SJVN Invites Bids For 1000 kW Rooftop Solar Project At Itanagar Secretariat Under PM Surya Ghar Yojana

SJVN Limited has issued a request for selection (RfS) inviting bids from eligible solar developers to set up rooftop solar power projects with a cumulative capacity of 1000 kW. The projects are to be installed at the Civil Secretariat Complex in Itanagar and nearby areas under the CAPEX model, as part of the PM Surya Ghar: Muft Bijli Yojana. The work includes installation without battery storage and comes with a mandatory five-year comprehensive operation and maintenance (O&M) period post-commissioning.

The estimated cost of the work is ₹5.5 crore, inclusive of GST. The Earnest Money Deposit (EMD) required is ₹11 lakh. This EMD must be submitted either through a Bank Guarantee, Demand Draft, NEFT, or RTGS. A Performance Bank Guarantee (PBG) is also mandatory and should be submitted as per the RfS document’s conditions.

The tender follows a single-stage, two-envelope e-tendering system. The pre-bid meeting is scheduled to be held on July 11, 2025, at 15:00 hrs at SJVN’s head office in Shimla or through Microsoft Teams. Bidders must submit their online bids by July 22, 2025, before 13:00 hrs. Additionally, the hard copies of supporting documents are to be submitted by August 1, 2025, by 18:00 hrs. The opening of the technical bids will take place on July 22, 2025, at 15:00 hrs, while the opening date for financial bids will be announced later. The selected bidder is expected to complete the project within six months from the date of issuance of the Letter of Award (LoA).

Interested developers must download the official RfS documents from the ISN-ETS portal and are required to pay a non-refundable tender document fee of Rs. 5,900 (inclusive of GST) via NEFT or RTGS. Details of the payment must be emailed to SJVN with proper proof and declarations.

The selection will be done through competitive bidding, and all bidders must adhere strictly to the instructions mentioned in the RfS. The project is funded by the Arunachal Pradesh Energy Development Agency (APEDA) and not by SJVN. All project payments will be made by APEDA as per the RfS conditions.

Bidders can avail of incentives like tax holidays and accelerated depreciation, but should factor in these independently without affecting the bid comparison. All queries or clarifications must be addressed to the SJVN Contracts team, and the contact information is provided in the RfS document.

 

  • Related Posts

    Philippine National Bank Backs PHP 6.22 Billion Solar And Battery Storage Project In Iloilo

    Philippine National Bank (PNB) is supporting a 6.22 billion peso co-financing package for a major clean energy project in Barotac Viejo, Iloilo, Philippines. Developed by Singapore-based Levanta Renewables, the project…

    SEPCOIII Begins Full Commercial Operation Of Saudi Red Sea Utility Project

    Chinese engineering company SEPCOIII has achieved full commercial operation of the Saudi Red Sea Utility Infrastructure Project, marking a major milestone in the development of renewable-powered tourism infrastructure. The project…

    Have You Seen?

    Asia Steps In to Fill Diesel Supply Gap in Africa as Middle East Exports Crash

    • August 31, 2026
    Asia Steps In to Fill Diesel Supply Gap in Africa as Middle East Exports Crash

    Iran Dismisses Trump Claim of Kharg Attack as Hostilities Return

    • August 31, 2026
    Iran Dismisses Trump Claim of Kharg Attack as Hostilities Return

    China Coking Coal Prices Set for Record 46% Monthly Surge

    • August 31, 2026
    China Coking Coal Prices Set for Record 46% Monthly Surge

    Europe Gas Prices Jump 5% to Highest Level Since 2023

    • August 31, 2026
    Europe Gas Prices Jump 5% to Highest Level Since 2023

    Trump Says Venezuelan Oil Will Refill U.S. Strategic Petroleum Reserve

    • August 31, 2026
    Trump Says Venezuelan Oil Will Refill U.S. Strategic Petroleum Reserve

    Goldman Sachs Sees Diesel Refining Margins Soaring to $63 a Barrel

    • August 31, 2026
    Goldman Sachs Sees Diesel Refining Margins Soaring to $63 a Barrel

    Asian Refiners Turn to Argentina as Iran War Disrupts Oil Supply

    • August 31, 2026
    Asian Refiners Turn to Argentina as Iran War Disrupts Oil Supply

    Lithium Miners Cash In as Battery Storage Demand Surges

    • August 31, 2026
    Lithium Miners Cash In as Battery Storage Demand Surges

    Iran Says Supertanker Hit by Mines in Strait of Hormuz

    • August 31, 2026
    Iran Says Supertanker Hit by Mines in Strait of Hormuz

    China’s LNG Imports Set to Drop 18% in August as Prices Soar

    • August 31, 2026
    China’s LNG Imports Set to Drop 18% in August as Prices Soar