Andaman & Nicobar Invites Bids For 20 MWh Battery Storage Project At Dollygunj

Representational image. Credit: Canva

The Andaman & Nicobar Administration has taken a major step toward improving energy reliability in the islands with the announcement of a new project focusing on battery storage. The Secretary (Power), acting on behalf of the President of India, has invited online bids for setting up a 20 MWh grid-connected Battery Energy Storage System in the South Andaman Region. The project site has been identified at Dollygunj, Sri Vijaya Puram. This initiative aims to stabilize the grid, manage peak load demand, and support the overall energy security of the islands, which often face power fluctuations due to their remote location and dependence on limited generation sources.

The project will be developed under the RESCO model on a Build-Own-Operate basis. The bidder selected through tariff-based competitive bidding will be responsible for building, owning, and operating the system for a period of 12 years. They must also ensure smooth operations and maintenance throughout this duration. The tender emphasizes performance guarantees related to system availability, overall efficiency, and battery health retention, which are important factors for long-term stability and economic viability of a storage-based system.

The total estimated cost of the project is about ₹60 crores. Interested bidders are required to submit an Earnest Money Deposit of ₹1,20,00,000 as part of their bid submission. However, the administration has provided relief for Micro, Small, and Medium Enterprises registered under NSIC, DIC, or Udyog Aadhar, as they are eligible for an exemption from the EMD. In the case of consortiums, every member of the group must be a registered MSME to qualify for this exemption. Bidders applying for the exemption must submit valid supporting documents and scanned certificates during the tender process.

The tender is open only to bidders who meet the minimum technical and financial standards outlined in the Request for Selection or Request for Proposal documents. Applicants must have a valid GSTN, PAN, and comply with EPF and ESI norms where applicable. They must also show prior experience in battery storage or hybrid BESS projects. Depending on the provisions in the tender documents, consortiums and joint ventures may also be allowed to participate, but only under the conditions specified in the RFS or RFP.

The tender notice was issued on January 8, 2026. Important dates for the pre-bid meeting, bid submission, and technical bid opening are provided on the Tender Information System on the official e-procurement portal. Interested bidders must check the portal for the complete schedule and further clarifications. This project represents a critical move toward modernizing the energy infrastructure of the Andaman & Nicobar Islands and supporting future growth in the region.


Subscribe to get the latest posts sent to your email.

 

  • Related Posts

    India Daily: India Power Capacity Tops 550 GW, CEA Sets New Cybersecurity Rules, CSPDCL Advances 500 MWh BESS, India Accelerates Smart Meters, Kerala Rejects KINESCO Licence and More…

    India’s installed power capacity reached around 552 GW by July 2026, with non-fossil sources contributing more than 300 GW, or over 54% of the total. Solar has emerged as a…

    CERC Approves GNA Milestone Extensions With New Charges For Renewable Energy Projects

    The Central Electricity Regulatory Commission (CERC) has approved a uniform framework allowing renewable power developers additional time to meet key operational milestones under the General Network Access (GNA) Regulations. The…

    Have You Seen?

    Kazakhstan Accuses Big Oil of $10.7 Billion Corruption in Kashagan Oil Project

    • August 15, 2026
    Kazakhstan Accuses Big Oil of $10.7 Billion Corruption in Kashagan Oil Project

    Hormuz Tanker Traffic Slumps as U.S.-Iran Standoff Drags On

    • August 14, 2026
    Hormuz Tanker Traffic Slumps as U.S.-Iran Standoff Drags On

    Vance Says Cheap Oil and Gas Is Top U.S. Priority in Iran War

    • August 14, 2026
    Vance Says Cheap Oil and Gas Is Top U.S. Priority in Iran War

    Middle East Oil Tankers Are Going Dark for Longer

    • August 14, 2026
    Middle East Oil Tankers Are Going Dark for Longer

    Drone Strike Sparks Blaze at Key Russian Oil and Fuel Terminal

    • August 14, 2026
    Drone Strike Sparks Blaze at Key Russian Oil and Fuel Terminal

    Hormuz Crisis Pushes Asian Refiners Toward U.S. Oil

    • August 14, 2026
    Hormuz Crisis Pushes Asian Refiners Toward U.S. Oil

    India’s Coal Demand Set to Hit 1.6 Billion Tons by 2030

    • August 14, 2026
    India’s Coal Demand Set to Hit 1.6 Billion Tons by 2030

    Holcim UAE starts cement carbon capture pilot project

    • August 14, 2026
    Holcim UAE starts cement carbon capture pilot project

    Qatar Ras Laffan train five ‘goes offline’

    • August 14, 2026
    Qatar Ras Laffan train five ‘goes offline’

    Vietnam’s Bac Ninh semiconductor investment hits $2.7bn

    • August 14, 2026
    Vietnam’s Bac Ninh semiconductor investment hits $2.7bn