Novorossiysk Restarts Oil Loadings at Reduced Capacity After Drone Strike

Russia has restarted limited oil loadings at its Black Sea port of Novorossiysk after a drone attack earlier this week forced a full suspension.

Operations at the Sheskharis terminal resumed late Thursday, but only one berth is currently active. A single cargo of roughly 80,000 tons is expected to depart, well below the terminal’s normal capacity of about 700,000 barrels per day.

The restart comes after the Monday strike that caused fires at a fuel terminal and damaged loading infrastructure. Shipments were halted entirely. The loading schedule had since been cut, and there is no timeline for a full return to operations.

Fuel flows are also only partially back. Fuel oil loadings resumed Thursday, and at least one diesel cargo has been shipped since the attack, according to Reuters sources familiar with port activity. Novorossiysk is one of Russia’s main export outlets on the Black Sea and a critical node for both Russian and Kazakh crude. The port handles shipments tied to the Caspian Pipeline Consortium system, which moves crude from major Kazakhstan fields including Tengiz and Kashagan.

Damage to infrastructure earlier this week included impacts to storage tanks and loading equipment linked to CPC operations. Kazakhstan has said its export flows remain stable, but it’s now operating with reduced flexibility.

Russian export infrastructure, including Baltic ports like Primorsk and Ust-Luga and several inland refineries, have repeatedly found themselves the target of Ukrainian drone attacks.

Each hit has tightened operational capacity rather than shutting it down completely. Cargoes are still moving, but at reduced rates and with fewer loading options available.

Novorossiysk’s partial restart restores some export flow, but capacity remains constrained.

By Julianne Geiger for Oilprice.com

More Top Reads From Oilprice.com

 

  • Related Posts

    Oil Remains in a Divided Market

    Oil remains in a divided market – prices are stabilizing, but upside is capped by demand uncertainty and expected supply increases. That’s what Waleed Said, Technical Analyst at GivTrade, stated…

    Trump Administration Advances New California Oil Lease Plans

    The Bureau of Land Management is giving California another chance to weigh in on oil and gas leasing—whether the state wants it or not. On Thursday, the BLM opened a…

    Have You Seen?

    Höegh Evi validates ammonia cracking tech for floating hydrogen terminals

    • July 3, 2026
    Höegh Evi validates ammonia cracking tech for floating hydrogen terminals

    Oil Remains in a Divided Market

    • July 3, 2026
    Oil Remains in a Divided Market

    KERC Schedules Public Hearing On Solar Tariffs And Regulatory Framework For 2026–2029 In Karnataka

    • July 3, 2026
    KERC Schedules Public Hearing On Solar Tariffs And Regulatory Framework For 2026–2029 In Karnataka

    IRENA Report: Over 90% of New Renewable Power Added in 2025 Was Cheaper Than Fossil Fuels, Saving USD 480 Billion in Fuel Costs

    • July 3, 2026
    IRENA Report: Over 90% of New Renewable Power Added in 2025 Was Cheaper Than Fossil Fuels, Saving USD 480 Billion in Fuel Costs

    Column | Three reasons a Burnham government could get UK hydrogen moving again

    • July 3, 2026
    Column | Three reasons a Burnham government could get UK hydrogen moving again

    GERC Reserves Order On GIFTPCL Petition For HT Billing And LT Metering In GIFT City High-Rises

    • July 3, 2026
    GERC Reserves Order On GIFTPCL Petition For HT Billing And LT Metering In GIFT City High-Rises

    KPI Green Energy Approves 75,000 ESOPs for Employee Under ESOP 2023

    • July 3, 2026
    KPI Green Energy Approves 75,000 ESOPs for Employee Under ESOP 2023

    EWE breaks ground on 24km hydrogen pipeline from 320MW electrolyser

    • July 3, 2026
    EWE breaks ground on 24km hydrogen pipeline from 320MW electrolyser

    Coal India Secures LOA for 600 MW Solar Power Project at Jalaun Solar Park in Uttar Pradesh

    • July 3, 2026
    Coal India Secures LOA for 600 MW Solar Power Project at Jalaun Solar Park in Uttar Pradesh

    APTEL Allows Delayed Appeal In 300 MW Solar Project Dispute With Cost Penalty

    • July 3, 2026
    APTEL Allows Delayed Appeal In 300 MW Solar Project Dispute With Cost Penalty