LCOE analysis of Tiger Neo 3.0 and BC – Jinko Solar

The PV industry has never stopped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.

The PV industry has never stoped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.  Its latest Tiger Neo 3.0 claimed of 650-670Wp power output, 85+/- 5% Bifacility, -0.26% temp coefficient, -0.35% linear degradation, 96.77% low irradiance performance (200W/m²), etc., provides chance of lowering the levelised cost of energy (LCOE)than traditional TOPCon and N-type BC. 

This paper is purposed to compare the LCOE of Tiger Neo 3.0 and its N-type BC in different scenarios as follows, based in the supposition that the price of Tiger Neo 3.0 is same with N-BC module,module information is listed in table 1. We chose four project scenarios (two rooftop, two utility scale) and four locations with typical climate features, irradiance levels and balance of system (BOS) cost levels.  

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

Energy generation is simulated with the PVsyst software. The Tiger Neo 3.0 and N-type BC module PAN file is based on the actual performance provided by Jinkosolar while the PAN files of N-type BC are based on a general industry-wide performance level. 

We chose four typical locations, including Kagoshima (Japan), Berlin (Germany), Dubai (UAE), Qinghai (China). Their annual average irradiance and annual average temperature are listed in table 2.  

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

The calculation for LCOE is the net present value of total life cycle costs of the project, divided by the net present value of energy produced over the system’s lifetime. The total life cycle costs can be disaggregated as initial investment, annual cost, depreciation tax benefit and system residual value. The initial investment (US$/Wdc) is the sum of the BOS cost and the module price. Module prices and BOS cost of Tiger Neo 3.0 and N-type BC are assumed to be the same at each location. 

The AC capacity of the utility-scale plant is designed to be 100MW, 1500V system voltage, single axis tracker, albedo 30% in Dubai and 120MW, 1500V system voltage, fixed mounted, 20% albedo in Qinghai . The system lifetime is 30 years. 

Results 

The energy yield gain of Tiger Neo 3.0 over N-type BC at modeled Dubai and Qinghai utility project is 3.52% and 3.28% respectively, primarily attributed to Tiger Neo 3.0’s  higher bifacility and outstanding performance at high temperature. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 3.45% and 3.60% lower in Dubai and Qinghai. 

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

In contrast, the two rooftop projects of 500kW in Kagoshima,Japan and 1MW Berlin German features of low contribution of bifacility result in the less energy yield gain over BC of 0.54% and 0.77% respectively mainly due to better low light performance of Tiger Neo 3.0 as shown in table 3. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 1% and 1.11% lower in Kagoshima and Berlin. 

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

The two products of same power exhibit different performance in energy generation due to their differences in bifacial factors, performance in low irradiance, first-year degradation values which can be primarily attributed to light-induced degradation (LID).  

Conclusion  

It should be pointed out that the module prices of Tiger Neo 3.0 and N-type BC and BOS cost are assumed to be the same in LCOE analysis. In most cases, the LCOE of Tiger Neo 3.0 is lower  than N-type BC, and more competitive with fixed mounted or tracker system, high ground albedo, high temperature. In rooftop systems where bifacility advantage can not play to full, the better low irradiance performance of Tiger Neo 3.0 translates into longer working hour, which allows it to perform well throughout the year.  

Regarding energy generation, Tiger Neo 3.0 is higher than N-type BC, especially in hot and sunny regions with high albedo. This is due to their advantage of high bifaciality and low temperature coefficient. On the other hand, in rooftop installations, particularly in high latitude with low  irradiance or humid regions with more rainy and cloudy weather, the advantage of low light performance of Tiger Neo 3.0 prolongs the generation hour per day and per year. In LCOE analysis, Tiger Neo 3.0 has the high priorities in most scenarios and all climate and environment. 


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Green Energy Stocks Rise Up To 20% As NIFTY Gains 0.43% And SENSEX Advances 0.40% (23 September 2026)

    Indian green energy and power stocks witnessed mixed trading activity across the Bombay Stock Exchange (BSE) and the National Stock Exchange (NSE), while the broader equity market ended higher. The…

    B.Grimm Power And AMATA Advance 42.5 MWp Floating Solar Project In Thailand

    B.Grimm Power and AMATA Corporation are advancing a 42.5 MWp floating solar power project at Amata City Chonburi Industrial Estate in Thailand’s Eastern Economic Corridor (EEC). The project is being…

    Have You Seen?

    Brent Holds Above $102 as Iran Talks Stall Over Hormuz Conditions

    • September 24, 2026
    Brent Holds Above $102 as Iran Talks Stall Over Hormuz Conditions

    Southeast Asia Keeps Building Gas Plants Despite Hormuz LNG Shock

    • September 24, 2026
    Southeast Asia Keeps Building Gas Plants Despite Hormuz LNG Shock

    Indian Refiners Lift LPG Output Nearly 20% as Hormuz Blockage Chokes Imports

    • September 24, 2026
    Indian Refiners Lift LPG Output Nearly 20% as Hormuz Blockage Chokes Imports

    Analysts Say China 2026 Oil, Gas Demand Outlook Weakens

    • September 24, 2026
    Analysts Say China 2026 Oil, Gas Demand Outlook Weakens

    What if North America’s CO2 sourcing inertia persists?

    • September 24, 2026
    What if North America’s CO2 sourcing inertia persists?

    Trade, chips and energy challenges hang over US–China Summit

    • September 24, 2026
    Trade, chips and energy challenges hang over US–China Summit

    Trade, chips and energy challenges hang over US–China Summit

    • September 24, 2026
    Trade, chips and energy challenges hang over US–China Summit

    Glencore Joins Project Vault With $500 Million Cobalt Commitment

    • September 24, 2026
    Glencore Joins Project Vault With $500 Million Cobalt Commitment

    Dangote’s Kenya Refinery Project Launches This Week at Up to $20B

    • September 24, 2026
    Dangote’s Kenya Refinery Project Launches This Week at Up to $20B

    Imperial Oil Becomes First Major Alberta Energy Company to Oppose Separatism

    • September 24, 2026
    Imperial Oil Becomes First Major Alberta Energy Company to Oppose Separatism