AC Couple Application Solis Hybrid Inverter

When upgrading an existing PV grid-tied system into a PV + Energy Storage system, you can add either a hybrid inverter or an AC-coupled inverter to the current setup. This forms an AC-coupled system. This guide explains the general application scenarios for AC coupling when using Solis products.

PV + Hybrid Scenario

  1. Requirements of the existing PV system
    • Can be a Solis PV inverter or any other brand of PV inverter.
    • The AC configuration must match the Solis hybrid inverter being added:
    Single-phase 230V L-N hybrid inverter works with single-phase 230V L-N PV inverter. Three-phase 400V L-L hybrid inverter works with three-phase 400V L-L PV inverter.
  2. Supported Solis hybrid inverter models
Solis Hybrid Product Series AC Configuration
S5-EH1P(3-6)K-L Single Phase L-N 230V
S6-EH1P(3-6)K-L-EU/AU Single Phase L-N 230V
S6-EH1P(3-8)K-L-PRO/PLUS Single Phase L-N 230V
S6-EH3P(3-10)K-H-EU/AU Three Phase L-L 400

The Solis hybrid inverter dynamically charges/discharges the battery based on overall measurement data from the smart meter. It follows self-use logic while considering the operating condition of both itself and the existing PV inverter.
Note: Generation data from the existing PV inverter will not appear in the Solis monitoring system.

In this setup, the Solis hybrid inverter charges/discharges the battery using measurement data from Smart Meter 1, while Smart Meter 2 collects generation data from the existing PV inverter and displays it on the Solis monitoring system.

Requirements:
• Only Eastron meters are supported.
• Smart Meter 1 must be set to slave address 01 (default), and Smart Meter 2 to slave address 02. Three-phase Eastron meters can be adjusted directly via the meter LCD. Single-phase Eastron meters may require special software and an RS485–USB adaptor to configure.
• On the Solis hybrid inverter, select “PV + Grid” in the meter installation settings.
• The Solis data logger must be updated to the latest firmware to support dual meter data.

  1. Export limitation considerations

System-level export limit control is not yet available in either the general or dual meter scenario.
• Zero export (0 W) is not feasible because there is no communication between the Solis hybrid inverter and the existing PV inverter. Once the battery is full, excess PV power cannot be absorbed.
• Partial export (xx W) is possible if the export limit (xx) is higher than the maximum output of the existing PV inverter. In this case, set the Solis hybrid inverter export power control to match. For example, if the PV inverter is at full generation, the Solis hybrid inverter can derate to 0 W to keep the total export within the set limit.

PV + AC Couple Scenario

  1. Requirements of the existing PV system
    • Can be a Solis PV inverter or any other brand of PV inverter.
    • The AC configuration must match the Solis AC-coupled inverter:
    Single-phase 230V L-N AC-coupled inverter works with single-phase 230V L-N PV inverter.
  2. Supported Solis AC Coupled inverter models
Solis Hybrid Product Series AC Configuration
RAI-3K-48ES-5G Single Phase L-N 230V
S5-EA1P3K-L Single Phase L-N 230V
S6-EA1P(3-6)K-L Single Phase L-N 230V

In this setup, the Solis AC-coupled inverter charges/discharges the battery based on smart meter data. A smart sensor also collects generation data from the existing PV inverter and displays it on the Solis monitoring system.

Like the PV + Hybrid scenario, system-level export limit control is not available. See Section 2.5 for details.

PV + Hybrid Scenario (Off-grid AC Couple via Frequency Control)

This scenario describes microgrid operation without any supplementary power from the public grid. Loads are supplied primarily by PV generation, and the total load capacity is determined by the backup port capacity of the hybrid inverter and PV inverter output.

When operating off-grid, the hybrid inverter establishes the reference AC voltage and frequency. If the PV inverter supports frequency-power (Freq-Watt) response, the hybrid inverter can adjust the reference frequency to control PV generation, effectively expanding off-grid PV capacity.

  1. Requirements of the PV inverter
    • Must support Freq-Watt response with configurable derating curve set points.
    • The PV inverter’s max output must be smaller than the backup rating of the Solis hybrid inverter.
    • AC configuration must match (single-phase 230V L-N with single-phase, or three-phase 400V L-L with three-phase).
  2. Supported Solis hybrid inverter models
Solis Hybrid Product Series AC Configuration
S6-EH1P(3-6)K-L-EU/AU Single Phase L-N 230V
S6-EH1P(3-8)K-L-PRO/PLUS Single Phase L-N 230V
S6-EH3P(3-10)K-H-EU/AU Three Phase L-L 400V

Most grid-tied PV inverters support Freq-Watt. For example, when AC frequency rises above 50.2 Hz, output power gradually reduces until it reaches 0%. When the frequency recovers, the inverter ramps back up.

