Energy Vault Begins Commercial Operation Of Cross Trails BESS, Its First Asset Under “Own & Operate” Growth Strategy

Energy Vault Holdings Inc., a company specializing in sustainable, grid-scale energy storage solutions, has successfully completed and brought online its 57 MW, two-hour Cross Trails Battery Energy Storage System (BESS) located in Scurry County, Texas. This marks the company’s first fully executed project under its “Own & Operate” strategy and was completed ahead of schedule. The system is now commercially operational and is supported by a 10-year offtake agreement with Gridmatic, an AI-driven power marketer.

The Cross Trails BESS is designed to supply energy and ancillary services to the Electric Reliability Council of Texas (ERCOT) grid. It will help stabilize the grid, support renewable energy integration, and enhance overall grid resilience. Energy Vault achieved mechanical completion of the project earlier than planned, meeting all construction milestones through effective coordination among its engineering, procurement, and construction teams. Commissioning began immediately after, and ERCOT’s Checklist Part 3, which includes all final testing and documentation, was also completed ahead of schedule. These achievements enabled the project to begin commercial operations sooner than expected.

This project features Energy Vault’s second-generation B-VAULT™ AC system, which is modular and pre-integrated, allowing for faster and more cost-effective installation. It also marks the first commercial deployment of this updated system. The BESS operates with Energy Vault’s proprietary VaultOS™ Energy Management System, which monitors, manages, and optimizes performance.

Marco Terruzzin, Chief Revenue Officer, Energy Vault, stated, “This milestone demonstrates the unique ability of the Energy Vault team to execute complex energy storage deployments with speed, quality, and attractive economics. Completing Cross Trails ahead of schedule and achieving ERCOT certification early is a testament to our team’s expertise and the commitment of the entire leadership team to delivering long-term, sustainable shareholder value under the ‘Own & Operate’ growth strategy announced in 2024.”

The offtake agreement with Gridmatic is the first of its kind in ERCOT to include a physically settled revenue floor for a BESS. It is backed by Gridmatic’s Energy Storage Fund and utilizes the company’s advanced AI-based forecasting tools, which have consistently led ERCOT’s Day Ahead energy trading performance. Gridmatic will also serve as the project’s Qualified Scheduling Entity (QSE), providing essential grid interface services. The successful launch of the Cross Trails BESS marks a key milestone in Energy Vault’s broader strategy to build and operate energy storage assets using an optimized capital and operational model. The project also highlights Energy Vault’s capacity to manage all phases from design and construction to financing and operations efficiently, while continuing to focus on revenue-generating structures that support long-term growth and reinvestment.

 

  • Related Posts

    Waaree Renewable Technologies Secures LOA for 291 MWp Solar PV and 280 MWh BESS Project

    Waaree Renewable Technologies Limited (WRTL), a subsidiary of Waaree Energies Limited, has received a Letter of Award (LOA) from one of India’s thermal power generating companies for the development of…

    Latin America’s Energy Storage Capacity Set to Reach 34 GW by 2035: Wood Mackenzie

    Latin America’s energy storage market is entering a period of rapid expansion, with cumulative energy storage capacity projected to increase from 2.5 GW in 2025 to 34 GW by 2035,…

    Have You Seen?

    India Surpasses 300 GW of Non-Fossil Power Capacity

    • August 28, 2026
    India Surpasses 300 GW of Non-Fossil Power Capacity

    Pakistan’s Five Refineries Set for $6 Billion Upgrade Push

    • August 28, 2026
    Pakistan’s Five Refineries Set for $6 Billion Upgrade Push

    Amazon Nears 1 GW of Wind Power in Sweden With Four New Deals

    • August 28, 2026
    Amazon Nears 1 GW of Wind Power in Sweden With Four New Deals

    Qatar Extends Force Majeure as Hormuz Crisis Still Blocks LNG Traffic

    • August 28, 2026
    Qatar Extends Force Majeure as Hormuz Crisis Still Blocks LNG Traffic

    India and Indonesia look to strengthen semiconductor ties

    • August 28, 2026
    India and Indonesia look to strengthen semiconductor ties

    Woodside receives final Pluto LNG train 1 module

    • August 28, 2026
    Woodside receives final Pluto LNG train 1 module

    Interlune recreates lunar helium in simulant for Earth-based extraction testing

    • August 28, 2026
    Interlune recreates lunar helium in simulant for Earth-based extraction testing

    Trump Sends Saudi Nuclear Deal to Congress as Riyadh Rejects Israel Condition

    • August 28, 2026
    Trump Sends Saudi Nuclear Deal to Congress as Riyadh Rejects Israel Condition

    U.S. In Talks To Take Direct Ownership Of Venezuelan Oil Fields

    • August 28, 2026
    U.S. In Talks To Take Direct Ownership Of Venezuelan Oil Fields

    Oil Prices Head for a Weekly Loss Despite Escalating Iran Tensions

    • August 28, 2026
    Oil Prices Head for a Weekly Loss Despite Escalating Iran Tensions