Karnataka Finalizes New Solar Tariffs And Reforms For FY26 To Boost Distributed Generation

Representational image. Credit: Canva

The Karnataka Electricity Regulatory Commission has issued an order on July 9, 2025, for determining tariffs and norms for solar power projects in the state for the period from July 1, 2025, to June 30, 2026. The order covers grid-connected ground-mounted and distributed solar photovoltaic projects, including rooftop systems. The decision follows the release of a discussion paper on March 18, 2025, and a public hearing held on June 6, 2025, where various stakeholders submitted comments and suggestions.

The Commission approved benchmark tariffs of ₹3.07 per unit for megawatt-scale ground-mounted solar projects and ₹3.08 per unit for distributed solar PV systems from 1 kW up to sanctioned load for non-domestic consumers. For domestic consumers with 1 kW to 10 kW capacity, the tariff is ₹3.86 per unit without capital subsidy. Under the PM Surya Ghar Muft Bijli Yojana, the tariffs are ₹2.30 for 1–2 kW, ₹2.48 for 2–3 kW, and ₹2.93 for above 3 kW with subsidy. These tariffs apply to new projects commissioned between July 1, 2025, and June 30, 2026.

The Commission introduced significant reforms such as renaming “Solar Rooftop PV Plants” to “Distributed Solar PV Plants” and expanding the eligible installation sites to include rooftops, elevated ground structures, and building facades. Virtual Net Metering (VNM) and Group Net Metering (GNM) were allowed, enabling multiple consumers or multiple connections of the same consumer to share solar generation benefits.

For domestic consumers up to 150 kW, the requirement to sign a power purchase agreement (PPA) has been eliminated, and terms are now included in the online application process. Timelines have been set for applications, inspections, and commissioning, with penalties imposed on distribution licensees for delays.

The Commission also decided not to mandate battery storage with distributed solar PV under net metering, citing cost concerns. Open access consumers are now permitted to adopt net or gross metering or set up captive plants. Shifting of existing solar installations within the same licensee’s jurisdiction is allowed without changing PPA terms.

The Commission retained key financial parameters such as a 25-year project life, 70:30 debt-equity ratio, 19% capacity utilization factor, and 11.10% interest on debt. Capital costs were fixed at ₹40,000 per kW for domestic DSPV, ₹30,000 per kW for others, and ₹321.53 lakh per MW for ground-mounted projects. Operation and maintenance costs were set at ₹791.31 per kW for DSPV and ₹5.945 lakh per MW for ground-mounted plants, with 5.72% annual escalation.

The final order includes rules on metering, grid connectivity, energy accounting, and multiple installations. Consumers are allowed to install certified solar equipment without being restricted to empanelled vendors. The order was signed by the Chairman and Members of the Commission and comes into effect immediately.

 

  • Related Posts

    Nordex Enters New Zealand Wind Market With 192 MW Mercury Order

    The Nordex Group has entered the New Zealand wind energy market after securing its first order in the country from Mercury, one of New Zealand’s major electricity generation and retail…

    India Hosts AgriVoltaics World Conference 2026, Announces New Programme Under PM-KUSUM

    India has hosted the AgriVoltaics World Conference 2026 for the first time in the Global South, bringing together policymakers and experts to discuss the integration of solar power generation with…

    Have You Seen?

    Nordex Enters New Zealand Wind Market With 192 MW Mercury Order

    • October 22, 2026
    Nordex Enters New Zealand Wind Market With 192 MW Mercury Order

    India Hosts AgriVoltaics World Conference 2026, Announces New Programme Under PM-KUSUM

    • October 22, 2026
    India Hosts AgriVoltaics World Conference 2026, Announces New Programme Under PM-KUSUM

    Tata Power-DDL to Hold National Lok Adalat on October 25 for Electricity Theft Case Settlements

    • October 22, 2026
    Tata Power-DDL to Hold National Lok Adalat on October 25 for Electricity Theft Case Settlements

    Adani Green Energy Operational Capacity Rises 24% to 20,763 MW in H1 FY27

    • October 22, 2026
    Adani Green Energy Operational Capacity Rises 24% to 20,763 MW in H1 FY27

    Hartek Power Secures INR 200 Crore Contract for 80 MW Solar EPC Project in Uttar Pradesh

    • October 22, 2026
    Hartek Power Secures INR 200 Crore Contract for 80 MW Solar EPC Project in Uttar Pradesh

    India’s Top State Refiner to Reduce Middle East Term Oil Purchases

    • October 22, 2026
    India’s Top State Refiner to Reduce Middle East Term Oil Purchases

    EBRD Arranges $265 Million Financing For 1.2 GW Solar Project And 600 MWh BESS In Egypt

    • October 22, 2026
    EBRD Arranges $265 Million Financing For 1.2 GW Solar Project And 600 MWh BESS In Egypt

    Amperehour Energy And Ampt Partner To Expand DC-Coupled Battery Storage Solutions Across Global Markets

    • October 22, 2026
    Amperehour Energy And Ampt Partner To Expand DC-Coupled Battery Storage Solutions Across Global Markets

    NTPC REL Invites Bids For Spare Inverter For 200 MW Gujarat-I Solar Project

    • October 22, 2026
    NTPC REL Invites Bids For Spare Inverter For 200 MW Gujarat-I Solar Project

    IREDA Reports INR 891.75 Crore Half-Year Net Profit As Revenue Rises To INR 4,592 Crore In FY2027

    • October 22, 2026
    IREDA Reports INR 891.75 Crore Half-Year Net Profit As Revenue Rises To INR 4,592 Crore In FY2027