Union Minister Shri Manohar Lal Reviews Power Sector Of Karnataka, Calls for Financial Reforms And Faster Smart Meter Installation

Union Minister of Power, Shri Manohar Lal, conducted a detailed review of the power sector in Karnataka during his visit to Bengaluru today. The review meeting was attended by Shri Shripad Naik, Union Minister of State for Power and New & Renewable Energy; Shri K. J. George, Minister of Energy, Karnataka; as well as senior officials from the Government of India, the State Government, and REC Ltd. During the meeting, the Karnataka government gave a comprehensive presentation on the status of power generation, transmission, and distribution in the state.

Key points discussed included the current energy mix, challenges related to acquiring land and permissions for transmission infrastructure (Right of Way issues), and the need for enhanced support in upgrading the distribution network. The Union Minister appreciated Karnataka’s efforts in increasing the share of renewable energy in its overall power generation. He mentioned that the purpose of his visit was to gain a better understanding of the issues faced at the ground level and to explore new ways to strengthen the power supply in the state.

He advised the state government to take effective measures to reduce the annual financial losses faced by power utilities. He also emphasized the importance of implementing electricity tariffs that reflect the actual cost of supply. Additionally, he highlighted the need for timely clearance of outstanding dues and subsidies from various government departments. To promote efficiency and transparency, the Minister urged the state to ensure that all government offices, local bodies, and colonies are equipped with prepaid smart meters by August 2025. He also recommended establishing a centralized payment system to manage electricity payments by government departments more effectively.

Shri Manohar Lal further asked the state to expedite the implementation of smart metering for commercial, industrial, and other consumer categories within a fixed timeline. He stressed the importance of resolving Right of Way challenges that are delaying transmission projects and encouraged the adoption of the compensation framework put forward by the Government of India. The Union Minister assured that the central government will continue to support Karnataka in strengthening its power sector and reaffirmed the Centre’s commitment to the development and welfare of the state and its people.

 

  • Related Posts

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Enviromena has started construction of the Longpasture Solar Farm in County Durham, UK, marking a major milestone for the company’s second-largest UK project to date. The company acquired the project…

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    Indian stock markets ended lower on August 24, 2026, as investors remained cautious amid selling pressure across benchmark indices. The S&P BSE SENSEX closed at 77,369.11, declining 0.22%, or around…

    Have You Seen?

    Texas Oil Regulator Elects New Chairman

    • August 24, 2026
    Texas Oil Regulator Elects New Chairman

    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    • August 24, 2026
    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    • August 24, 2026
    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    • August 24, 2026
    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    Japan Power Prices Surge to Highest Since 2023

    • August 24, 2026
    Japan Power Prices Surge to Highest Since 2023

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    • August 24, 2026
    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    • August 24, 2026
    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    • August 24, 2026
    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    • August 24, 2026
    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    • August 24, 2026
    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia