ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

ACCIONA Energía has commenced commercial operations at its Opor and Boraja II wind farms in Croatia, adding a combined 72 MW of wind power capacity to the country’s renewable energy sector. Both projects have completed commissioning and are now supplying electricity to the national grid through Hrvatski Operator Tržišta Energije (HROTE), Croatia’s energy market operator.

The Opor wind farm, located in the Split-Dalmatia region, has an installed capacity of 27 MW and comprises six wind turbines. Boraja II, situated in the Šibenik-Knin region, has a capacity of 45 MW and features ten turbines. Both facilities use 4.5 MW Nordex turbines installed on 105-metre steel towers.

The projects operate under 12-year contracts for difference awarded through a public auction conducted under a programme introduced by the Croatian Government and HROTE. Approved by the European Commission, the programme aims to accelerate renewable energy deployment. The contracts provide a reference price for generated electricity, supporting revenue stability and reducing exposure to fluctuations in wholesale electricity markets.

Together, the two wind farms are expected to generate approximately 203 GWh of clean electricity annually and prevent around 135,000 tonnes of carbon dioxide emissions each year. Their construction also supported employment, creating up to 400 direct jobs during peak construction activity.

With the commissioning of these projects, ACCIONA Energía has increased its installed wind power capacity in Croatia to 102 MW. The company has operated the 30 MW Jelinak wind farm in Split-Dalmatia since 2013.

ACCIONA Energía is also developing the 189 MWp Promina solar plant in Šibenik-Knin, further expanding its renewable energy portfolio in Croatia and strengthening its presence in the country’s clean energy market.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    The global energy transition is entering a decisive phase, driven by record renewable energy deployment, declining technology costs and increasing electrification across transport, buildings and industry. However, progress remains uneven…

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    Solidus Techno Power Private Limited has announced the successful delivery of a 27.31 MWh Battery Energy Storage System (BESS) integrated with a 50 MW solar power project for SBF Ispat…

    Have You Seen?

    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    • October 24, 2026
    Global Energy Transition Requires 38.2 TW Renewable Capacity by 2050, Stronger Grids and Energy Efficiency – Report

    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    • October 24, 2026
    Solidus Techno Power Integrates 27.31 MWh BESS With 50 MW Solar Project For SBF Ispat

    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    • October 24, 2026
    ACCIONA Energía Starts Operations Of 72 MW Wind Farms In Croatia

    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    • October 24, 2026
    Solidus Techno Power Delivers 27.31 MWh BESS For SBF Ispat’s 50 MW Solar Project

    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    • October 24, 2026
    Kerala Engineering College Invites Tender For Green Hydrogen Research Equipment

    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    • October 24, 2026
    RE:MAKE India 2026 to Connect Renewable Energy Manufacturing, Technology and Supply Chains at Yashobhoomi

    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    • October 24, 2026
    NVVN Invites Bids For Rooftop Solar Project At NIB Noida

    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    • October 24, 2026
    Fourth Partner Energy Executes 75 MWp Open Access Solar Park In Maharashtra

    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    • October 24, 2026
    Three Weeks to Go: Thailand Clean Energy Week 2026 Brings Industry Leaders Together in Bangkok

    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)

    • October 24, 2026
    Buskowitz Energy Wins Company of the Year – Solar EPC (Commercial/Industrial)