Naturgy Enhances Renewable Energy Operations with State-of-the-Art Control Centre in Spain

Representational image. Credit: Canva

Naturgy has successfully integrated the management of all its solar and wind energy operations in Spain into a modernized facility designed to enhance the efficiency and environmental sustainability of its renewable energy assets. The newly established Renewable Control Centre (CCR), located in A Coruña, will also monitor the company’s renewable production in other countries where it operates, offering greater operational flexibility.

The CCR oversees 93 wind farms, 24 photovoltaic plants, and 5 cogeneration plants across Spain, alongside two wind farms in Mexico, totaling more than 3.48 GW of installed capacity. The center enables optimized operations by adjusting based on the availability of each facility. Equipped with cutting-edge information systems and cybersecurity features, it ensures the safe and efficient management of current and future renewable projects.

Meanwhile, the management of hydroelectric generation will continue at Naturgy’s Integrated Control Centre (ICC) in Ourense. This center, responsible for overseeing 47 power plants and 23 large dams across Spain, is equipped with advanced control systems and tools, providing 24/7 responses to electrical system demands while adhering to stringent safety protocols. Its inauguration in 2017 marked a significant leap in technology integration, consolidating R&D and operational oversight into one decision-making environment.

Naturgy’s investment in renewable energy technologies continues to grow, with a commitment to the energy transition. In the first half of 2024, the company invested €937 million in renewable developments and networks. This investment reflects Naturgy’s drive to shift to a more sustainable energy mix, aligning with its environmental, social, and governance (ESG) goals.

As of Q3 2024, Naturgy’s global generation capacity reached 6.9 GW, with 5.3 GW located in Spain. Wind energy now constitutes half of the company’s installed renewable capacity, with solar energy accounting for 1.3 GW across Brazil, Chile, the United States, and Spain. Additionally, hydroelectric energy represents 2.2 GW of installed capacity, with 2.1 GW in Spain and 0.1 GW in Costa Rica and Panama.

 

  • Related Posts

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Enviromena has started construction of the Longpasture Solar Farm in County Durham, UK, marking a major milestone for the company’s second-largest UK project to date. The company acquired the project…

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    Indian stock markets ended lower on August 24, 2026, as investors remained cautious amid selling pressure across benchmark indices. The S&P BSE SENSEX closed at 77,369.11, declining 0.22%, or around…

    Have You Seen?

    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    • August 24, 2026
    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    • August 24, 2026
    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    • August 24, 2026
    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    Japan Power Prices Surge to Highest Since 2023

    • August 24, 2026
    Japan Power Prices Surge to Highest Since 2023

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    • August 24, 2026
    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    • August 24, 2026
    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    • August 24, 2026
    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    • August 24, 2026
    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    • August 24, 2026
    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    Lithuania approves EIA programme for Klaipėda CO2 terminal

    • August 24, 2026
    Lithuania approves EIA programme for Klaipėda CO2 terminal