Twenty-year renewal sees Darlington become longest-licensed Canadian plant

The Canadian Nuclear Safety Commission (CNSC) said it made its decision to renew the licence for the four-unit Candu plant after considering submissions from Ontario Power Generation (OPG), CNSC staff and 79 intervenors during a two-part public hearing held earlier this year, saying it concluded that “OPG remains qualified to carry on the activities that the renewed licence will authorise”.

There are no changes to OPG’s licensed activities under the renewed licence, the CNSC said, although the decision includes a requirement for OPG to provide two comprehensive performance updates to the Commission on the conduct of its licensed activities, as well as a new licence condition that requires OPG to continue its engagement with Indigenous Nations and communities throughout the licence period.

Candu units are pressurised heavy water reactors designed to operate for 30 years before refurbishment. Refurbishment is a major undertaking: it includes the replacement of key reactor components such as steam generators, pressure tubes, calandria tubes and feeder tubes, and involves removing all the reactor’s fuel and heavy water and isolating it from the rest of the power station before it is dismantled. Thousands of components are inspected before the plant is rebuilt and is ready for another 30 years of operation.

Three of the four units at Darlington are currently in operation, having undergone refurbishment. The fourth unit is due to return to service in 2026, completing a 10-year execution phase which OPG says has exceeded all safety, quality, schedule, and financial forecasts.

“The longest-ever licence term for a Canadian nuclear station reflects the strong performance of the Darlington station, the proficiency of our highly skilled workers, and OPG’s continued commitment to safety and operational excellence,” OPG President and CEO Nicolle Butcher said. “Under this licence, Darlington will continue to safely and reliably produce electricity to help meet Ontario’s energy needs for decades to come.”

The plant’s current licence expires on 30 November.

   

  • Related Posts

    Construction of Chinese HTGR begins

    Xuwei Phase I was among 11 reactors approved by China’s State Council in August 2024. China National Nuclear Corporation (CNNC) plans to build two 1,208 MWe (net) Hualong One (HPR1000)…

    NAC to supply used fuel storage solution for Norway

    Norway holds about 16.5 tonnes of used fuel from six decades of operating nuclear research reactors. Much of it cannot be stored long term or disposed of in its current…

    Have You Seen?

    FGE NexantECA Sees Slim Chance of U.S.-Iran Deal

    • November 6, 2026
    FGE NexantECA Sees Slim Chance of U.S.-Iran Deal

    Europe’s Grid Spending Is Up 155% Since 2019

    • November 6, 2026
    Europe’s Grid Spending Is Up 155% Since 2019

    ADNOC Expands LNG Empire With Major New India Supply Deal

    • November 6, 2026
    ADNOC Expands LNG Empire With Major New India Supply Deal

    India’s HPCL Struggles to Secure Oil Tankers as Hormuz Risks Persist

    • November 6, 2026
    India’s HPCL Struggles to Secure Oil Tankers as Hormuz Risks Persist

    Asia’s Fuel Oil Market Signals Hopes of U.S.-Iran De-Escalation

    • November 6, 2026
    Asia’s Fuel Oil Market Signals Hopes of U.S.-Iran De-Escalation

    Viridi raises £2.2m to turn captured CO2 into chemicals

    • November 6, 2026
    Viridi raises £2.2m to turn captured CO2 into chemicals

    Colorado awards Vycarb $2.7m for carbon management tech

    • November 6, 2026
    Colorado awards Vycarb $2.7m for carbon management tech

    Colorado awards Vycarb $2.7m for carbon management tech

    • November 6, 2026
    Colorado awards Vycarb $2.7m for carbon management tech

    Oil Market Arrives at ‘Remarkable Destination’

    • November 6, 2026
    Oil Market Arrives at ‘Remarkable Destination’

    The Global Oil Glut Returns as High Prices Crush Demand

    • November 6, 2026
    The Global Oil Glut Returns as High Prices Crush Demand