LCOE analysis of Tiger Neo 3.0 and BC – Jinko Solar

The PV industry has never stopped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.

The PV industry has never stoped its pursuit of higher energy efficiency, as TOPCon becoming dominant technology, Jinkosolar continues to push the bleeding edge to raise the bar of cell efficiency over 27%.  Its latest Tiger Neo 3.0 claimed of 650-670Wp power output, 85+/- 5% Bifacility, -0.26% temp coefficient, -0.35% linear degradation, 96.77% low irradiance performance (200W/m²), etc., provides chance of lowering the levelised cost of energy (LCOE)than traditional TOPCon and N-type BC. 

This paper is purposed to compare the LCOE of Tiger Neo 3.0 and its N-type BC in different scenarios as follows, based in the supposition that the price of Tiger Neo 3.0 is same with N-BC module,module information is listed in table 1. We chose four project scenarios (two rooftop, two utility scale) and four locations with typical climate features, irradiance levels and balance of system (BOS) cost levels.  

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

Energy generation is simulated with the PVsyst software. The Tiger Neo 3.0 and N-type BC module PAN file is based on the actual performance provided by Jinkosolar while the PAN files of N-type BC are based on a general industry-wide performance level. 

We chose four typical locations, including Kagoshima (Japan), Berlin (Germany), Dubai (UAE), Qinghai (China). Their annual average irradiance and annual average temperature are listed in table 2.  

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

The calculation for LCOE is the net present value of total life cycle costs of the project, divided by the net present value of energy produced over the system’s lifetime. The total life cycle costs can be disaggregated as initial investment, annual cost, depreciation tax benefit and system residual value. The initial investment (US$/Wdc) is the sum of the BOS cost and the module price. Module prices and BOS cost of Tiger Neo 3.0 and N-type BC are assumed to be the same at each location. 

The AC capacity of the utility-scale plant is designed to be 100MW, 1500V system voltage, single axis tracker, albedo 30% in Dubai and 120MW, 1500V system voltage, fixed mounted, 20% albedo in Qinghai . The system lifetime is 30 years. 

Results 

The energy yield gain of Tiger Neo 3.0 over N-type BC at modeled Dubai and Qinghai utility project is 3.52% and 3.28% respectively, primarily attributed to Tiger Neo 3.0’s  higher bifacility and outstanding performance at high temperature. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 3.45% and 3.60% lower in Dubai and Qinghai. 

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

In contrast, the two rooftop projects of 500kW in Kagoshima,Japan and 1MW Berlin German features of low contribution of bifacility result in the less energy yield gain over BC of 0.54% and 0.77% respectively mainly due to better low light performance of Tiger Neo 3.0 as shown in table 3. Set LCOE of BC as baseline, the LCOE of Tiger Neo 3.0 is 1% and 1.11% lower in Kagoshima and Berlin. 

LCOE analysis of Tiger Neo 3.0 and BC Jinkosolar

The two products of same power exhibit different performance in energy generation due to their differences in bifacial factors, performance in low irradiance, first-year degradation values which can be primarily attributed to light-induced degradation (LID).  

Conclusion  

It should be pointed out that the module prices of Tiger Neo 3.0 and N-type BC and BOS cost are assumed to be the same in LCOE analysis. In most cases, the LCOE of Tiger Neo 3.0 is lower  than N-type BC, and more competitive with fixed mounted or tracker system, high ground albedo, high temperature. In rooftop systems where bifacility advantage can not play to full, the better low irradiance performance of Tiger Neo 3.0 translates into longer working hour, which allows it to perform well throughout the year.  

Regarding energy generation, Tiger Neo 3.0 is higher than N-type BC, especially in hot and sunny regions with high albedo. This is due to their advantage of high bifaciality and low temperature coefficient. On the other hand, in rooftop installations, particularly in high latitude with low  irradiance or humid regions with more rainy and cloudy weather, the advantage of low light performance of Tiger Neo 3.0 prolongs the generation hour per day and per year. In LCOE analysis, Tiger Neo 3.0 has the high priorities in most scenarios and all climate and environment. 


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Green Energy Sector Sees Mixed Trading As Clean Power Stocks Gain Momentum Amid Market Volatility (27 May 2026)

    The Green Energy Index shows steady growth over the past year, reaching 1,540.25 USD in August 2024. The Indian green energy sector witnessed a mixed trading session as stock movements…

    Kyivstar Acquires 105 MW Solar Portfolio in Ukraine’s Lviv Region to Expand Renewable Energy Capacity to 118 MW

    Representational image. Credit: Canva Kyivstar, a subsidiary of Kyivstar Group Ltd, has announced the acquisition of six solar power plants in the Lviv region of Ukraine as part of its…

    Have You Seen?

    Ohmium and InSolare team up on 4MW Indian green hydrogen project

    • May 28, 2026
    Ohmium and InSolare team up on 4MW Indian green hydrogen project

    In memoriam: His Excellency Abdullah Bin Hamad Al-Attiyah

    • May 28, 2026
    In memoriam: His Excellency Abdullah Bin Hamad Al-Attiyah

    New CO2-to-chemical tech could reduce imports for Australia

    • May 28, 2026
    New CO2-to-chemical tech could reduce imports for Australia

    US Crude, Gasoline Inventories Continue to Sink

    • May 28, 2026
    US Crude, Gasoline Inventories Continue to Sink

    Oil Prices Jump After Fresh U.S. Strikes on Iran

    • May 28, 2026
    Oil Prices Jump After Fresh U.S. Strikes on Iran

    IEA Forecasts a $3.4 Trillion Energy Investment Boom

    • May 28, 2026
    IEA Forecasts a $3.4 Trillion Energy Investment Boom

    Red Ball Oxygen starts EPA protocol gas production in Houston

    • May 28, 2026
    Red Ball Oxygen starts EPA protocol gas production in Houston

    New Minnesota law clears path for helium projects

    • May 28, 2026
    New Minnesota law clears path for helium projects

    Johnson Matthey buys US catalyst and carbon capture firm after recording £91m profit

    • May 28, 2026
    Johnson Matthey buys US catalyst and carbon capture firm after recording £91m profit

    Lhyfe teams up with construction firm for German green hydrogen build out

    • May 28, 2026
    Lhyfe teams up with construction firm for German green hydrogen build out