bp and Iberdrola España Begin Construction of Spain’s Largest Green Hydrogen Plant

The joint venture between bp and Iberdrola España has commenced construction on Spain’s largest green hydrogen project, a 25 MW facility in Castellón. The project, expected to create up to 500 jobs during construction, involves around 25 Spanish companies. The first phase includes earthworks and site preparation on a 20,000 m² plot near the bp refinery, with civil works beginning in Q2 2025. The main equipment, including electrolysers, will be installed in the second half of the year.

Carolina Mesa, bp’s vice president of hydrogen for Spain and new markets, said, “The start of construction of the largest green hydrogen plant in Spain is great news, because it allows us to see tangible progress in an important industrial decarbonisation project. The bp refinery in Castellón consolidates itself as a model for the transformation of refineries into integrated energy hubs”.

Jorge Palomar Herrero, Director of Hydrogen Development at Iberdrola added, “This project is already enabling the real development of the hydrogen value chain in our country with key equipment manufactured in Spain and contracting more than 25 local companies. The project also brings in 200 GWh/year of renewable energy from Iberdrola’s wind and photovoltaic plants in Spain and meets all EU requirements to ensure that the hydrogen produced is green hydrogen”.

With an investment exceeding €70 million, the project is being developed through Castellón Green Hydrogen S.L., equally owned by bp and Iberdrola España. The plant will be powered by renewable energy via a power purchase agreement (PPA) and is set to produce 2,800 tonnes of green hydrogen annually. This will replace part of the grey hydrogen currently used at the refinery, reducing CO₂ emissions by approximately 23,000 tonnes per year—the equivalent of removing 5,000 cars from the road. Future phases aim to supply green hydrogen to hard-to-decarbonize industries, such as ceramics and heavy transport. The initiative has secured €15 million in funding from Spain’s Recovery, Transformation, and Resilience Plan, backed by the EU’s NextGenerationEU program. The plant is expected to be operational by the second half of 2026.

 

  • Related Posts

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Enviromena has started construction of the Longpasture Solar Farm in County Durham, UK, marking a major milestone for the company’s second-largest UK project to date. The company acquired the project…

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    Indian stock markets ended lower on August 24, 2026, as investors remained cautious amid selling pressure across benchmark indices. The S&P BSE SENSEX closed at 77,369.11, declining 0.22%, or around…

    Have You Seen?

    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    • August 24, 2026
    Exxon Eyes Shell’s $8 Billion U.S. Chemicals Business

    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    • August 24, 2026
    Iran Unveils Huge New Gas Discovery Amid U.S. Economic Pressure

    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    • August 24, 2026
    Norway Vows to Keep Drilling for Oil and Gas in the Arctic

    Japan Power Prices Surge to Highest Since 2023

    • August 24, 2026
    Japan Power Prices Surge to Highest Since 2023

    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    • August 24, 2026
    Enviromena Begins Construction of Longpasture Solar Farm, Its Second-Largest UK Project, Targeting 2027 Energisation

    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    • August 24, 2026
    Indian Green Energy Stocks Show Mixed Performance Amid Market Weakness (24 August 2026)

    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    • August 24, 2026
    MPA Completes 780,000 kWh Solar Power System At Singapore’s Marina South Pier

    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    • August 24, 2026
    Solar SG Targets Next Growth Phase as Singapore Raises Solar Capacity Goal to 3 GWp by 2030

    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    • August 24, 2026
    ACWA Signs Storage Services Agreements for 1.5 GW/6 GWh BESS Projects in Saudi Arabia

    Lithuania approves EIA programme for Klaipėda CO2 terminal

    • August 24, 2026
    Lithuania approves EIA programme for Klaipėda CO2 terminal