Google Deploys AI to Speed up Connections at PJM, Largest US Power Grid

Summary

• Electricity customers hope to cut wait times to connect to grid
• The first time AI will be used to manage grid connections
• US power demand jumps as Big Tech rolls out data centers for AI

(Reuters) – Alphabet Inc’s Google unit is partnering with the largest electrical grid operator in North America, PJM Interconnection, to roll out artificial intelligence technologies aimed at getting new power supplies connected faster, the company said on Thursday.

The collaboration is the first time AI would be used to comprehensively manage an interconnection queue. Electricity demand has been rising as Big Tech builds more data centers to train and deploy artificial intelligence.

“The industry has been talking about building smarter grids for well over a decade, and now with AI, we have a real opportunity to turn discussion into action,” Amanda Peterson Corio, Google’s data center energy lead, said at a press conference.

Wait times have grown to historic lengths in recent years for connecting the country’s grids to new electricity supplies generated from sources like wind, solar and natural gas.

Those delays have worsened an electricity supply crunch in many parts of the country, pushing up power bills and raising the risk of blackouts, as old power plants retire faster than new supplies connects.

Google, in partnership with the Alphabet-backed Tapestry, says it can help eliminate at least some of the wait by using artificial intelligence to synthesize information and automate parts of the review and planning processes for projects in line to connect to PJM.

“This is really about automating a lot of the things that are being laboriously reviewed,” said Page Crahan, General Manager of Tapestry, which will work with PJM to develop AI tools and models that will be rolled out in 2025 and phased in over the course of several years.

Initially, the technology will be used to automate parts of processes currently done by hand by grid planners, including a review of applications to determine whether a project seeking to connect to the grid is viable.

Over time, the collaboration between Google, Tapestry and PJM will develop a model of the PJM grid like a Google Maps for grid information, “bringing in different layers that planners might need to see in a single toggle on and off view to guide faster decisions, introduce new insights, hopefully find efficiencies in those ways,” Crahan said.

It remained too early to say how working with Google would cut down on times to add new power plant supply to the system, said Aftab Khan, executive vice president of operations, planning and security for PJM.

PJM controls the electrical system that covers 67 million people in the U.S. PJM’s territory includes northern Virginia, the world’s largest data center hub.
Reporting by Laila Kearney; Editing by David Gregorio

Share This:


More News Articles

 

  • Related Posts

    Permian Landowner EagleRock Eyes $2.6 billion Valuation in US IPO

    Land management company EagleRock is targeting a valuation of up to $2.6 billion in its initial public offering in the United States, as it seeks to tap renewed investor interest…

    Trump Administration Cites National Security to Halt US Wind Farm Projects

    A drone view of windmills near the Sacramento River where it enters the California Delta near Rio Vista, California, U.S. December 28, 2025. REUTERS/Fred Greaves/File photo (Reuters) – President Donald…

    Have You Seen?

    AOI wins $20.85m state grant for semiconductor capacity expansion

    • May 4, 2026
    AOI wins $20.85m state grant for semiconductor capacity expansion

    Oil Up 3% After Iran Claims it Attacked US Warship; US Denies Report

    • May 4, 2026
    Oil Up 3% After Iran Claims it Attacked US Warship; US Denies Report

    Fervo Energy Eyes $6.5 Billion Valuation in US IPO

    • May 4, 2026
    Fervo Energy Eyes $6.5 Billion Valuation in US IPO

    Trump Administration Cites National Security to Halt US Wind Farm Projects

    • May 4, 2026
    Trump Administration Cites National Security to Halt US Wind Farm Projects

    Permian Landowner EagleRock Eyes $2.6 billion Valuation in US IPO

    • May 4, 2026
    Permian Landowner EagleRock Eyes $2.6 billion Valuation in US IPO

    Russian Oil Cargo Set to Arrive in Japan Amid Supply Strains

    • May 4, 2026
    Russian Oil Cargo Set to Arrive in Japan Amid Supply Strains

    $125 Oil Could Tip Global Economy Into Recession

    • May 4, 2026
    $125 Oil Could Tip Global Economy Into Recession

    Global Methane Cuts Could Unlock Double the Gas Volumes Hit by Hormuz Crisis

    • May 4, 2026
    Global Methane Cuts Could Unlock Double the Gas Volumes Hit by Hormuz Crisis

    First India-Bound LPG Tanker Clears Hormuz Since U.S. Blockade Began

    • May 4, 2026
    First India-Bound LPG Tanker Clears Hormuz Since U.S. Blockade Began

    Video | What China’s electrolyser market means for global manufacturers

    • May 4, 2026
    Video | What China’s electrolyser market means for global manufacturers