

    • August 5, 2026
    Trump Says US Held ‘All-Day Negotiation’ With Iran on Tuesday

    South East Asia Weekly: Sabah Launches RM4,000 Rebate; MPA Installs 1,092 Solar Panels; Aboitiz Starts 239 MWp Solar; SIM Signs 14-Year Solar PPA; Marina South Goes Solar and More…

    • August 5, 2026
    South East Asia Weekly: Sabah Launches RM4,000 Rebate; MPA Installs 1,092 Solar Panels; Aboitiz Starts 239 MWp Solar; SIM Signs 14-Year Solar PPA; Marina South Goes Solar and More…

    MIT-backed seawater technology locks away CO2 while producing hydrogen

    • August 5, 2026
    MIT-backed seawater technology locks away CO2 while producing hydrogen

    Oriana Power Invests INR 2.10 Crore In Wholly Owned Subsidiary For Solar Project Development

    • August 5, 2026
    Oriana Power Invests INR 2.10 Crore In Wholly Owned Subsidiary For Solar Project Development

    NTPC Green Energy Crosses 10 GW Renewable Capacity in FY26, Reports INR 521 Crore Consolidated PAT

    • August 5, 2026
    NTPC Green Energy Crosses 10 GW Renewable Capacity in FY26, Reports INR 521 Crore Consolidated PAT

    Coastal Bend LNG launches FERC pre-filing for Texas LNG terminal

    • August 5, 2026
    Coastal Bend LNG launches FERC pre-filing for Texas LNG terminal