APTEL Orders CESCOM To Pay ₹6.89/kWh Tariff And Refund Deductions In 50 MW Solar Project Case

Representational image. Credit: Canva

On May 30, 2025, the Appellate Tribunal for Electricity passed a significant order in Execution Petition No. 16 of 2021 filed by Azure Sunrise Private Limited. The company had approached the Tribunal seeking enforcement of its earlier judgment dated February 28, 2020, in Appeal No. 340 of 2016. Azure Sunrise is a special purpose vehicle of Azure Power India Private Limited, which signed a Power Purchase Agreement (PPA) on January 2, 2015, with Chamundeshwari Electricity Supply Corporation Limited (CESCOM) for a 50 MW solar project in Karnataka.

The dispute began when KREDL, the nodal agency, awarded the solar project to Azure’s parent company, and a PPA was signed between Azure Sunrise and CESCOM. However, both original copies of the PPA were retained by CESCOM for submission to the Karnataka Electricity Regulatory Commission (KERC) and only a scanned version was shared with Azure. Due to the delay in receiving the approved and effective PPA, which was eventually provided on May 21, 2015, the project was delayed by 137 days. Though CESCOM initially granted an extension for this delay, later they sought to reduce the applicable tariff from ₹6.89/kWh to ₹6.51/kWh and imposed penalties, citing KERC’s directions.

KERC, in its order dated December 14, 2016, not only upheld the reduced tariff but also limited the time extension to just 25 days instead of the initially approved 137 days. Azure Sunrise challenged this before the Tribunal, which in its 2020 judgment ruled in Azure’s favor. The Tribunal held that the reduction in time extension, lowering of tariff, and imposition of liquidated damages were not legally sustainable and should be set aside. Despite this clear judgment, CESCOM failed to make payments to Azure at the PPA tariff and continued paying at the lower interim rate of ₹4.36/kWh.

As CESCOM did not implement the judgment, Azure Sunrise filed the execution petition in 2021. It sought payment of ₹89.27 crore as the outstanding amount and ₹29.44 crore as interest, calculated at 1.25% per month, following the late payment surcharge provision in the PPA. Azure also sought a refund of all liquidated damages deducted earlier.

The Tribunal reiterated that the execution court cannot modify or go beyond the terms of the final judgment. It emphasized that CESCOM had neither challenged the 2020 judgment before the Supreme Court nor sought any review or clarification. The Tribunal noted with disapproval CESCOM’s conduct of non-compliance, misrepresentation, and failure to disclose facts during the execution proceedings. It stated that the continued underpayment and non-refund of damages constituted wilful disobedience of the Tribunal’s order.

The Tribunal concluded that Azure Sunrise’s request was well within the scope of the original judgment and deserved full enforcement. It directed CESCOM to pay the differential amount between ₹6.89/kWh and ₹4.36/kWh for all energy supplied from the project’s commissioning date until the effective realization date. CESCOM was also ordered to refund all liquidated damages along with interest and carrying costs within six weeks.

The Tribunal made it clear that if CESCOM failed to comply within the stipulated period, its bank accounts would be attached and the required amount would be recovered from them. With this, the execution petition and any related applications were disposed of.

 

  • Related Posts

    FTC Solar Announces Supply Agreement with Lubanzi Inala

    AUSTIN, Texas, February 23, 2026— FTC Solar, Inc. (Nasdaq: FTCI), a leading provider of solar tracker systems, software, and engineering services, announced today a three-year supply agreement from Lubanzi Inala,…

    Adani Green Energy Creates New Step-Down Subsidiary Skyspin Energy To Produce And Distribute Power From Wind, Solar & Other Renewables

    Representational image. Credit: Canva Adani Green Energy Ltd has announced the creation of a new step-down subsidiary dedicated to the production and distribution of electricity from renewable energy sources. The…

    Have You Seen?

    US Natgas Prices Climb as Winter Storm Batters US Northeast, LNG Export Flows Near Record

    • February 23, 2026
    US Natgas Prices Climb as Winter Storm Batters US Northeast, LNG Export Flows Near Record

    Watch Out for Oil’s Disappearing Disinflationary Drag: McGeever

    • February 23, 2026
    Watch Out for Oil’s Disappearing Disinflationary Drag: McGeever

    Dominion Energy Forecasts Annual Profit Below Estimates, Raises Spending Plan

    • February 23, 2026
    Dominion Energy Forecasts Annual Profit Below Estimates, Raises Spending Plan

    $100 Oil Price Forecasts Resurface Amid U.S.-Iran Standoff

    • February 23, 2026
    $100 Oil Price Forecasts Resurface Amid U.S.-Iran Standoff

    Chevron Moves to Acquire Lukoil’s Major West Qurna 2 Oilfield in Iraq

    • February 23, 2026
    Chevron Moves to Acquire Lukoil’s Major West Qurna 2 Oilfield in Iraq

    Supreme Court to Rule on Exxon’s $1 Billion Cuba Assets Claim

    • February 23, 2026
    Supreme Court to Rule on Exxon’s $1 Billion Cuba Assets Claim

    UN Secretary General: Clean Energy Future Is within Reach

    • February 23, 2026
    UN Secretary General: Clean Energy Future Is within Reach

    Ukraine receives first delivery of regasified LNG from Germany

    • February 23, 2026
    Ukraine receives first delivery of regasified LNG from Germany

    EU-backed project targets high-purity hydrogen from ammonia cracking

    • February 23, 2026
    EU-backed project targets high-purity hydrogen from ammonia cracking

    The wide-ranging impacts of Indonesia’s nickel supply decline

    • February 23, 2026
    The wide-ranging impacts of Indonesia’s nickel supply decline