Ethical Power Seals First Solar EPC Contracts In Italy, Marking Major Expansion In Renewables

Ethical Power Italia, a part of Ethical Power Group, has secured its first solar EPC contracts in Italy. These projects involve building two solar farms for Encavis AG: the 9MW Cobu Solar Farm and the 9.3MW Massarenti Solar Farm, both located in Emilia-Romagna, Northern Italy. The farms will feature single-axis tracker systems, with the Cobu project also including a 5km MV grid connection line to the nearest access point. Construction is set to begin in early 2025, with both projects expected to be operational by the end of the year. Once complete, the farms will collectively produce around 28GWh of electricity annually.

Francesca Cavallini, Country Manager for Ethical Power Italia, stated, “As an Ethical Power Group company, drawing upon a wealth of experience gained from diverse global landscapes, we will bring a world-class approach to harnessing Italy’s abundant sunlight and deliver cutting-edge solar projects at Cobu and Massarenti. We are delighted to have signed our first contracts now with a leading European renewables company Encavis AG as a client, continuing our successful international relationship with them.”

Encavis AG has awarded its second solar EPC contract to Ethical Power Group companies. The first project, the 55MW Fundici Solar Farm in Spain, is almost complete. Earlier this month, Encavis AG acquired the Cobu and Massarenti solar projects from Hive Energy at the ready-to-build stage. Italy’s solar energy sector is expanding rapidly, with 5.23 GW of new solar capacity added in 2023, marking the highest annual growth since 2011. Ethical Power Italia is working on an additional 200MW of solar and battery energy storage system (BESS) projects to support the continued growth of renewables in the country.

 

  • Related Posts

    CSERC Rejects Immediate Pre-Payment Meter Relief For HT Consumer, Allows Security Deposit In Installments

    The Chhattisgarh State Electricity Regulatory Commission (CSERC) has disposed of a petition filed by M/s Fortune Metaliks Limited against the Chhattisgarh State Power Distribution Company Limited (CSPDCL), concerning a security…

    APTEL Rejects Compensation Claim Over Increased Solar And Wind Grid Connectivity Charges In Rajasthan

    The Appellate Tribunal for Electricity (APTEL) has dismissed an appeal filed by NTPC Renewable Energy Limited seeking compensation for an increase in grid connectivity charges for a solar power project…

    Have You Seen?

    Petronas, TotalEnergies, Mitsui form JV for 5 mtpa Malaysia CCS hub

    • October 23, 2026
    Petronas, TotalEnergies, Mitsui form JV for 5 mtpa Malaysia CCS hub

    AI’s next step in oxygen therapy

    • October 23, 2026
    AI’s next step in oxygen therapy

    Air Liquide to explore ASU upgrades and argon recovery at fertiliser plants in Vietnam

    • October 23, 2026
    Air Liquide to explore ASU upgrades and argon recovery at fertiliser plants in Vietnam

    Heidelberg halts German cement CCS project over CO2 infrastructure concerns

    • October 23, 2026
    Heidelberg halts German cement CCS project over CO2 infrastructure concerns

    Singapore pairs biomethane pilot with S$143m industrial decarbonisation funding

    • October 23, 2026
    Singapore pairs biomethane pilot with S$143m industrial decarbonisation funding

    Citi’s $60 Oil Call Meets $112 Brent

    • October 23, 2026
    Citi’s $60 Oil Call Meets $112 Brent

    Asia Needs $1 Trillion a Year to Secure Energy Supplies

    • October 23, 2026
    Asia Needs $1 Trillion a Year to Secure Energy Supplies

    CSERC Rejects Immediate Pre-Payment Meter Relief For HT Consumer, Allows Security Deposit In Installments

    • October 23, 2026
    CSERC Rejects Immediate Pre-Payment Meter Relief For HT Consumer, Allows Security Deposit In Installments

    APTEL Rejects Compensation Claim Over Increased Solar And Wind Grid Connectivity Charges In Rajasthan

    • October 23, 2026
    APTEL Rejects Compensation Claim Over Increased Solar And Wind Grid Connectivity Charges In Rajasthan

    BOC opens Teesside CO2 plant as UK seeks to strengthen domestic supply

    • October 23, 2026
    BOC opens Teesside CO2 plant as UK seeks to strengthen domestic supply