Pace Digitek Secures 250 MW/500 MWh BESS Project Order Worth ₹7,020 Million from Damodar Valley Corporation

A large electrical substation featuring rows of battery storage containers and transformers.

Pace Digitek Limited has secured Battery Energy Storage System (BESS) supply, erection, and long-term operation and maintenance contracts from Damodar Valley Corporation for a major energy storage project at Maithon. The total value of the contracts stands at ₹7,020 million, including GST, marking a significant milestone for the company in the growing energy storage sector.

The project involves the implementation of a 250 MW/500 MWh Battery Energy Storage System in Jharkhand. The scope of work includes design, engineering, manufacturing-linked supply, installation, testing, commissioning, and a comprehensive 12-year operation and maintenance service. The company will also execute associated civil, structural, and evacuation infrastructure works as part of the contract.

The contracts are divided into supply, EPC services, and long-term O&M agreements. Pace Digitek will complete the supply and EPC execution within 18 months, followed by 12 years of maintenance and operational support. The order is expected to strengthen the company’s position in the utility-scale energy storage market and enhance its presence in renewable energy-linked projects.

This is the company’s first BESS order win for FY2027 and follows strong momentum achieved during FY2026. During the previous financial year, Pace Digitek reported energy order inflows worth ₹58,147 million, driven mainly by increasing opportunities in battery energy storage systems and renewable energy integration projects.

The company stated that the order demonstrates its ability to execute projects across the complete BESS value chain, including manufacturing, EPC execution, and lifecycle management services. Its manufacturing-led execution model combines in-house capacity with a secured project pipeline, helping the company maintain better control over costs, timelines, and quality standards while supporting large-scale deployments.

Chairman and Managing Director Venugopal Rao Maddisetty said the order from DVC strengthens the company’s position in utility-scale energy storage and reflects the strength of its integrated business model. He added that energy storage is becoming increasingly important for renewable energy integration, and the company is focused on expanding its manufacturing-led platform to ensure efficient execution, cost control, and long-term asset performance.

With multiple recent project wins from leading utilities, Pace Digitek continues to expand its BESS portfolio. Following this latest order, the company’s total BESS project portfolio has crossed 5 GWh, covering utility-scale storage, renewable integration, and grid support applications.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    India Daily: Andaman & Nicobar Tenders 20 MWh BESS, NLC–OREDA Form Green JV, UPCL Tenders BESS, BERC Reviews 70 MW LTA, REC Transfers Luhri SPV, BERC Reviews OA Charges

    The Andaman and Nicobar administration has invited bids for a 20 MWh grid-connected Battery Energy Storage System (BESS) at Dollygunj, Port Blair. The project is aimed at strengthening grid stability…

    Yellow Door Energy, Nedbank CIB Reach Financial Close on 49 MWp Lion Thorn Solar Park in South Africa

    Yellow Door Energy and Nedbank Corporate and Investment Banking (Nedbank CIB) have achieved financial close for the 49 MWp Lion Thorn Solar Park in Leeudoringstad, North West, South Africa, paving…

    Have You Seen?

    AI Could Unlock $230B for Oil, Gas, OFSE Cos, McKinsey Says

    • September 2, 2026
    AI Could Unlock $230B for Oil, Gas, OFSE Cos, McKinsey Says

    Galactic Energy joins reusable rocket race

    • September 2, 2026
    Galactic Energy joins reusable rocket race

    Galactic Energy joins reusable rocket race

    • September 2, 2026
    Galactic Energy joins reusable rocket race

    Meritus enters Arizona market with Allied Gases and Welding Supplies acquisition

    • September 2, 2026
    Meritus enters Arizona market with Allied Gases and Welding Supplies acquisition

    US LNG exports up 23% in first half of 2026, reports EIA

    • September 2, 2026
    US LNG exports up 23% in first half of 2026, reports EIA

    Switzerland launches cross-border BECCS CO2 supply chain

    • September 2, 2026
    Switzerland launches cross-border BECCS CO2 supply chain

    Column: How energy-efficient motors can cut biogas plant costs

    • September 2, 2026
    Column: How energy-efficient motors can cut biogas plant costs

    Qatar and UAE LNG cargoes transferred ship-to-ship outside Hormuz

    • September 2, 2026
    Qatar and UAE LNG cargoes transferred ship-to-ship outside Hormuz

    India Daily: Andaman & Nicobar Tenders 20 MWh BESS, NLC–OREDA Form Green JV, UPCL Tenders BESS, BERC Reviews 70 MW LTA, REC Transfers Luhri SPV, BERC Reviews OA Charges

    • September 2, 2026
    India Daily: Andaman & Nicobar Tenders 20 MWh BESS, NLC–OREDA Form Green JV, UPCL Tenders BESS, BERC Reviews 70 MW LTA, REC Transfers Luhri SPV, BERC Reviews OA Charges

    Yellow Door Energy, Nedbank CIB Reach Financial Close on 49 MWp Lion Thorn Solar Park in South Africa

    • September 2, 2026
    Yellow Door Energy, Nedbank CIB Reach Financial Close on 49 MWp Lion Thorn Solar Park in South Africa