APTEL Orders CESCOM To Pay ₹6.89/kWh Tariff And Refund Deductions In 50 MW Solar Project Case

Representational image. Credit: Canva

On May 30, 2025, the Appellate Tribunal for Electricity passed a significant order in Execution Petition No. 16 of 2021 filed by Azure Sunrise Private Limited. The company had approached the Tribunal seeking enforcement of its earlier judgment dated February 28, 2020, in Appeal No. 340 of 2016. Azure Sunrise is a special purpose vehicle of Azure Power India Private Limited, which signed a Power Purchase Agreement (PPA) on January 2, 2015, with Chamundeshwari Electricity Supply Corporation Limited (CESCOM) for a 50 MW solar project in Karnataka.

The dispute began when KREDL, the nodal agency, awarded the solar project to Azure’s parent company, and a PPA was signed between Azure Sunrise and CESCOM. However, both original copies of the PPA were retained by CESCOM for submission to the Karnataka Electricity Regulatory Commission (KERC) and only a scanned version was shared with Azure. Due to the delay in receiving the approved and effective PPA, which was eventually provided on May 21, 2015, the project was delayed by 137 days. Though CESCOM initially granted an extension for this delay, later they sought to reduce the applicable tariff from ₹6.89/kWh to ₹6.51/kWh and imposed penalties, citing KERC’s directions.

KERC, in its order dated December 14, 2016, not only upheld the reduced tariff but also limited the time extension to just 25 days instead of the initially approved 137 days. Azure Sunrise challenged this before the Tribunal, which in its 2020 judgment ruled in Azure’s favor. The Tribunal held that the reduction in time extension, lowering of tariff, and imposition of liquidated damages were not legally sustainable and should be set aside. Despite this clear judgment, CESCOM failed to make payments to Azure at the PPA tariff and continued paying at the lower interim rate of ₹4.36/kWh.

As CESCOM did not implement the judgment, Azure Sunrise filed the execution petition in 2021. It sought payment of ₹89.27 crore as the outstanding amount and ₹29.44 crore as interest, calculated at 1.25% per month, following the late payment surcharge provision in the PPA. Azure also sought a refund of all liquidated damages deducted earlier.

The Tribunal reiterated that the execution court cannot modify or go beyond the terms of the final judgment. It emphasized that CESCOM had neither challenged the 2020 judgment before the Supreme Court nor sought any review or clarification. The Tribunal noted with disapproval CESCOM’s conduct of non-compliance, misrepresentation, and failure to disclose facts during the execution proceedings. It stated that the continued underpayment and non-refund of damages constituted wilful disobedience of the Tribunal’s order.

The Tribunal concluded that Azure Sunrise’s request was well within the scope of the original judgment and deserved full enforcement. It directed CESCOM to pay the differential amount between ₹6.89/kWh and ₹4.36/kWh for all energy supplied from the project’s commissioning date until the effective realization date. CESCOM was also ordered to refund all liquidated damages along with interest and carrying costs within six weeks.

The Tribunal made it clear that if CESCOM failed to comply within the stipulated period, its bank accounts would be attached and the required amount would be recovered from them. With this, the execution petition and any related applications were disposed of.

 

  • Related Posts

    Indian Green Energy Stocks Show Mixed Performance As Sensex And Nifty End Higher On June 24

    Professionals analyze rising trends in Indian green energy stocks in a modern office. The Indian stock market ended on a positive note on June 24, 2026, with both benchmark indices…

    Week in South East Asia: Meralco-MGEN Eye 2.5 GW RE Project; Novva Buys 120 MWp Solar Asset; TotalEnergies ENEOS Expands Rooftop Solar and More…

    Representational image. Credit: Canva Meralco PowerGen Corporation (MGEN), Meralco, and Vietnam-based VinEnergo have signed an agreement to explore a 2.5 GW renewable energy project in the Philippines. The proposed development…

    Have You Seen?

    ABB flowmeter certification boosts industry safety

    • June 25, 2026
    ABB flowmeter certification boosts industry safety

    Video | Protecting patient data in the age of connected healthcare

    • June 25, 2026
    Video | Protecting patient data in the age of connected healthcare

    AI could cut LNG production costs by $80bn a year by 2050

    • June 25, 2026
    AI could cut LNG production costs by $80bn a year by 2050

    Sinopec awarded FEED contract for huge Uzbekistan e-fuels project

    • June 25, 2026
    Sinopec awarded FEED contract for huge Uzbekistan e-fuels project

    Euro Sinks To One-Year Low As Oil Price Drop Fuels ECB Rate Cut Bets

    • June 25, 2026
    Euro Sinks To One-Year Low As Oil Price Drop Fuels ECB Rate Cut Bets

    Moscow Refinery May Stay Offline Until 2027

    • June 25, 2026
    Moscow Refinery May Stay Offline Until 2027

    Rosneft Proposes Oil Firms to Refine 30% of Crude in Russia to Ease Fuel Crunch

    • June 25, 2026
    Rosneft Proposes Oil Firms to Refine 30% of Crude in Russia to Ease Fuel Crunch

    Air Liquide to build two nitrogen units for Silleno plant in Kazakhstan

    • June 25, 2026
    Air Liquide to build two nitrogen units for Silleno plant in Kazakhstan

    Irish developer eyes exclusive rights to manufacture CPH2 electrolysers

    • June 25, 2026
    Irish developer eyes exclusive rights to manufacture CPH2 electrolysers

    Arc3 Gases brings helium purifier online in Virginia

    • June 25, 2026
    Arc3 Gases brings helium purifier online in Virginia