Ameresco Secures Contract From Canadian Department Of National Defence To Develop Solar Energy & Resiliency Infrastructure At Gagetown Base

Representational image. Credit: Canva

Ameresco, Inc., a top energy solutions provider, has won a major solar energy and resiliency project at the 5th Canadian Division Support Base (CDSB) in Oromocto, New Brunswick. This project supports Canada’s goal of powering federal facilities with 100% clean electricity by 2025. The Gagetown Solar Project, worth CAD $26.7 million, will install an 8.9 MWdc/7.35 MWac ground-mounted solar system, generating about 8,900 MWh of electricity annually—covering 20% of the base’s energy needs. This will help the Department of National Defence cut greenhouse gas emissions, preventing 7,695 metric tons of CO₂ emissions per year.

The project includes 14,496 solar panels across the base and will be managed by Ameresco under a 25-year contract. All the energy produced will be used on-site, boosting energy security and resilience. It will also save the base about CAD $1.3 million in annual utility costs. Part of Canada’s Federal Buildings Initiative, the project improves energy efficiency at one of the country’s largest bases, which spans over 200 buildings and 525,000 square meters.

Bob McCullough, President of Ameresco Canada, said “We’re proud to partner with the Department of National Defence on this important project. This solar energy solution is more than about powering Gagetown today — it’s about creating a cleaner, more sustainable future for Canada. By investing in renewable energy, we’re helping the country move closer to its long-term sustainability goals while delivering reliable, cost-effective power for years to come.”

Ameresco will handle the design, engineering, procurement, and construction, ensuring seamless integration with the base’s existing power system. Equipped with advanced monitoring technology, the system will optimize performance over its lifespan. The project is set for completion by June 2025, with Ameresco overseeing operations and maintenance for the next 25 years, guaranteeing efficiency and cost savings.

 

  • Related Posts

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    The global energy transition is entering a decisive phase, driven by record renewable energy deployment, declining technology costs and increasing electrification across transport, buildings and industry. However, progress remains uneven…

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    Solidus Techno Power Private Limited has announced the successful delivery of a 27.31 MWh Battery Energy Storage System (BESS) integrated with a 50 MW solar power project for SBF Ispat…

    Have You Seen?

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    • October 24, 2026
    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    • October 24, 2026
    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    • October 24, 2026
    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    • October 24, 2026
    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    • October 24, 2026
    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    • October 24, 2026
    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    • October 24, 2026
    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    • October 24, 2026
    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    • October 24, 2026
    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)

    • October 24, 2026
    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)