Uttarakhand Regulator Denies Request To Exceed 1 MW Rooftop Solar Net Metering Limit

Representational image. Credit: Canva

The Uttarakhand Electricity Regulatory Commission (UERC) has dismissed a petition filed by Opto Electronics Factory, Dehradun, seeking approval to install an additional 600 kW rooftop solar photovoltaic (GRPV) plant over the 1 MW ceiling limit set under the UERC RE Regulations, 2023. The petitioner had requested permission to expand its total installed rooftop solar capacity to 1.6 MW under the net metering arrangement in accordance with guidelines issued by the Ministry of New and Renewable Energy (MNRE) under the PM-Surya Ghar: Muft Bijli Yojana.

The petitioner is a government enterprise under the Ministry of Defence and had already installed 1 MW rooftop solar capacity—400 kW under CAPEX mode and 600 kW under RESCO mode. The petitioner argued that its rooftop capacity allows for a total of 1.6 MW installation and that such an expansion aligns with MNRE’s directive for saturation of government buildings with solar systems by December 31, 2025.

In its submissions, the petitioner emphasized that the restriction of 1 MW capacity in the current RE Regulations contradicts the broader objectives of the Uttarakhand Solar Policy 2023, which encourages maximum rooftop solar installation for government and institutional consumers. The petitioner also pointed out that their sanctioned load is 4500 kVA, which is significantly higher than the additional 600 kW requested, and that their consumption patterns indicate that the installation would not result in excessive export of solar energy into the grid.

Respondents UPCL and UREDA provided their comments, with UPCL opposing the petition on the grounds that relaxing the 1 MW limit would impact billing and revenue realization for the distribution licensee. UPCL argued that the net metering facility already offers consumers substantial benefits and that any surplus energy injected into the grid would burden other consumers. UPCL also emphasized that the power to relax regulations should be used only under special circumstances, not commercial hardship.

UREDA, on the other hand, supported rooftop solar expansion and highlighted that similar permissions had been granted in the past for MES Roorkee and Dehradun to install 2 MW solar plants. However, the Commission clarified that those approvals were under a different model (NoC) in which surplus solar power was injected free of cost, unlike the net metering scheme under which the petitioner would be compensated.

After reviewing the arguments and applicable regulations, the Commission concluded that the petitioner’s request could not be accepted. It stated that the MNRE guidelines allow installation of rooftop solar under different arrangements—net metering, net billing, or gross metering—and do not mandate net metering specifically. Furthermore, the Commission found that granting two types of net metering arrangements under the same connection would not be technically or regulatorily feasible.

As a result, the Commission declined to relax the 1 MW ceiling limit specified in the RE Regulations, 2023 and dismissed the petition for additional rooftop solar capacity installation under net metering.

 

  • Related Posts

    Solex Energy Subsidiary Approves INR 150 Crore Convertible Debenture Issue

    Solex Energy Limited has announced that its wholly owned subsidiary, Solex New Energy Private Limited, has approved a fundraising proposal worth ₹150 crore through the issuance of compulsorily convertible debentures…

    NTPC Appoints Diwakar Nath Misra As Government Nominee Director To Its Board

    NTPC Limited has announced the appointment of Shri Diwakar Nath Misra as a Government Nominee Director on its Board, following an official order issued by the Ministry of Power on…

    Have You Seen?

    Credibility and capital key to scaling-up new helium production

    • October 21, 2026
    Credibility and capital key to scaling-up new helium production

    Russia to Send First Diesel Tanker to U.S. on Thursday

    • October 21, 2026
    Russia to Send First Diesel Tanker to U.S. on Thursday

    Higher Oil Availability Pressures Middle East Crude Benchmarks

    • October 21, 2026
    Higher Oil Availability Pressures Middle East Crude Benchmarks

    Agency Says India Coal-Fired Units Running Critically Low on Fuel as Power Demand Soars

    • October 21, 2026
    Agency Says India Coal-Fired Units Running Critically Low on Fuel as Power Demand Soars

    Set it and forget it: Automated electrolyte management in trace oxygen analysis

    • October 21, 2026
    Set it and forget it: Automated electrolyte management in trace oxygen analysis

    Semiconductor helium demand to reach 2.2 Bcf by 2028

    • October 21, 2026
    Semiconductor helium demand to reach 2.2 Bcf by 2028

    UK Approves Jackdaw Gas Field as Energy Crisis Deepens

    • October 21, 2026
    UK Approves Jackdaw Gas Field as Energy Crisis Deepens

    Morgan Stanley: Global Fuel Market Will Stay Tight Through Mid-2027

    • October 21, 2026
    Morgan Stanley: Global Fuel Market Will Stay Tight Through Mid-2027

    Japan’s Trade Deficit Doubles as Hormuz Crisis Hikes Energy Import Costs

    • October 21, 2026
    Japan’s Trade Deficit Doubles as Hormuz Crisis Hikes Energy Import Costs

    Conversion costs outweigh hydrogen shipping costs: Wood

    • October 21, 2026
    Conversion costs outweigh hydrogen shipping costs: Wood