NaBFID Approves ₹2.72 Billion Loan for KPI Green’s 50 MW Hybrid Project

Representational image. Credit: Canva

KPI Green Energy Limited has secured a financial boost of ₹2.72 billion from the National Bank for Financing Infrastructure and Development (NaBFID) to support the development of its 50 MW hybrid power project in Gujarat. The funding will partially finance the project, which consists of 75.2 MWp solar capacity and 16.95 MW wind capacity, located in the Bharuch district.

The company, in an official filing with the Bombay Stock Exchange (BSE), confirmed that the project will be executed under a 25-year Power Purchase Agreement (PPA) with Gujarat Urja Vikas Nigam Limited (GUVNL). The newly sanctioned credit facility is expected to accelerate project execution and ensure timely completion.

KPI Green Energy emphasized that this development aligns with its long-term vision of expanding its renewable energy footprint. The company has set an ambitious target of achieving 10 GW of installed renewable energy capacity by 2030. The Bharuch-based hybrid project is anticipated to significantly strengthen its clean energy portfolio and contribute towards India’s sustainable energy transition.

This funding from NaBFID highlights the growing financial support for renewable infrastructure projects in India. KPI Green Energy believes that the hybrid power project will play a vital role in advancing the country’s green energy goals while reinforcing its own commitment to providing environmentally sustainable power solutions.

 

  • Related Posts

    JinkoSolar Secures 53MW of Tiger Neo 3.0 Modules for a Ground Power Plant in Kazakhstan Powering Central Asia’s Green Energy Transition

    JinkoSolar has recently signed a 53MW module supply agreement with customers in Kazakhstan, with all projects to be equipped with Tiger Neo 3.0 high-efficiency modules. This includes 23MW in the…

    LONGi Academy Hosts Successful Energy Transformation Forum in Amman

    LONGi Academy Hosts Successful Energy Transformation Forum in Amman, Jordan [18 April 2026], through its LONGi Academy platform, successfully concluded the Energy Sector Transformation Challenge Forum, held at Applied Science…

    Have You Seen?

    US-JOINT launched Silicon Valley semiconductor R&D centre

    • April 21, 2026
    US-JOINT launched Silicon Valley semiconductor R&D centre

    GasEntec signs contracts for Dakar LNG terminal

    • April 21, 2026
    GasEntec signs contracts for Dakar LNG terminal

    UK government grants Riversimple £1.7m to deliver lightweight hydrogen car

    • April 21, 2026
    UK government grants Riversimple £1.7m to deliver lightweight hydrogen car

    Gas Prices Dip Below $4 Per Gallon While Oil Prices Reverse Downtrend

    • April 21, 2026
    Gas Prices Dip Below $4 Per Gallon While Oil Prices Reverse Downtrend

    Air Canada Scraps Key U.S. Routes Amid High Fuel Prices

    • April 21, 2026
    Air Canada Scraps Key U.S. Routes Amid High Fuel Prices

    UK to increase electricity levy and plans fixed price contracts for renewables

    • April 21, 2026
    UK to increase electricity levy and plans fixed price contracts for renewables

    UK to increase electricity levy and plans fixed price contracts for renewables

    • April 21, 2026
    UK to increase electricity levy and plans fixed price contracts for renewables

    UK hydrogen-based synthetic gas start-up raises £25m

    • April 21, 2026
    UK hydrogen-based synthetic gas start-up raises £25m

    Analysis: Why helium’s structural constraints are exposed by geopolitical shocks

    • April 21, 2026
    Analysis: Why helium’s structural constraints are exposed by geopolitical shocks

    Trump Signals No Ceasefire Extension

    • April 21, 2026
    Trump Signals No Ceasefire Extension