CERC Approves ₹5,892 Million Tariff For Pune-III Transmission Project Under Khavda Renewable Energy Zone

Representational image. Credit: Canva

The Central Electricity Regulatory Commission (CERC) has issued its order on Petition No. 75/AT/2025 concerning the adoption of transmission charges for the Pune-III Transmission Limited project. The case revolves around the establishment of an inter-state transmission system for the evacuation of 7 GW of renewable power from the Khavda region in Gujarat under Phase IV, Part D, on a Build, Own, Operate, and Transfer (BOOT) basis. Pune-III Transmission Limited, which was incorporated by PFC Consulting Limited (PFCCL), was later acquired by the successful bidder through a tariff-based competitive bidding process.

The process began with the publication of the Request for Proposal (RfP) on October 19, 2023, and submission of bids on April 19, 2024. Technical bids were opened the same day, followed by the opening of financial bids on September 25, 2024. The e-reverse auction concluded on September 28, 2024, after 178 rounds, showing active participation from three bidders: Adani Energy Solutions Limited, Power Grid Corporation of India Limited, and Sterlite Grid 21 Limited. The final transmission charges discovered were ₹5,892.41 million per annum, with Adani Energy Solutions Limited emerging as the lowest bidder.

Originally, the Cost Committee had estimated the project cost at ₹3,381.28 crore, leading to a levelised tariff of ₹4,560.78 million per annum as per CERC norms. However, bidders had quoted higher charges due to revised Right of Way (RoW) guidelines issued by the Government of Gujarat and later by the Ministry of Power, which significantly increased compensation rates. Additionally, omissions in the initial cost estimation, changes in land value, and the application of a completion factor for cost escalation over the project timeline led to a reassessment. On June 5, 2025, the Cost Committee revised the estimated project cost to ₹4,021.28 crore, acknowledging corrections like loop-out line length, updated RoW costs, and escalation factors.

With these revisions, the updated computation showed that the discovered tariff was about 11.24% higher than CERC’s normative tariff. Despite this, the Bid Evaluation Committee (BEC) certified that the bidding process was transparent, competitive, and in compliance with the Ministry of Power’s guidelines. The Commission agreed, observing that the competitive environment and revised cost assumptions justified the outcome.

The Letter of Intent was issued to Adani Energy Solutions Limited on October 21, 2024. The company provided a performance guarantee of ₹70 crore and acquired Pune-III Transmission Limited on November 19, 2024. Subsequently, it filed the petition for adoption of the tariff, which has now been approved by the CERC. The Commission adopted the annual transmission charges of ₹5,892.41 million per annum, which will remain valid for the duration of the Transmission Service Agreement.

The order also directed PFCCL, as the Bid Process Coordinator, to ensure greater clarity and precision in drafting future committee minutes. Transmission charges will be shared by designated interstate transmission system customers as per the 2020 CERC regulations. With this, Petition No. 75/AT/2025 has been formally disposed of, paving the way for the execution of this major transmission project that will support renewable energy integration into the national grid.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Green Energy Stocks Trade Mixed As Market Volatility Weighs On Renewable Sector (13 August 2026)

    The Indian stock market showed a mixed trend on August 13, 2026, with benchmark indices witnessing mild movements during mid-afternoon trading. The S&P BSE Sensex gained 0.15% to reach 78,079.96,…

    United Solar Welcomes U.S. Section 232 Measures on Polysilicon

    United Solar welcomed the measures announced by the United States to strengthen its domestic polysilicon industry and to improve the resilience of its solar and semiconductor supply chains. The Proclamation,…

    Have You Seen?

    Decommissioning Spending in UK North Sea Hits Record High

    • August 13, 2026
    Decommissioning Spending in UK North Sea Hits Record High

    Romania Shuts Down Last Nuclear Reactor As Danube Hits 90-Year Low

    • August 13, 2026
    Romania Shuts Down Last Nuclear Reactor As Danube Hits 90-Year Low

    Ukraine Strikes Gazprom’s 200,000-Bpd Salavat Refinery in the Urals

    • August 13, 2026
    Ukraine Strikes Gazprom’s 200,000-Bpd Salavat Refinery in the Urals

    Global Refining System Has Little Spare Room Left

    • August 13, 2026
    Global Refining System Has Little Spare Room Left

    Chinese foundries record triple–digit quarterly growth

    • August 13, 2026
    Chinese foundries record triple–digit quarterly growth

    India Drives a Global Surge in New Coal Mine Plans

    • August 13, 2026
    India Drives a Global Surge in New Coal Mine Plans

    New Zealand Approves New Oil and Gas Production as Energy Security Concerns Grow

    • August 13, 2026
    New Zealand Approves New Oil and Gas Production as Energy Security Concerns Grow

    High Oil Prices Deliver a Windfall for China’s Coal-to-Chemicals Industry

    • August 13, 2026
    High Oil Prices Deliver a Windfall for China’s Coal-to-Chemicals Industry

    Alaska LNG Pipeline Bill Dies in Legislature, Governor Fires Back

    • August 13, 2026
    Alaska LNG Pipeline Bill Dies in Legislature, Governor Fires Back

    India Eyes Two New Sites to Expand Strategic Oil Reserves

    • August 13, 2026
    India Eyes Two New Sites to Expand Strategic Oil Reserves