JinkoSolar Secures 53MW of Tiger Neo 3.0 Modules for a Ground Power Plant in Kazakhstan Powering Central Asia’s Green Energy Transition

JinkoSolar has recently signed a 53MW module supply agreement with customers in Kazakhstan, with all projects to be equipped with Tiger Neo 3.0 high-efficiency modules. This includes 23MW in the Shieli region and 30MW in the Zhanakorgan region. The partnership not only demonstrates the Kazakh market’s strong confidence in JinkoSolar’s technological capabilities but also further validates the global leadership of JinkoSolar’s N-type TOPCon technology in enhancing power plant returns.

Kazakhstan boasts abundant solar resources and vast land areas, making it highly suitable for large-scale ground power plant development. However, maximizing investment returns under real-world constraints—such as high summer temperatures, large temperature swings, high logistics costs, and capital pressure—is no easy task. For local customers, the ideal PV solution must meet three core requirements: low initial investment, high power output, and fast payback. The Tiger Neo 3.0 modules are designed precisely around these needs.

I. Less Land, Lower BOS Costs: Efficiency That Shrinks the Footprint

With a mass-production efficiency of up to 24.8% and power output of 670W, the Tiger Neo 3.0 modules help customers reduce land occupation and BOS costs (mounting structures, cabling, etc.) by approximately 8–10% for the same 53MW capacity. For the Shieli and Zhanakorgan projects, this means achieving the same installed capacity on a smaller land area—or installing more capacity on the same land—thereby improving capital efficiency from the very beginning.

II. High Heat, No Derating: Reliable Generation Even in Scorching Summers

The Shieli and Zhanakorgan regions are located in Kazakhstan’s interior, where summer temperatures often exceed 40°C. Thanks to an industry-leading temperature coefficient of just -0.26%/°C, the Tiger Neo 3.0 modules experience significantly lower power loss under high-temperature conditions compared to conventional products. Even during peak noon hours when sunlight is strongest and temperatures are highest, the modules maintain robust output—turning the region’s abundant solar resources into stable electricity revenue.

III. Power from Both Sides: Bifacial Gains Deliver Extra Yield

With a bifaciality factor of up to 90%, the Tiger Neo 3.0 modules can fully leverage the high-reflectance conditions typical of the Shieli and Zhanakorgan project sites—such as sandy soil and dry ground surfaces—to deliver an additional 5–10% power gain from the rear side. In addition, first-year degradation is below 1%, with annual linear degradation of only 0.35%, ensuring 30 years of stable operation under Kazakhstan’s continental climate. This combination of front-side efficiency and rear-side harvesting continuously amplifies the project’s life-cycle returns.

As a globally leading photovoltaic company, JinkoSolar understands that every order represents a customer’s long-term commitment to 30 years of power plant revenue. In the promising lands of Shieli and Zhanakorgan, the Tiger Neo 3.0 modules will leverage proven technology, reliable product quality, and field-verified performance to safeguard every kilowatt-hour and every unit of return. The signing of this 53MW order (23MW in Shieli + 30MW in Zhanakorgan) not only confirms the strong suitability of Tiger Neo 3.0 modules for Kazakhstan’s continental climate but also marks an accelerated phase in JinkoSolar’s ground power plant market expansion in Kazakhstan and the wider Central Asian region. Upon completion, both projects will be connected to the national grid, delivering clean, stable, and high-yield green electricity to local communities.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Indian Green Energy Stocks Show Mixed Performance As Sensex And Nifty End Higher On June 24

    Professionals analyze rising trends in Indian green energy stocks in a modern office. The Indian stock market ended on a positive note on June 24, 2026, with both benchmark indices…

    Week in South East Asia: Meralco-MGEN Eye 2.5 GW RE Project; Novva Buys 120 MWp Solar Asset; TotalEnergies ENEOS Expands Rooftop Solar and More…

    Representational image. Credit: Canva Meralco PowerGen Corporation (MGEN), Meralco, and Vietnam-based VinEnergo have signed an agreement to explore a 2.5 GW renewable energy project in the Philippines. The proposed development…

    Have You Seen?

    Rubio on Gulf Tour as Allies Sceptical About Iran Deal Seek Answers

    • June 24, 2026
    Rubio on Gulf Tour as Allies Sceptical About Iran Deal Seek Answers

    U.S. Crude Stocks at Cushing Hit Near 12-Year Low, Fuel Inventories Rise, EIA

    • June 24, 2026
    U.S. Crude Stocks at Cushing Hit Near 12-Year Low, Fuel Inventories Rise, EIA

    Iran, Oman to Coordinate Hormuz Transits

    • June 24, 2026
    Iran, Oman to Coordinate Hormuz Transits

    Adani Targets 10 GW Nuclear Power Capacity in India by 2035

    • June 24, 2026
    Adani Targets 10 GW Nuclear Power Capacity in India by 2035

    UK Climate Panel Urges Faster Electrification to Lower Energy Bills

    • June 24, 2026
    UK Climate Panel Urges Faster Electrification to Lower Energy Bills

    VLCC Earnings Near $470,000 a Day as Hormuz Hopes Drive Tanker Frenzy

    • June 24, 2026
    VLCC Earnings Near $470,000 a Day as Hormuz Hopes Drive Tanker Frenzy

    Oil Extends Losses on Expectations of Smoother Crude Flows via Hormuz

    • June 24, 2026
    Oil Extends Losses on Expectations of Smoother Crude Flows via Hormuz

    US CFOs in Survey Say Firms Mostly Absorbed Oil Price Shock

    • June 24, 2026
    US CFOs in Survey Say Firms Mostly Absorbed Oil Price Shock

    Global Physical Crude Markets Mired in Discounts as Middle East Ramps Up Supply

    • June 24, 2026
    Global Physical Crude Markets Mired in Discounts as Middle East Ramps Up Supply

    CarbonX CO2 electrolysis prize fund winner plots scale up timelines

    • June 24, 2026
    CarbonX CO2 electrolysis prize fund winner plots scale up timelines