Balmer Lawrie Issues Re-Tender For 150 kWp Solar Plant And Electrical Works In Serampore, West Bengal

Representational image. Credit: Canva

Balmer Lawrie & Co. Ltd. has issued a re-tender for the supply, installation, testing, and commissioning of electrical works and a 150 kWp pre-engineered building (PEB) roof-mounted solar plant at Delhi Road, Serampore, West Bengal. The tender, identified under reference number BL/LS/KOL/3PL/24-25/04R, was published on January 15, 2025. Interested bidders must submit their documents online and in hard copy before January 27, 2025, at 4:00 PM. The technical bid opening is scheduled for the same day at 5:00 PM.

The project includes two major components: electrical works and the installation of a solar plant. The electrical scope comprises tasks such as installing LT power control panels, wiring, earthing systems, and high-voltage low-speed fans. The solar plant segment involves the design, procurement, and commissioning of the solar PV system, which will operate under a five-year comprehensive annual maintenance contract (AMC) after a one-year defect liability period.

An Earnest Money Deposit (EMD) of ₹86,000 is required for participation. This amount can be submitted via demand draft, bank guarantee, or online transfer. The EMD must remain valid for 120 days from the submission deadline and will be refunded to unsuccessful bidders after the contract award. For the successful bidder, a performance security deposit equivalent to 2% of the basic contract value must be submitted within 15 days of the work order.

The project completion timeline is six months from the work order date or two months after the final work-front handover, whichever is later. Delays will incur liquidated damages at 0.5% of the contract value per week, capped at 5%.

Bidders must meet several pre-qualification criteria, including prior experience in similar projects, financial stability with a turnover exceeding ₹1 crore in the past three years, and possession of valid electrical licenses. Documents such as audited financial reports, work completion certificates, and technical proposals must be submitted.

This initiative aims to advance the infrastructure at the logistics facility while contributing to renewable energy adoption through the integration of solar power systems.

 

  • Related Posts

    India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

    NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Green Energy Limited, has secured 500 MW under SECI’s FDRE-IX tender at a discovered tariff of ₹6/kWh. The…

    Cube Green Energy Appoints Dr Felix Grolman as Executive Chair to Drive European Renewable Energy Growth

    Cube Green Energy, an integrated renewable energy and battery storage platform, has appointed Dr Felix Grolman as Executive Chair, effective August 1, 2026, as the company advances the expansion of…

    Have You Seen?

    India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

    • August 25, 2026
    India Daily: NTPC REL Secures 500 MW, POWERGRID Tenders 265 MW BESS, RE Generation Crosses 38,497 MU, REC Transfers Luhri SPV, OREDA Tenders Rooftop Solar, POWERGRID Wins ₹822.91 Cr Project, KELTRON Tenders Solar Projects

    Equinor considers putting more wind into East Africa LNG sails

    • August 25, 2026
    Equinor considers putting more wind into East Africa LNG sails

    Cube Green Energy Appoints Dr Felix Grolman as Executive Chair to Drive European Renewable Energy Growth

    • August 25, 2026
    Cube Green Energy Appoints Dr Felix Grolman as Executive Chair to Drive European Renewable Energy Growth

    Building the Grid for India’s Next Energy Era: Amit Dutta on Transmission, Renewables and Engineering

    • August 25, 2026
    Building the Grid for India’s Next Energy Era: Amit Dutta on Transmission, Renewables and Engineering

    US CO2 outlook: Recent shifts in CCUS activity

    • August 25, 2026
    US CO2 outlook: Recent shifts in CCUS activity

    GameChange Energy Commissions Tracker System at 23 MWp Dannevirke Solar Farm in New Zealand

    • August 25, 2026
    GameChange Energy Commissions Tracker System at 23 MWp Dannevirke Solar Farm in New Zealand

    Analysts Examine Latest USA Measures Against Iran

    • August 25, 2026
    Analysts Examine Latest USA Measures Against Iran

    Japan trial targets high-purity CO2 recovery from sewage sludge

    • August 25, 2026
    Japan trial targets high-purity CO2 recovery from sewage sludge

    Global Solar Energy Market to Nearly Double to $974.7 Billion by 2031: BCC Research

    • August 25, 2026
    Global Solar Energy Market to Nearly Double to $974.7 Billion by 2031: BCC Research

    Memory pricing and AI to drive semiconductor growth

    • August 25, 2026
    Memory pricing and AI to drive semiconductor growth