Long-term fuel supply contract signed for OL3

In addition to ensuring long-term fuel supply, the agreement provides TVO with the option to transition to Framatome’s advanced GAIA fuel design, once the necessary licensing activities for reload quantities are completed. The GAIA design represents Framatome’s latest innovation in fuel technology, offering enhanced performance, flexibility, and operational efficiency.

As part of the agreement, Framatome will also supply engineering services related to reactor core design and fuel use optimisation to support the safe and economical operation of the Olkiluoto (OL3) plant unit.


The Olkiluoto EPR (Image: TVO)

“This new contract further strengthens a longstanding partnership between Framatome and TVO, built over more than 30 years of collaboration in nuclear fuel supply for Olkiluoto’s boiling water reactors and the EPR,” Framatome said.

Lionel Gaiffe, Senior Executive Vice President of Framatome’s Fuel Business Unit, said: “We are proud to continue supporting our long-term customer, TVO, by delivering reliable and safe fuel assemblies to Olkiluoto 3. This agreement reflects the trusted relationship we have built over many years, as well as our shared commitment to continuous improvement, innovation, and operational excellence in nuclear fuel supply.”

“This agreement with Framatome strengthens the long-term security of fuel supply for Olkiluoto 3 and supports our objective of ensuring safe and efficient electricity production,” said Marjo Mustonen, Senior Vice President for Electricity Production at TVO. “We value our strong partnership and look forward to continued collaboration in optimising plant performance.”

Tuomas Rantala, Head of TVO’s Fuel Uni, added: “This agreement for its part allows the adoption of longer operating cycles of up to two years at Olkiluoto 3. At the same time, the agreement strengthens over the long term the supply reliability based on TVO’s decentralised procurement approach.”

OL3 – a 1600 MWe pressurised water reactor – attained first criticality on 21 December 2021 and was connected to the grid on 12 March 2022 before entering commercial operation the following May.

Together with units 1 and 2 – both 890 MWe boiling water reactors – the Olkiluoto plant produces about 30% of Finland’s annual electricity consumption.

   

  • Related Posts

    Blue Ghost to carry nuclear power source to the Moon

    Zeno Power Systems’ Survive-the-Night Package, including a 5 watts (thermal) americium-241 radioisotope heater unit (RHU), will be on board a Firefly mission scheduled to launch no earlier than 2028. The…

    Russia plans to add 30 GW nuclear capacity, expand exports

    In the Kremlin’s official report on a virtual meeting held to discuss the development of nuclear energy, he said Russia was “probably the only country in the world that possesses…

    Have You Seen?

    India Boosts Battery Investment to Cut Solar Power Waste

    • August 24, 2026
    India Boosts Battery Investment to Cut Solar Power Waste

    Iranian Oil Supply to China Is Rapidly Drying Up

    • August 21, 2026
    Iranian Oil Supply to China Is Rapidly Drying Up

    Nigeria Eyes $50 Billion Offshore Oil and Gas Investment Boom

    • August 21, 2026
    Nigeria Eyes $50 Billion Offshore Oil and Gas Investment Boom

    East African Nations Offered 30% Share of Dangote’s Kenya Mega-Refinery

    • August 21, 2026
    East African Nations Offered 30% Share of Dangote’s Kenya Mega-Refinery

    Saudi Oil Exports from Mediterranean Soar with Shuttles North to Avoid Houthis

    • August 21, 2026
    Saudi Oil Exports from Mediterranean Soar with Shuttles North to Avoid Houthis

    Ukrainian Drone Attack Hits Lukoil Refinery Deep in Russia 

    • August 21, 2026
    Ukrainian Drone Attack Hits Lukoil Refinery Deep in Russia 

    China’s Teapots Look Beyond Iranian Oil amid U.S. Blockade

    • August 21, 2026
    China’s Teapots Look Beyond Iranian Oil amid U.S. Blockade

    Court Upholds Trump Admin Order to Restart SYU

    • August 21, 2026
    Court Upholds Trump Admin Order to Restart SYU

    Whisky waste-to-biomethane plant to meet 4% of Scotland’s gas demand

    • August 21, 2026
    Whisky waste-to-biomethane plant to meet 4% of Scotland’s gas demand

    CCS projects could put pressure on US Midwest CO2 supply

    • August 21, 2026
    CCS projects could put pressure on US Midwest CO2 supply