PLN Backs Indonesia’s Push for 33 Waste-to-Energy Plants by 2029, Reinforcing the Country’s Renewable Energy Transition

Representational image. Credit: Canva

PT PLN (Persero) has reaffirmed its readiness to support Indonesia’s Waste-to-Energy (PLTSa) programme by serving as the official offtaker for power generated from upcoming government-initiated and developer-led projects. The commitment was outlined during the Bloomberg Technoz Ecoverse event held in Jakarta on Thursday, 20 November.

Coordinating Minister for Economic Affairs Airlangga Hartarto announced that construction of new waste-to-energy plants will begin next year as part of a national strategy to address waste challenges while expanding renewable energy capacity.

“Through Danantara, Indonesia has committed to building waste-to-energy plants, with seven projects planned for completion by 2026,” Airlangga said. He added that PLTSa facilities will play a key role in improving the tourism ecosystem by helping cities achieve cleaner, waste-free environments.

Airlangga further noted that the initiative aligns with President Prabowo Subianto’s directives. By 2029, the government aims to build 33 PLTSa plants across multiple provinces, particularly in regions facing significant waste management issues.

Stefanus Ade Hadiwidjaja, Managing Director of Investment at Danantara Indonesia, said waste-to-energy projects present a major opportunity to address environmental challenges while delivering sustainable power. He emphasized the need for multi-stakeholder cooperation — from the central government and regional administrations to businesses and local communities.

Stefanus also confirmed that PLN has been designated as the electricity offtaker, with Danantara coordinating overall project development. “Without systemic, collaborative, and measurable solutions, there will be no sustainability of economic life going forward,” he added.

PLN President Director Darmawan Prasodjo underscored the utility’s commitment to ensuring that PLTSa projects proceed smoothly and integrate seamlessly with the national grid.

“PLN fully supports the government’s policy to accelerate the development of waste-to-energy plants. Our responsibility is to ensure network readiness, provide offtake certainty, and create opportunities for collaboration with developers,” Darmawan said.

He added that PLN is strengthening transmission and distribution infrastructure in priority regions to ensure each new PLTSa plant can be quickly connected to the power system. “This integration is crucial for maintaining a stable electricity supply while ensuring optimal utilization of energy from waste,” he said.

During the panel session “From Waste to Watt: Bringing a Greener Indonesia,” Daniel KF Tampubolon, Executive Vice President of Aneka Energi Baru Reharukan PLN, reiterated that waste-to-energy development is now embedded within national energy planning.

“In the 2025–2034 RUPTL, launched with the government in May 2025, waste-to-energy is included as a key component of renewable energy expansion, particularly under the bioenergy category. This positions WTE fully in line with Indonesia’s energy transition roadmap,” Daniel said.

He noted that PLTSa projects require well-structured, low-risk investment models and highlighted challenges such as the need to strengthen the Reduce, Reuse, Recycle (3R) ecosystem to ensure optimal waste composition for energy production.

“Lessons from earlier projects show that gaps in 3R readiness increase risks. As an extension of the state, PLN plays a crucial role in supporting investment de-risking,” Daniel concluded.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Solar & Storage Leadership Forum 2026: Tanzania Set to Power the Country’s Next Phase of Clean Energy Growth

    Tanzania’s clean energy ambitions will take centre stage at the Solar & Storage Leadership Forum 2026: Tanzania, scheduled for 18 August 2026, from 08:30 EAT, in Dar es Salaam. Positioned…

    Waaree Renewable Technologies Secures 210 MWp EPC Contract from Solaris Horizon Energy

    Waaree Renewable Technologies Limited (WRTL), a subsidiary of Waaree Energies Limited, has secured a 210 MWp (150 MWac) Engineering, Procurement and Construction (EPC) contract from Solaris Horizon Energy Private Limited…

    Have You Seen?

    Analysis: Can UK biomethane seize its moment?

    • August 6, 2026
    Analysis: Can UK biomethane seize its moment?

    What Has Been the One Constant Through Hormuz Turmoil?

    • August 6, 2026
    What Has Been the One Constant Through Hormuz Turmoil?

    Solar & Storage Leadership Forum 2026: Tanzania Set to Power the Country’s Next Phase of Clean Energy Growth

    • August 6, 2026
    Solar & Storage Leadership Forum 2026: Tanzania Set to Power the Country’s Next Phase of Clean Energy Growth

    Kelington to expand India footprint with planned ASU

    • August 6, 2026
    Kelington to expand India footprint with planned ASU

    Waaree Renewable Technologies Secures 210 MWp EPC Contract from Solaris Horizon Energy

    • August 6, 2026
    Waaree Renewable Technologies Secures 210 MWp EPC Contract from Solaris Horizon Energy

    Indian Equity Markets End Higher As Green Energy Stocks Deliver Mixed Performance (06 August 2026)

    • August 6, 2026
    Indian Equity Markets End Higher As Green Energy Stocks Deliver Mixed Performance (06 August 2026)

    Biogas covers Denmark’s national gas use for the first time

    • August 6, 2026
    Biogas covers Denmark’s national gas use for the first time

    Biogas covers Denmark’s national gas use for the first time

    • August 6, 2026
    Biogas covers Denmark’s national gas use for the first time

    SJVN Files FY26 Annual Report, Highlights 4.2 GW Operational Portfolio and Expanding Renewable Energy Pipeline

    • August 6, 2026
    SJVN Files FY26 Annual Report, Highlights 4.2 GW Operational Portfolio and Expanding Renewable Energy Pipeline

    Hopes rise on Strait of Hormuz deal

    • August 6, 2026
    Hopes rise on Strait of Hormuz deal