Fuel manufactured for Kudankulam 4’s initial loading

Under the contract agreed in 2024 with the Russian state nuclear corporation, TVEL will supply fuel for the lifetime of the VVER-1000 units, which comprise units 3 and 4 at the plant.

The Kudankulam site, near the southern tip of India, is already home to two Russian VVER-1000 pressurised water reactors – owned and operated by the Nuclear Power Corporation of India Ltd – which have been in commercial operation since 2014 (Kudankulam unit 1) and 2017 (unit 2). Four more are currently under construction in two phases: construction of units 3 and 4 began in 2017, with the work on units 5 and 6 beginning in 2021. Two further units – Kudankulam 7 and 8, larger AES-2006 units with VVER-1200 reactors – have been proposed as a fourth phase of the plant.

The first nuclear fuel was delivered for unit 3 in December. It was manufactured at Rosatom’s Novosibirsk Chemical Concentrates Plant.

Rosatom says that during operation of the first two units, its specialists, together with Indian specialists “have significantly improved their efficiency through the introduction of advanced nuclear fuel and extended fuel cycles. Since 2022, the Kudankulam NPP has been supplied with advanced TVS-2M nuclear fuel. It ensures more reliable and cost-effective operation of the power units due to its rigid structure, a next-generation anti-debris filter, and a higher uranium mass”.

It has also led to the time between refuelling shutdowns being extended from 12 months to 18 months. Units 3 and 4 will operate with 18-month fuel cycles from the start.

According to World Nuclear Association information, India currently has 24 operable nuclear reactors totalling 7,943 MW of capacity, with eight reactors – 4,768 MW – under construction. A further 10 units – some 7 GW of capacity – are in pre-project stages.

India has a target to expand its nuclear energy capacity to 100 GW by 2047. It plans to achieve this by a two-pronged approach, with the deployment of large-capacity reactors as well as small modular reactors (SMRs). In August last year Minister of State Jitendra Singh outlined to the country’s Parliament the three types of SMR that are being designed and developed by the Bhabha Atomic Research Centre for demonstration: the 200 MWe Bharat Small Modular Reactor (sometimes referred to as BSMR-200); a 55 MWe small modular reactor (SMR); and a 5 MWt high-temperature gas-cooled reactor for hydrogen production by coupling with suitable thermochemical process for hydrogen production.

   

  • Related Posts

    NPCIL signs MoU for Gujarat nuclear power projects

    In what it called “a significant step towards exploring new horizons for nuclear power development in Gujarat”, Nuclear Power Corporation of India Limited (NPCIL) said the MoU would “facilitate collaboration between…

    Hinkley Point B becomes second AGR plant transferred for decommissioning

    Hinkley Point B – comprising two Advanced Gas-cooled Reactors (AGRs) – was first synchronised to the electricity grid in February 1976. The plant generated more than 311 terawatt-hours of electricity…

    Have You Seen?

    Uniper eyes Türkiye biomethane production and exports

    • October 5, 2026
    Uniper eyes Türkiye biomethane production and exports

    Iran Oil Minister Quits as Exports Dry Up

    • October 5, 2026
    Iran Oil Minister Quits as Exports Dry Up

    U.S. Deploys Patriots to Shield Saudi Oil and Qatari Gas Facilities

    • October 5, 2026
    U.S. Deploys Patriots to Shield Saudi Oil and Qatari Gas Facilities

    G7 Moves to Release 100 Million Barrels to Counter Diesel Crisis

    • October 5, 2026
    G7 Moves to Release 100 Million Barrels to Counter Diesel Crisis

    Trump Says South Korea Deal Includes $8.4 Billion U.S. Oil Project

    • October 5, 2026
    Trump Says South Korea Deal Includes $8.4 Billion U.S. Oil Project

    Oil Prices Fall as Reports Say Hormuz Crude Flows Top Pre-War Levels

    • October 5, 2026
    Oil Prices Fall as Reports Say Hormuz Crude Flows Top Pre-War Levels

    Air Liquide targets €24bn investment and up to 600bps margin gains by 2030

    • October 5, 2026
    Air Liquide targets €24bn investment and up to 600bps margin gains by 2030

    OPEC+ holds November oil production targets steady as supply remains constrained

    • October 4, 2026
    OPEC+ holds November oil production targets steady as supply remains constrained

    Japan’s JERA Creates Oil Storage Firm to Manage National Reserve Sites

    • October 2, 2026
    Japan’s JERA Creates Oil Storage Firm to Manage National Reserve Sites

    Alaska LNG Hinges on How Much Asian Buyers Will Pay for Energy Security

    • October 2, 2026
    Alaska LNG Hinges on How Much Asian Buyers Will Pay for Energy Security