Solis hybrid inverters use this by adjusting backup port frequency to control PV output. In Solis Cloud, under AC Coupling settings, configure:
• AC Coupling OFF-SOC
• AC Coupling Max Frequency

When battery SOC falls 10% below the OFF-SOC setting, the hybrid inverter ramps frequency upward. This prompts the PV inverter to derate output until SOC reaches the OFF-SOC point, at which the frequency is raised to the Max Frequency setting. This prevents excess PV generation from destabilizing the off-grid system.

PV Inverter Output Power Battery SOC
100% Pn ACCoupling OFF-SOC
AC Coupling OFF-SOC minus 10% 0% Pn

Note:

  1. This scenario applies to off-grid installations, where hybrid and PV inverters do not require grid code settings. In such cases, only the configurations in Section 2 need to be completed.
  2. Always confirm Freq-Watt response settings with the PV inverter manufacturer. Contact the Solis service team if you need help with Solis AC coupling setup. Solis is not responsible for damages caused by incorrect third-party PV inverter configuration.

Conclusion:
AC coupling is an important function of energy storage inverters. Solis hybrid inverters fully support this, making them a flexible option for household systems that want to expand into PV + storage applications.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    MnSEIA, SEIA, And CCSA Criticize Minnesota’s Approval Of Xcel’s 200 MW Battery Program, Warning Of Risks To Ratepayers

    Representational image. Credit: Canva The Minnesota Solar Energy Industries Association (MnSEIA), the Solar Energy Industries Association (SEIA), and the Coalition for Community Solar Access (CCSA) issued statements on Thursday criticizing…

    Victron Energy Demonstrates Integrated Energy Solutions at Solar & Storage Live Africa 2026 in Johannesburg

    Victron Energy concluded a focused and well-received exhibition at Solar & Storage Live Africa 2026, where the emphasis shifted from individual components to complete energy systems designed to perform in…

    Have You Seen?

    Trump Threatens to Hit Iran Infrastructure on Tuesday if Strait Remains Blocked

    • April 6, 2026
    Trump Threatens to Hit Iran Infrastructure on Tuesday if Strait Remains Blocked

    Vision 2030: Why system alignment is critical to 2030 targets

    • April 6, 2026
    Vision 2030: Why system alignment is critical to 2030 targets

    US Intelligence Warns Iran Unlikely to Ease Hormuz Strait Chokehold Soon

    • April 4, 2026
    US Intelligence Warns Iran Unlikely to Ease Hormuz Strait Chokehold Soon

    MnSEIA, SEIA, And CCSA Criticize Minnesota’s Approval Of Xcel’s 200 MW Battery Program, Warning Of Risks To Ratepayers

    • April 4, 2026
    MnSEIA, SEIA, And CCSA Criticize Minnesota’s Approval Of Xcel’s 200 MW Battery Program, Warning Of Risks To Ratepayers

    Victron Energy Demonstrates Integrated Energy Solutions at Solar & Storage Live Africa 2026 in Johannesburg

    • April 4, 2026
    Victron Energy Demonstrates Integrated Energy Solutions at Solar & Storage Live Africa 2026 in Johannesburg

    Brazil Advances Tangará Project: New Transformers And 500 kV Line Upgrade Boost Reliability In Maranhão And Pará

    • April 4, 2026
    Brazil Advances Tangará Project: New Transformers And 500 kV Line Upgrade Boost Reliability In Maranhão And Pará

    Smarter Power, Brighter Africa: Pylontech Deepens Presence in South Africa with All-Scenario Solutions and Local Service Center

    • April 4, 2026
    Smarter Power, Brighter Africa: Pylontech Deepens Presence in South Africa with All-Scenario Solutions and Local Service Center

    HD Hyundai Energy Solutions Secures $85 Million Module Supply Deal for U.S. Solar Project

    • April 4, 2026
    HD Hyundai Energy Solutions Secures $85 Million Module Supply Deal for U.S. Solar Project

    Trump Says US Can Take Strait of Hormuz With More Time, Take the Oil and Make a Fortune

    • April 3, 2026
    Trump Says US Can Take Strait of Hormuz With More Time, Take the Oil and Make a Fortune

    China Sets 2029 Deadline to Shut Down Outdated Petrochemical Plants

    • April 3, 2026
    China Sets 2029 Deadline to Shut Down Outdated Petrochemical Plants