China launches HTGR industrial alliance

The alliance was launched on 11 December in Beijing with the goal of “building a strategic community with shared goals, responsibilities, benefits, and values, marking a key milestone in the industrialisation and collaborative innovation of China’s fourth-generation nuclear energy technology”.

It is to focus on research and design, fuel manufacturing, equipment manufacturing, construction, installation and commissioning, operation and maintenance, and overseas markets.

According to China National Nuclear Corporation (CNNC): “By pooling industry strengths, the alliance aims to advance High-Temperature Gas-Cooled Reactor (HTGR) technology from single-purpose power generation toward diversified applications such as heating and hydrogen production. Priority will be given to breakthroughs in areas including petrochemical coupling and nuclear-based hydrogen production, accelerating the development of a ‘nuclear+’ zero-carbon integrated energy system. These efforts will provide HTGR-based solutions for China’s carbon peaking and carbon neutrality goals, supporting green energy transition and industrial upgrading.”

In September, a contract was awarded for the construction of the conventional islands of the three reactors – including a 660 MWe HTGR reactor – that will comprise the first phase of the Xuwei nuclear power project in China. The plant will supply both industrial heating and electricity by coupling a high-temperature gas-cooled reactor with two pressurised water reactors. In 2023 the High Temperature Gas-Cooled Reactor – Pebble-bed Module (HTR-PM) in Shidao Bay (also known as Shidaowan) in China entered commercial operation.

In its announcement about the alliance’s launch, CNNC said: “China has now fully mastered the complete HTGR technology chain – from design and manufacturing to construction, commissioning, operation, and fuel cycle – along with all core intellectual property rights, achieving a transition from a follower to a global leader in this sector”.

   

  • Related Posts

    Construction of Chinese HTGR begins

    Xuwei Phase I was among 11 reactors approved by China’s State Council in August 2024. China National Nuclear Corporation (CNNC) plans to build two 1,208 MWe (net) Hualong One (HPR1000)…

    NAC to supply used fuel storage solution for Norway

    Norway holds about 16.5 tonnes of used fuel from six decades of operating nuclear research reactors. Much of it cannot be stored long term or disposed of in its current…

    Have You Seen?

    Energy Aspects Slashes Forecast of China’s November Diesel Exports

    • November 6, 2026
    Energy Aspects Slashes Forecast of China’s November Diesel Exports

    FGE NexantECA Sees Slim Chance of U.S.-Iran Deal

    • November 6, 2026
    FGE NexantECA Sees Slim Chance of U.S.-Iran Deal

    Europe’s Grid Spending Is Up 155% Since 2019

    • November 6, 2026
    Europe’s Grid Spending Is Up 155% Since 2019

    ADNOC Expands LNG Empire With Major New India Supply Deal

    • November 6, 2026
    ADNOC Expands LNG Empire With Major New India Supply Deal

    India’s HPCL Struggles to Secure Oil Tankers as Hormuz Risks Persist

    • November 6, 2026
    India’s HPCL Struggles to Secure Oil Tankers as Hormuz Risks Persist

    Asia’s Fuel Oil Market Signals Hopes of U.S.-Iran De-Escalation

    • November 6, 2026
    Asia’s Fuel Oil Market Signals Hopes of U.S.-Iran De-Escalation

    Viridi raises £2.2m to turn captured CO2 into chemicals

    • November 6, 2026
    Viridi raises £2.2m to turn captured CO2 into chemicals

    Colorado awards Vycarb $2.7m for carbon management tech

    • November 6, 2026
    Colorado awards Vycarb $2.7m for carbon management tech

    Colorado awards Vycarb $2.7m for carbon management tech

    • November 6, 2026
    Colorado awards Vycarb $2.7m for carbon management tech

    Oil Market Arrives at ‘Remarkable Destination’

    • November 6, 2026
    Oil Market Arrives at ‘Remarkable Destination’