APERC Issues Draft Rules For Timely Replacement Of Burnt Meters In Andhra Pradesh

Representational image. Credit: Canva

The Andhra Pradesh Electricity Regulatory Commission has issued a draft regulation on burnt meter replacement through its Sixth Amendment to the Licensees’ Standards of Performance Regulation, 2004. This new amendment was released from Vidyut Niyantrana Bhavan, Kurnool, and is set to be called the Sixth Amendment to APERC (Licensees’ Standards of Performance) Regulation, 2025. It will extend to the entire state of Andhra Pradesh and will come into effect from the date it is published in the official Gazette.

The Commission has pointed out that the original standards of performance regulation were first notified in June 2004, followed by multiple amendments in 2005, 2013, 2021, 2023, and 2024. After the bifurcation of Andhra Pradesh, the new APERC adopted these regulations in 2014. The latest amendment is being aligned with the Electricity (Rights of Consumers) Rules, 2020, which were issued by the Government of India on December 31, 2020. These rules required state commissions to set timelines for replacing defective, burnt, or stolen meters, and APERC has now acted in line with this guidance to improve consumer protection.

The draft regulation introduces specific timelines for replacing burnt meters depending on whether the fault lies with the licensee or the consumer. If the burning of the meter is due to reasons attributable to the licensee—such as high voltage, loose contacts, or ageing of the meter—the licensee will have to replace the burnt meter at its own cost. The replacement must be done within twenty-four hours in urban areas and seventy-two hours in rural areas from the time a complaint is received.

On the other hand, if the burning of the meter is caused by reasons attributable to the consumer—such as tampering, faults in the consumer’s installation, water damage, or unauthorized additional load—the consumer will have to bear the cost of the replacement. In such cases, too, the licensee must ensure the replacement is completed within twenty-four hours in urban areas and seventy-two hours in rural areas, but only after the consumer has made the required payment and corrective actions are taken to avoid repeat damage.

The regulation also provides for compensation in case of delay in service. If the meter is burnt due to reasons attributable to the licensee and the replacement is not carried out within the stipulated time, the licensee must pay Rs. 100 per day to the affected consumer for each day of default. This compensation applies only when a single consumer is affected. For cases where multiple consumers are impacted, no individual compensation has been provided under this draft.

The draft regulation is clearly aimed at aligning state standards with central rules while putting consumer interest at the forefront. It emphasizes timely replacement of burnt meters both in urban and rural areas, holding the licensee accountable where the fault lies on their side, and setting strict timelines even when consumers are responsible. The draft was issued on September 12, 2025, signed by the Commission Secretary in charge, P. Krishna, and is now open for consideration before being finalized in the official Gazette.

This step is expected to benefit consumers across Andhra Pradesh by ensuring the timely restoration of metering services, reducing inconvenience, and protecting them from potential financial losses caused by delays.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Hysata Begins Electrolyser Manufacturing Scale-Up in Australia With AI-Driven HysataFab Platform and 200 MW Annual Capacity

    Australian electrolyser manufacturer Hysata has launched HysataFab, an artificial intelligence (AI)-optimised manufacturing platform, and commissioned its first production line at the company’s 8,500-square-metre headquarters in Port Kembla, New South Wales.…

    Finnfund, Proparco Commit $33 Million to Colombia’s ERCO for Solar Expansion

    Finnfund, a Finnish impact investor, and Proparco, the French development finance institution, have committed a combined USD 33 million to Colombian integrated solar energy platform ERCO, with the investment supported…

    Have You Seen?

    Biomass-to-SAF pathway offers opportunity to meet Canadian aviation targets

    • September 28, 2026
    Biomass-to-SAF pathway offers opportunity to meet Canadian aviation targets

    Poland’s first agricultural biomethane plant injects into grid

    • September 28, 2026
    Poland’s first agricultural biomethane plant injects into grid

    EU Shrugs Off Gas Supply Fears Despite Low Storage Levels

    • September 28, 2026
    EU Shrugs Off Gas Supply Fears Despite Low Storage Levels

    BP Eyes Bigger U.S. Shale Footprint After Devon Deal Talks

    • September 28, 2026
    BP Eyes Bigger U.S. Shale Footprint After Devon Deal Talks

    Sponsored content: New Zealand’s Urbanaut brewery puts CO2 safety on tap

    • September 28, 2026
    Sponsored content: New Zealand’s Urbanaut brewery puts CO2 safety on tap

    Hysata Begins Electrolyser Manufacturing Scale-Up in Australia With AI-Driven HysataFab Platform and 200 MW Annual Capacity

    • September 26, 2026
    Hysata Begins Electrolyser Manufacturing Scale-Up in Australia With AI-Driven HysataFab Platform and 200 MW Annual Capacity

    Finnfund, Proparco Commit $33 Million to Colombia’s ERCO for Solar Expansion

    • September 26, 2026
    Finnfund, Proparco Commit $33 Million to Colombia’s ERCO for Solar Expansion

    B2U Begins Commercial Operation of 28 MWh Second-Life BESS Project in Texas

    • September 26, 2026
    B2U Begins Commercial Operation of 28 MWh Second-Life BESS Project in Texas

    GreenYellow Commissions 8 MWp of Rooftop Solar Across 18 Jerónimo Martins Sites in Portugal

    • September 26, 2026
    GreenYellow Commissions 8 MWp of Rooftop Solar Across 18 Jerónimo Martins Sites in Portugal

    Low Carbon Proposes 500 MW Solar and Battery Storage Project in West Oxfordshire

    • September 26, 2026
    Low Carbon Proposes 500 MW Solar and Battery Storage Project in West Oxfordshire