HERC Cancels Connectivity For 50 MW Solar Project Due To Captive Status Dispute

Representational image. Credit: Canva

AVAADA Green HN Project Pvt. Ltd. filed a petition with the Haryana Electricity Regulatory Commission (HERC) challenging the cancellation of in-principle feasibility and final connectivity approvals for its 50 MW solar power project at the 132/33 kV Adampur substation in Hisar, Haryana. The petitioner argued that the cancellation by Haryana Vidyut Prasaran Nigam Ltd. (HVPNL) and the insistence by Dakshin Haryana Bijli Vitran Nigam Ltd. (DHBVNL) on submitting captive status documents were arbitrary and contrary to the Electricity Act, 2003, and Electricity Rules, 2005.

The petitioner had applied in 2018 for connectivity under the captive model and submitted the necessary undertaking in 2019. In-principle feasibility was granted in May 2019, and final connectivity in September 2021. However, AVAADA later sought to sell power to Haryana Discoms at a cost-plus tariff. When this proposal was rejected in 2022, the petitioner reverted to the captive model and requested the continuation of connectivity accordingly.

HVPNL canceled final connectivity in March 2024, citing non-fulfillment of conditions tied to power sale agreements. It issued a final notice in November 2024 to submit documents proving captive status. Despite further communication from AVAADA in December 2024 requesting more time, HVPNL canceled the in-principle feasibility in March 2025, stating prolonged non-compliance.

The petitioner argued that the determination of captive status is only required after commissioning, as per the Electricity Rules, and not at the connectivity stage. It also claimed that it never applied under the Haryana Solar Policy and hence should not be bound by HAREDA guidelines. However, HVPNL produced documentation showing AVAADA’s application to HAREDA under the Solar Policy, thereby negating this claim.

The Commission examined whether the connectivity procedure and Solar Policy were applicable, and whether conditions for verifying captive status at the connectivity stage violated the Act and Rules. It upheld the mandatory nature of the Commission-approved connectivity procedure and held that the Solar Policy, along with HAREDA’s guidelines, applied to the project.

Ultimately, the Commission found that AVAADA was in breach of the terms and conditions linked to connectivity, including shareholding requirements and procedural compliance under the Solar Policy. It ruled that the cancellation of both final connectivity and in-principle feasibility by HVPNL was lawful and based on valid grounds. The petition was dismissed.

 

  • Related Posts

    Top Stories Of The Day: Cabinet Clears ₹2,584 Cr Small Hydro Scheme; STQC & NISE Partner to Boost Solar Testing and More…

    Cabinet Approves ₹2,584.6 Cr Small Hydro Scheme to Add 1,500 MW The Union Cabinet has approved a ₹2,584.6 crore small hydro power scheme aimed at adding 1,500 MW capacity across…

    ADNEC Partners With EWEC To Power Al Ain Venue With Clean Solar Energy

    Representational image. Credit: Canva The ADNEC Group has taken an important step toward sustainability by partnering with the Emirates Water and Electricity Company to power its Al Ain venue with…

    Have You Seen?

    DOE Has Issued More Than 40 Section 202(c) Emergency Orders Since May 2025. Here’s an Updated Log.

    • March 19, 2026
    DOE Has Issued More Than 40 Section 202(c) Emergency Orders Since May 2025. Here’s an Updated Log.

    RANKED: The Top Crude Oil Producers in 2025 – Visual Capitalist – See How Countries Rank

    • March 19, 2026
    RANKED: The Top Crude Oil Producers in 2025 – Visual Capitalist – See How Countries Rank

    Damage to Qatar LNG trains ‘will cut helium output by 14%’ for many years

    • March 19, 2026
    Damage to Qatar LNG trains ‘will cut helium output by 14%’ for many years

    Brent Jumps 7% to $114 as Spread With WTI Widens to 11-Year High

    • March 19, 2026
    Brent Jumps 7% to $114 as Spread With WTI Widens to 11-Year High

    Iranian Attack on Qatar LNG Hub Sends European Gas Soaring 35%

    • March 19, 2026
    Iranian Attack on Qatar LNG Hub Sends European Gas Soaring 35%

    South Korean Groups Backing New 1.25-GW Coal-Fired Power Plant in Alaska

    • March 19, 2026
    South Korean Groups Backing New 1.25-GW Coal-Fired Power Plant in Alaska

    Oil Prices Continue Ascent

    • March 19, 2026
    Oil Prices Continue Ascent

    Oil Jumps Above $119 a Barrel, Then Settles Back, on Middle East Energy Attacks

    • March 19, 2026
    Oil Jumps Above $119 a Barrel, Then Settles Back, on Middle East Energy Attacks

    US Oil Exports Seen Rising as WTI Discount to Brent Hits Widest in 11 Years

    • March 19, 2026
    US Oil Exports Seen Rising as WTI Discount to Brent Hits Widest in 11 Years

    Trump Promises Israel Won’t Repeat Strike on Key Iranian Gas Field

    • March 19, 2026
    Trump Promises Israel Won’t Repeat Strike on Key Iranian Gas Field