Second part of Palisades loan guarantee released

Tuesday, 18 March 2025

Second part of Palisades loan guarantee released
Turbine inspections are part of the work being done as Palisades prepares to resume operations (Image: Holtec)

“Unleashing American energy dominance will require leveraging all energy sources that are affordable, reliable and secure – including nuclear energy,” Wright said. “Today’s action is yet another step toward advancing President Trump’s commitment to increase domestic energy production, bolster our security and lower costs for the American people.”

The 800 MWe single unit pressurised water reactor plant ceased operations in May 2022. Holtec International completed its acquisition of the plant from Entergy shortly afterwards: initially, the plan had been for Holtec to decommission it, but the company subsequently announced plans to apply for federal funding to support a restart of operations. It would be the first nuclear reactor in the USA to resume operations after having been retired.

The US Department of Energy Loan Programs Office issued the loan guarantee to Holtec Palisades in September 2024 to support the project, which is projected to support or retain up to 600 high-quality jobs in Michigan, plus some 1,000 jobs during regularly scheduled refuelling and maintenance outages every 18 months. Restarting the plant is anticipated to avoid the emission of 4.47 million tonnes of CO2 emissions per year for a total of 111 million tCO2 during the projected 25 years of operations.


Palisades (Image: US Department of Energy)

The restart of the reactor will be subject to approvals from the US Nuclear Regulatory Commission. In January, the regulator issued for public comment a draft environmental assessment and draft finding of no significant impact evaluating the environmental impacts from reauthorising power operations at the plant, as it considers Holtec’s requests for the licence exemptions and amendments it will need before the plant can restart.

Holtec has also said it intends to use the Palisades site as the location for its first two small modular reactor units. These will potentially add an additional 600 MW of generation capacity at the site and take advantage of existing infrastructure.

   

  • Related Posts

    Bruce Power to share nuclear knowledge with Energy Alberta

    The Bruce Power site in Ontario was home to Canada’s first commercial reactor, Douglas Point, which operated from 1967 to 1984, and its current fleet of eight Candu pressurised heavy…

    Kairos breaks ground for Hermes 2 reactor

    Hermes 2 is Kairos Power’s first deployment under its 2024 agreement with Google to develop an advanced reactor fleet. It will supply up to 50 MW of electricity to the…

    Have You Seen?

    US-JOINT launched Silicon Valley semiconductor R&D centre

    • April 21, 2026
    US-JOINT launched Silicon Valley semiconductor R&D centre

    GasEntec signs contracts for Dakar LNG terminal

    • April 21, 2026
    GasEntec signs contracts for Dakar LNG terminal

    UK government grants Riversimple £1.7m to deliver lightweight hydrogen car

    • April 21, 2026
    UK government grants Riversimple £1.7m to deliver lightweight hydrogen car

    Gas Prices Dip Below $4 Per Gallon While Oil Prices Reverse Downtrend

    • April 21, 2026
    Gas Prices Dip Below $4 Per Gallon While Oil Prices Reverse Downtrend

    Air Canada Scraps Key U.S. Routes Amid High Fuel Prices

    • April 21, 2026
    Air Canada Scraps Key U.S. Routes Amid High Fuel Prices

    UK to increase electricity levy and plans fixed price contracts for renewables

    • April 21, 2026
    UK to increase electricity levy and plans fixed price contracts for renewables

    UK to increase electricity levy and plans fixed price contracts for renewables

    • April 21, 2026
    UK to increase electricity levy and plans fixed price contracts for renewables

    UK hydrogen-based synthetic gas start-up raises £25m

    • April 21, 2026
    UK hydrogen-based synthetic gas start-up raises £25m

    Analysis: Why helium’s structural constraints are exposed by geopolitical shocks

    • April 21, 2026
    Analysis: Why helium’s structural constraints are exposed by geopolitical shocks

    Trump Signals No Ceasefire Extension

    • April 21, 2026
    Trump Signals No Ceasefire Extension