Homi Bhabha Cancer Hospital and Research Centre Invites Bids For 3 MW Captive Solar PV Plant In Visakhapatnam

The Homi Bhabha Cancer Hospital and Research Centre (HBCH&RC) in Visakhapatnam has invited bids for the development of a 3.0 MW captive solar photovoltaic (PV) plant as part of its efforts to increase the use of clean energy and reduce dependence on conventional power sources. The hospital has issued a Notice Inviting Tender (NIT) through a two-stage bidding process on behalf of its Director, with the Chief Engineer overseeing the tender.

The project covers the complete planning, design, engineering, supply, installation, testing, and commissioning of the captive solar power plant within the hospital premises. In addition to executing the project, the selected contractor will be responsible for maintaining the plant during a one-year Defect Liability Period (DLP). After this period, the contractor will continue to provide comprehensive operation and maintenance services for another ten years, ensuring the long-term performance and reliability of the solar installation.

The estimated cost of the project is Rs. 15.83 crore, inclusive of Goods and Services Tax (GST). Interested bidders must submit an Earnest Money Deposit (EMD) of Rs. 25.83 lakh. The EMD can be furnished in the form of a Demand Draft, Pay Order, Fixed Deposit Receipt, or Bank Guarantee issued by a scheduled bank in favour of Homi Bhabha Cancer Hospital & Research Centre, Visakhapatnam. The tender conditions specify that cheques will not be accepted.

The successful bidder will also be required to furnish a Performance Bank Guarantee equivalent to 5 percent of the contract value along with a Security Deposit of 2.5 percent of the tendered amount. The construction and commissioning of the solar PV plant must be completed within nine months from the date of commencement.

According to the tender schedule, the bid documents are available for download from July 9 to August 20, 2026, up to 5:30 PM through the Central Public Procurement Portal. Contractors may submit pre-bid queries and undertake site visits until July 27, 2026. A pre-bid meeting is scheduled for July 27 at 10:00 AM, while responses to the queries will be published on August 6.

Online bid submission will begin on August 7 and remain open until August 20, 2026. Original physical documents, including the EMD, must be submitted by August 27, 2026. The technical bids will be opened on August 28, 2026, while the date for opening the financial bids will be announced separately after the evaluation of technical proposals.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Ameren Energizes Knox County Connector Transmission Project, Upgrading 11 Miles of High-Voltage Lines in Illinois

    Ameren has placed the Knox County Connector transmission project into service in Illinois, strengthening grid reliability and improving the region’s ability to meet growing electricity demand. The completed project includes…

    EDF Power Solutions Signs 3 Landmark Agreements For 2,000 MW PHES, 500 MW Solar PV And 1,000 MW Digital Infrastructure In Oman

    EDF Power Solutions has strengthened its partnership with the Sultanate of Oman by signing three major agreements focused on renewable energy, energy storage, and sustainable digital infrastructure. The agreements were…

    Have You Seen?

    Ameren Energizes Knox County Connector Transmission Project, Upgrading 11 Miles of High-Voltage Lines in Illinois

    • July 10, 2026
    Ameren Energizes Knox County Connector Transmission Project, Upgrading 11 Miles of High-Voltage Lines in Illinois

    EDF Power Solutions Signs 3 Landmark Agreements For 2,000 MW PHES, 500 MW Solar PV And 1,000 MW Digital Infrastructure In Oman

    • July 10, 2026
    EDF Power Solutions Signs 3 Landmark Agreements For 2,000 MW PHES, 500 MW Solar PV And 1,000 MW Digital Infrastructure In Oman

    BayWa r.e. Sells 16.8 MWp Solar Project to Local Consortium in France

    • July 10, 2026
    BayWa r.e. Sells 16.8 MWp Solar Project to Local Consortium in France

    Havells Enters India’s Battery Energy Storage Market Through Strategic Collaboration with Pixii AS

    • July 10, 2026
    Havells Enters India’s Battery Energy Storage Market Through Strategic Collaboration with Pixii AS

    Southern Railway Invites INR 13.78 Crore Tender For Rooftop Solar PV Project At Madurai Station

    • July 10, 2026
    Southern Railway Invites INR 13.78 Crore Tender For Rooftop Solar PV Project At Madurai Station

    Homi Bhabha Cancer Hospital and Research Centre Invites Bids For 3 MW Captive Solar PV Plant In Visakhapatnam

    • July 10, 2026
    Homi Bhabha Cancer Hospital and Research Centre Invites Bids For 3 MW Captive Solar PV Plant In Visakhapatnam

    Leader Energy Breaks Ground on 99 MWac LSE III Solar Project in Malaysia

    • July 10, 2026
    Leader Energy Breaks Ground on 99 MWac LSE III Solar Project in Malaysia

    GAIL Invites Bids For PMC Of 600 MW Solar Project With 550 MWh BESS In Uttar Pradesh

    • July 10, 2026
    GAIL Invites Bids For PMC Of 600 MW Solar Project With 550 MWh BESS In Uttar Pradesh

    Vikram Solar Signs 130 MW Solar Cell Supply Deal to Boost India’s Module Manufacturing

    • July 10, 2026
    Vikram Solar Signs 130 MW Solar Cell Supply Deal to Boost India’s Module Manufacturing

    Vikram Solar To Invest INR15,037 Crore In New BESS Manufacturing Facility In Tamil Nadu

    • July 10, 2026
    Vikram Solar To Invest INR15,037 Crore In New BESS Manufacturing Facility In Tamil Nadu