BSPGCL Awards 125 MW/500 MWh Battery Storage Projects To Six Developers At Uniform Tariff In Bihar

Representational image. Credit: Canva

Bihar State Power Generation Company Limited (BSPGCL) has completed the auction for its standalone Battery Energy Storage System (BESS) project with a total capacity of 125 MW / 500 MWh. The auction was conducted under a Tariff-Based Competitive Bidding (TBCB) process to promote the development of energy storage infrastructure in the state. The was initially floated in March 2025 and invited bids for the development of a 500 MWh standalone BESS. A minimum project size of 20 MWh was required for participation.

A total of six companies emerged as winners in the auction. Barbrik Projects secured the largest share with 37.5 MW / 150 MWh. Prostarm Info Systems was awarded 30 MW / 120 MWh, while Hindustan Thermal Project (Hindustan Power) also secured the same capacity of 30 MW / 120 MWh. Suryam International and Kundan Green Energy each won a capacity of 10 MW / 40 MWh. Saatvik Green Energy was awarded 7.5 MW / 30 MWh. Altogether, these projects will contribute to the planned total capacity of 125 MW / 500 MWh.

The projects were awarded at a fixed tariff of ₹4.44 lakh per MW per month, applicable across all the winning developers. The uniform tariff indicates a competitive bidding outcome and reflects the growing interest and confidence in the BESS sector. The awarded companies are expected to set up their respective storage capacities as per the terms and conditions of the tender.

This BESS project marks a significant step towards strengthening the energy infrastructure in Bihar. By adding battery storage capacity, the state aims to improve grid stability, enhance power quality, and manage renewable energy integration more efficiently. The deployment of 500 MWh of energy storage will support better load management and reduce reliance on conventional energy sources during peak demand periods.

The completion of the auction is seen as a positive move for the region’s power sector and is expected to attract more investments in battery storage projects in the future. With increasing focus on renewable energy and energy storage, such initiatives are critical for ensuring energy reliability and sustainability. BSPGCL’s successful auction process also showcases the growing role of state utilities in driving the adoption of advanced energy technologies.

 

  • Related Posts

    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    Philippine National Bank (PNB) is supporting a 6.22 billion peso co-financing package for a major clean energy project in Barotac Viejo, Iloilo, Philippines. Developed by Singapore-based Levanta Renewables, the project…

    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    Chinese engineering company SEPCOIII has achieved full commercial operation of the Saudi Red Sea Utility Infrastructure Project, marking a major milestone in the development of renewable-powered tourism infrastructure. The project…

    Have You Seen?

    Asia Steps In to Fill Diesel Supply Gap in Africa as Middle East Exports Crash

    • August 31, 2026
    Asia Steps In to Fill Diesel Supply Gap in Africa as Middle East Exports Crash

    Iran Dismisses Trump Claim of Kharg Attack as Hostilities Return

    • August 31, 2026
    Iran Dismisses Trump Claim of Kharg Attack as Hostilities Return

    China Coking Coal Prices Set for Record 46% Monthly Surge

    • August 31, 2026
    China Coking Coal Prices Set for Record 46% Monthly Surge

    Europe Gas Prices Jump 5% to Highest Level Since 2023

    • August 31, 2026
    Europe Gas Prices Jump 5% to Highest Level Since 2023

    Trump Says Venezuelan Oil Will Refill U.S. Strategic Petroleum Reserve

    • August 31, 2026
    Trump Says Venezuelan Oil Will Refill U.S. Strategic Petroleum Reserve

    Goldman Sachs Sees Diesel Refining Margins Soaring to $63 a Barrel

    • August 31, 2026
    Goldman Sachs Sees Diesel Refining Margins Soaring to $63 a Barrel

    Asian Refiners Turn to Argentina as Iran War Disrupts Oil Supply

    • August 31, 2026
    Asian Refiners Turn to Argentina as Iran War Disrupts Oil Supply

    Lithium Miners Cash In as Battery Storage Demand Surges

    • August 31, 2026
    Lithium Miners Cash In as Battery Storage Demand Surges

    Iran Says Supertanker Hit by Mines in Strait of Hormuz

    • August 31, 2026
    Iran Says Supertanker Hit by Mines in Strait of Hormuz

    China’s LNG Imports Set to Drop 18% in August as Prices Soar

    • August 31, 2026
    China’s LNG Imports Set to Drop 18% in August as Prices Soar