Anaergia secures CAD $34m EPC contract for Hungarian biomethane plant

  • Gas
  • November 10, 2026

© Shutterstock

You’ve read 1 of 1 of your free articles this month.


Canadian anaerobic digestion firm Anaergia has secured a CAD $34m ($24m) engineering, procurement and construction (EPC) contract for a new biomethane facility in Hungary.

The company’s Italian subsidiary has already started engineering activities as it targets mid-2028 commissioning.

The facility is designed to process more than 140,000 tonnes of agricultural feedstock annually and produce more than 900Nm³ per hour of biogas for upgrading to pipeline-quality biomethane for injection into the national grid.

Anaergia has not disclosed the customer or location of the facility.

The facility will continue to expand Anaergia’s presence in the European biomethane market. The company recently secured its first major project in Hungary after more than a decade with poultry producer TisVet.

Under the agreement with TisVet, and subject to certain conditions, Anaergia will supply technology and engineering services for a new anaerobic digestion facility.

Assaf Onn, CEO of Anaergia, said, “Being selected for a second project this year in Hungary validates the strength of our proprietary technologies and our ability to offer complex RNG facilities at commercial scale in this growing market.”

In October, Hungary-based oil and gas firm MOL Group its first biomethane plant in Hungary, completing the upgrade of its Szarvas biogas facility to produce renewable gas for injection into the national grid.

Read more: 

Related topics:

   

  • Related Posts

    • Gas
    • November 10, 2026
    The reliability challenge in natural gas pretreatment

    The reliability challenge in natural gas pretreatment | Feature | gasworld © Sundyne By 17 min ago 1 min read Natural gas pretreatment often operates in demanding conditions, handling corrosive…

    • Gas
    • November 10, 2026
    LNG traffic through Hormuz reaches highest level since conflict began

    By 20 min ago 4 min read The number of liquefied natural gas (LNG) tankers exiting the Strait of Hormuz reached its highest monthly level since the US-Iran conflict began…

    Have You Seen?

    The reliability challenge in natural gas pretreatment

    • November 10, 2026
    The reliability challenge in natural gas pretreatment

    LNG traffic through Hormuz reaches highest level since conflict began

    • November 10, 2026
    LNG traffic through Hormuz reaches highest level since conflict began

    CPH2 targets overseas markets in revised recovery strategy

    • November 10, 2026
    CPH2 targets overseas markets in revised recovery strategy

    Anaergia secures CAD $34m EPC contract for Hungarian biomethane plant

    • November 10, 2026
    Anaergia secures CAD $34m EPC contract for Hungarian biomethane plant

    US Holds Off Strikes after Qatari Mediation

    • November 10, 2026
    US Holds Off Strikes after Qatari Mediation

    AGF Nitrogen plans ammonia upgrades amid European output cuts

    • November 10, 2026
    AGF Nitrogen plans ammonia upgrades amid European output cuts

    Video | Can new CO2 sources meet growing demand?

    • November 10, 2026
    Video | Can new CO2 sources meet growing demand?

    Brent Crashes 7% on Iran Peace Hopes Despite Fresh Saudi Pipeline Attack

    • November 10, 2026
    Brent Crashes 7% on Iran Peace Hopes Despite Fresh Saudi Pipeline Attack

    Oil Prices Plunge Below $92 as Trump Signals Restraint on Iran

    • November 10, 2026
    Oil Prices Plunge Below $92 as Trump Signals Restraint on Iran

    Circularity Fuels raises $7m for SAF demonstration plant

    • November 10, 2026
    Circularity Fuels raises $7m for SAF demonstration plant