India and Russia discuss new nuclear power plant options

A joint statement issued by the Indian Prime Minister’s Office after talks between Indian Prime Minister Narendra Modi and Russian President Vladimir Putin said the two sides: “Confirmed their intention to broaden cooperation in nuclear energy, including fuel cycle, life cycle support for operating Kudankulam Nuclear Power Plant and non-power applications, as well as to elaborate a new agenda of interaction in the field of peaceful use of atomic energy and related high technologies.

“The sides noted the importance of further discussion on the second site in India for an NPP; the Indian Side will strive to finalise formal allotment of the second site in accordance with earlier signed agreements.

“The sides agreed to accelerate technical and commercial discussions on the VVER of the Russian design, research and joint development of NPPs, localisation and joint manufacturing of nuclear equipment and fuel assemblies for Russian-designed large capacity NPPs, subject to terms and conditions as mutually agreeable.”

In a joint press conference after the talks, Modi said that “enhancing connectivity between our two countries is a key priority for us” and said that they would move forward “with renewed energy” on transport links such as the Northern Sea Route, and the Chennai-Vladivostok route. The two sides also agreed on training Indian sailors on operating in Arctic waters.

Putin said that bilateral trade had reached about USD65 billion a year, and the aim was to increase that volume to USD100 billion. He also noted the progress on building the Kudankulam nuclear power plant and said that once it reaches full capacity “we believe that building small modular reactors and floating NPPs could also be relevant, just as using nuclear technology for non-energy purposes, including in healthcare, agriculture and other sectors”.

He also said that Russia and India were collaborating on a project to “to create the North-South corridor linking Russia and Belarus to the Indian Ocean. Infrastructure development along the Trans-Arctic Transport Corridor, including the Northern Sea Route as its main artery, offers ample opportunities for expanding bilateral trade”. The Northern Sea Route along Russia’s northern coast relies on nuclear-powered ice-breakers for year-round navigation.

Rosatom Director General Alexei Likhachev said, according to the official Russian Tass news agency, that Rosatom and India’s Ministry of Ports, Shipping and Waterways had established a working group to examine the potential for floating nuclear power plants in India. Russia has pioneered floating power units with the Akademik Lomonosov, whichhas been operating for more than five years. Russia’s designs use modified versions of the small reactors used for the nuclear-powered ice breakers.

Background

The Kudankulam site, about 100 kilometres from the port city of Tuticorin at the southern tip of India, is already home to two operating Russian VVER-1000 pressurised water reactors which have been in commercial operation since 2014 (Kudankulam unit 1) and 2017 (unit 2). Four more are currently under construction, in two phases: construction of units 3 and 4 began in 2017, with work on units 5 and 6 beginning in 2021. Two further units – Kudankulam 7 and 8, larger AES-2006 units with VVER-1200 reactors – have been proposed as a fourth phase of the plant.

Last week, the first delivery took place of nuclear fuel for the initial loading of Kudankulam unit 3.

According to World Nuclear Association information, India currently has 24 operable nuclear reactors totalling 7,943 MW of capacity, with six reactors – 4,768 MW – under construction. (The Indian government often classes two units at Gorakhpur where site works have begun as being under construction, although the first concrete for the reactor buildings has not yet been poured.) A further 10 units – some 7 GW of capacity – are in pre-project stages.

India has a target to expand its nuclear energy capacity to 100 GW by 2047. It plans to achieve this by a two-pronged approach, with the deployment of large-capacity reactors as well as small modular reactors (SMRs). In August Minister of State Jitendra Singh outlined to the country’s Parliament the three types of SMR that are being designed and developed by the Bhabha Atomic Research Centre for demonstration: the 200 MWe Bharat Small Modular Reactor (sometimes referred to as BSMR-200); a 55 MWe small modular reactor (SMR); and a 5 MWt high temperature gas cooled reactor for hydrogen production by coupling with suitable thermochemical process for hydrogen production.

   

  • Related Posts

    NPCIL signs MoU for Gujarat nuclear power projects

    In what it called “a significant step towards exploring new horizons for nuclear power development in Gujarat”, Nuclear Power Corporation of India Limited (NPCIL) said the MoU would “facilitate collaboration between…

    Hinkley Point B becomes second AGR plant transferred for decommissioning

    Hinkley Point B – comprising two Advanced Gas-cooled Reactors (AGRs) – was first synchronised to the electricity grid in February 1976. The plant generated more than 311 terawatt-hours of electricity…

    Have You Seen?

    Japan’s JERA Creates Oil Storage Firm to Manage National Reserve Sites

    • October 2, 2026
    Japan’s JERA Creates Oil Storage Firm to Manage National Reserve Sites

    Alaska LNG Hinges on How Much Asian Buyers Will Pay for Energy Security

    • October 2, 2026
    Alaska LNG Hinges on How Much Asian Buyers Will Pay for Energy Security

    WTI Sinks Nearly 4% as EU Weighs Emergency Stockpile Release

    • October 2, 2026
    WTI Sinks Nearly 4% as EU Weighs Emergency Stockpile Release

    Latest Dallas Fed Survey Reveals Theme Among Respondents

    • October 2, 2026
    Latest Dallas Fed Survey Reveals Theme Among Respondents

    What is the near-term feasibility of helium-3 fuel for fusion power?

    • October 2, 2026
    What is the near-term feasibility of helium-3 fuel  for fusion power?

    UN Says Global Fuel Subsidies Could Top $1 Trillion

    • October 2, 2026
    UN Says Global Fuel Subsidies Could Top $1 Trillion

    JERA CEO Warns LNG Prices Have Further to Climb

    • October 2, 2026
    JERA CEO Warns LNG Prices Have Further to Climb

    Scaling up: Blue Star’s next phase in Colorado

    • October 2, 2026
    Scaling up: Blue Star’s next phase in Colorado

    Shougang, Rio Tinto commission carbon capture trial facility at China steel plant

    • October 2, 2026
    Shougang, Rio Tinto commission carbon capture trial facility at China steel plant

    Oil Prices Come Under Pressure

    • October 2, 2026
    Oil Prices Come Under Pressure